Landsat 8 The Landsat Data Continuity Mission

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Surface Water and Ocean Topography (SWOT) Satellite Mission
NOAA National Geophysical Data Center
VIIRS Data Evaluation Over Thailand and Japan February 13, 2012 Chair, Chris Elvidge NOAA-NGDC 1.
THESIS – the Terrestrial and Habitable-zone Exoplanet Spectroscopy Infrared Spacecraft a concept for a joint NASA/ESA exoplanet characterization mission.
Page 1 Landsat Data Continuity Mission Status Jim Irons LDCM Project Scientist Earth Sciences Division NASA Goddard Space Flight Center Greenbelt, Maryland.
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #22 September 15, 2006 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #24 October 19, 2007 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
ASIC 3 conference/Cal Status Vis/NIR Current and Future Satellites Calibration Status for Current Instruments and Plans for Future Instruments: AVHRR,
VOORBLAD.
15. Oktober Oktober Oktober 2012.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
25 seconds left…...
Slippery Slope
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Weekly Attendance by Class w/e 6 th September 2013.
LANDSAT: The Longest Satellite Data Record of the Earth’s Land Surface.
Landsat Point of Contact USGS Bruce Quirk NGAC Kass Green NGAC Meeting, October 5, 2011.
Welcome to the Aerospace Educator Workshop Saturday, March 8,
History and Features of Landsat 7 By: Andy Vogelsberg Photo of Landsat 7 taken from tures/litho/landsat/land.jpg.
Satellite Thermal Remote Sensing of Boiling Springs Lake Jeff Pedelty NASA Goddard Space Flight Center Goddard Center for Astrobiology.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Geosynchronous Orbit A satellite in geosynchronous orbit circles the earth once each day. The time it takes for a satellite to orbit the earth is called.
Landsat Data Continuity Mission and Beyond Mike Wulder On behalf of Landsat Science Team LDCM SRR/MDR/PNAR April th Global Vegetation Workshop.
1ESDIS HDF-EOS Workshop IV Landover, Maryland, September 20, 2000 The Landsat 7 Processing System ( LPS ) Level Zero-R Science Products Michael R. Reid.
U.S. Department of the Interior 1 Landsat Data Continuity Mission Overview Landsat Ground Station Sioux Falls, SD Representative IC Canada Gilmore Creek.
Remote sensing and in situ measurements in the Global Earth Observing System of Systems Curtis Woodcock, Boston University.
GSFC/Spinhirne 03/13/2002 Multispectral and Stereo Infrared Cloud Observations by COVIR (Compact Visible and Infrared Imaging Radiometer) J. Spinhirne,
Antenna Chetumal: April 22-24, 2008, Mexico City Dimitar Ouzounov 1, Pat Coronado 1, Jim Irons 1,Mike Story 2, Rainer Ressl 3 1 NASA/GSFC, 2 USGS, 3 CONABIO.
Ocean Color Research Team Meeting May 1, 2008 NPOESS Preparatory Project (NPP) Status Jim Gleason NPP Project Scientist.
USGS Status Frank Kelly, USGS EROS CEOS Plenary 2017 Agenda Item #4.14
Landsat Program The World’s Most Sophisticated Optical Observatories of the Earth The World’s Model for International Collaboration in Earth Observation.
Satellite Sensors – Historical Perspectives
USGS Agency Status Landsat Operations Jenn Lacey 21 July 2016
Lunar Observation Data for GIRO Landsat–8 Operational Land Imager
USGS Status Steve Labahn, USGS EROS CEOS LSI-VC-7 Agenda Item 8.0
USGS Status Jenn Lacey, USGS CEOS Plenary 2019 Agenda Item #: 3.6
Presentation transcript:

Landsat 8 The Landsat Data Continuity Mission LDCM SRR/MDR/PNAR 22-24 April 2008 Landsat 8 The Landsat Data Continuity Mission Western States ET Workshop Boise, Idaho October 22, 2012 Jim Irons LDCM Project Scientist Earth Sciences Division NASA Goddard Space Flight Center Greenbelt, Maryland

Enabling 40 Years of Global Land Surface Observations Landsat History Enabling 40 Years of Global Land Surface Observations

NASA leads development and launch of satellite observatory NASA / USGS Parnership NASA leads development and launch of satellite observatory Spacecraft Two-instrument payload Operational Land Imager – OLI Thermal Infrared Sensor – TIRS USGS leads ground system development and post-launch operations Mission Operations Center – MOC Ground Network Element – GNE Data Processing and Archive System (DPAS)

Project Status Courtesy of Orbital

Landsat 8 on schedule for February 11 launch date Atlas V 401 launch vehicle selected by NASA Kennedy Space Center Contract with United Launch Alliance (ULA) Kickoff meeting held in October 2010 Launch will be from Vandenberg Air Force Base (VAFB), California

LDCM Atlas V Lower Stage ULA Facility, Decatur, Alabama

Upper and Lower Stages Now at VAFB Lower stage arrived via Antonov AN-124 aircraft flight on August 27 Upper stage Centaur arrived September 14 via truck

Integrated Satellite Observatory

Observatory Testing at Orbital The observatory is in the final phases of testing at the Orbital Science Corp. facility in Gilbert, Arizona Successfully completed electromagnetic interference / electromagnetic compatibility (EMI/EMC) in August Successfully completed dynamics testing (acoustics and vibration) in September The final phase of testing, thermal vacuum (T/Vac) began Saturday, October 20 Shipment to VAFB scheduled for December EMI/EMC Test Chamber at Orbital

Thermal Infrared Sensor (TIRS) TIRS built in-house at NASA/Goddard Space Flight Center TIRS was officially added to the scope of the mission in December 2009 Critical Design Review held April 2010 Fully assembled & tested TIRS shipped to Orbital on February 08, 2012 TIRS was not added to the payload until western states water managers, with organization by the Western States Water Council, advocated for restoration of Landsat thermal imaging requirements 10

Fully Assembled TIRS Instrument description Two spectral bands at 10.8 and 12 micrometers 100 m spatial resolution Pushbroom LWIR sensor Four-lens telescope FPA consisting of three 2-dimensional Quantum Well Infrared Photodector (QWIP) sensor chip assemblies Mechanically cooled focal plane; BATC provided cryo cooler NEdT @ 300K < 0.4 Mass: 240 Kg Operational Power: 380 W Size: 80 cm x 76 cm x 43 cm (with earth shield deployed)

TIRS and ETM+ Spectral Bands L7 ETM+ Thermal Band LDCM TIRS Band Requirements Band 6 60 m LWIR 10.00 - 12.50 100 m LWIR 10.30 – 11.30 Band 10 100 m LWIR 11.50 – 12.50 Band 11

Operational Land Imager (OLI) OLI built by Ball Aerospace & Technology Corp. (BATC) of Boulder, CO Contract awarded in July 2007 Critical design review held October, 2008 Fully assembled & tested OLI shipped to spacecraft vendor on October 02, 2011

Fully Assembled OLI Instrument description 8 VIS/NIR/SWIR bands w/ 30 m spatial resolutions one panchromatic band w/ 15 m resolution Pushbroom sensor Four-mirror telescope with front aperture stop Focal Plane Assembly (FPA) consisting of 14 sensor chip assemblies, passively cooled Absolute radiometric accuracy < 5% Mass: 450Kg Operational Power: 160 W Size: 1.8 m x 2 m x 1 8 m

OLI Spectral Bands

Top Level Mission Ops Concept - Continuity Fly Landsat 8 in legacy orbit (705 km, near-polar, sun-synchronous) Ground tracks maintained along heritage WRS-2 paths with 10:00 a.m. equatorial crossing time & 16 day repeat period Collect image data for multiple spectral bands (Vis/NIR/SWIR/TIR) across 185 km swath along each path Provide coverage of global land mass each season by scheduling the collection of 400 WRS-2 scenes per day Maintain rigorous calibration Archive data and distribute data products Provide nondiscriminatory access to general public, generate Level 1 data products, distribute data products at no cost upon request Direct broadcast of data to network of international ground stations having memoranda-of-understanding with USGS

Take-Away Messages Landsat 8 launch date is February 11, 2013 Nominal operations begin 90 days after launch OLI and TIRS will provide the best Landsat data in the proud, 40 year history of the program TIRS would not be on the satellite without the support of western states water managers USGS EROS will distribute Landsat 8 data products for free Continues current Landsat data policy 17

http://www.facebook.com/NASA.Landsat Twitter Site Web Sites http://landsat.gsfc.nasa.gov http://landsat.usgs.gov http://www.nasa.gov/landsat FaceBook Page http://www.facebook.com/NASA.Landsat Twitter Site http://twitter.com/#!/NASA_Landsat

Back Up

February 11, 2013

Polar Orbits for Global Views

Urgency Landsat 7 - 7 years beyond design life Gyro 3 Failure (Shut down May 5, 2004) Working additional improvements for software gyro Other Spacecraft Issues (non-critical) Solid State Recorder – 4 memory boards Electrical Power Subsystem – shunt #14 and shunt #6 Fuel Line Thermostat Scan Line Corrector Failure (May 31, 2003) Bumper Mode Operations (April 1, 2007) Landsat 5 - 24 years beyond design life Launched in 1984 with three year design life Operations suspend in November, 2011 LDCM - launch February, 2013 Five year design life (through 2017) A launch failure would virtually guarantee a multi-year data gap

ETM+ SLC Failure Impact Note that the images show partial scenes, from the western edge through the scene center.

LDCM Spacecraft Spacecraft contract awarded to General Dynamics Advanced Information Systems (GDAIS) in April, 2008 GDAIS sold to Orbital Sciences Corporation in April 2010 Space craft will accommodate OLI and TIRS Provides pointing, power, data capacity, etc. to support LDCM operations Orbital Sciences Corporation is integrating OLI and TIRS onto the spacecraft at their Gilbert, AZ facility and will ship the observatory to the launch site in Autumn 2012

Ground System Operational Architecture