JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.

Slides:



Advertisements
Similar presentations
The Hungarian Green Investment Scheme Gyorgy Lazi THE WORLD BANK Energy and Infrastructure Unit, Europe and Central Asia Region.
Advertisements

Climate Change and Finance for Small and Medium-sized Enterprises Sofia, Bulgaria 9 October 2013 International Policy on Climate Change Diana Todorova.
Perspective of JI in Hungary József Feiler Climate Change Unit.
ARTICLE 6 (JOINT IMPLEMENTATION) SUPPLY-SIDE PERSPECTIVES Ivona Grozeva MINISTRY OF ENVIRONMENT AND WATER - BULGARIA Montreal, Side event 30 Nov. 2005COP/MOP1.
Preparatory work on JI in Bulgaria Milya Dimitrova Ministry of Environment and Water, Bulgaria UNFCCC Technical Workshop on Joint Implementation
The Monitoring Mechanism of greenhouse gas emissions from the European Community Hartmut Behrend European Commission DG ENV.C.2, Brussels.
1 CF Assist Activities in Central and Eastern Europe Helmut Schreiber Annual Meeting of the Host Country Committee on Carbon Finance February 15-16, 2005.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
1 Georg B ø rsting Chair of the JI Supervisory Committee Joint Implementation 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means to.
AAU trading standards: the Latvian Approach Ilze Prūse Head of the Pilot Projects Implementation Division of the Climate and Renewable Energy Department.
The Hungarian Green Investment Scheme Gyorgy Lazi THE WORLD BANK Energy and Infrastructure Unit, Europe and Central Asia Region.
JBIC’s New Operation for Environmental Projects “GREEN” Takahiro Hosojima Chief-representative in Rio de Janeiro Japan Bank for International Cooperation.
Green investment scheme and climate change mitigation policy in Ukraine Stavchuk Iryna Climate change program coordinator National ecological centre of.
UKRAINE: JI PROJECTS IMPLEMENTATION Svitlana Nigorodova Ministry of Environment of Ukraine.
Kazakhstan: Status of Climate Change Activities Saulet Sakenov, Climate Change Coordination Center.
CONTRACTING FOR CARBON Legal Framework for JI Projects under the Kyoto Protocol.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Carbon markets An international tool for cost-effective GHG mitigation.
Climate Change and CDM in Thailand
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Finland’s national system for estimating, reporting and archiving greenhouse gas inventory information UNFCCC Workshop on National Systems under Article.
Climate Change Related Activities in Romania Dumitra MEREUTA Ministry of Environment and Sustainable Development - June 2007, Bucharest -
Dr. I.Purica Ministry of Environment Romania Kyoto Protocol and its implementation in Romania.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
The implementation status of specific mechanisms under Kyoto Protocol EU-ETS 13 May 2013 Geta Diaconu.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
Pilot Project on the Use of Flexible Instruments for Climate Policy in Baden-Wuerttemberg: A Manual to Facilitate Companies Participation Fraunhofer Institute.
POLAND AS JOINT IMPLEMENTATION HOST COUNTRY – GREAT POTENTIAL CONTRA POOR MANAGEMENT? Anna Pasławska, EPA SP. Z O.O. European Wind Energy Conference &
Green Investment Scheme in Bulgaria Christo Christov, Energy Institute, Bulgaria Workshop Facilitation Green Investment Scheme: first lessons learnt and.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
The Danish JI Program UNFCCC Workshop on the Implementation of Article 6 projects under the Kyoto Protocol Moscow, May 2004 by Ulla Blatt Bendtsen,
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Prasetyadi Utomo Ministry of Environment of Indonesia CD4CDM Workshop Pathumthani, Thailand 19 – 21 October, 2005 Indonesia’s Policy on CDM Implementation.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Presentation “Green Investment Schemes – greenhouse gas emissions quotas trading mechanisms in Ukraine according to the Kyoto Protocol to the Convention.
Bosna i Hercegovina Agencija za statistiku Bosne i Hercegovine Bosnia and Herzegovina Agency for Statistics of Bosnia and Herzegovina Using official statistics.
Joint Implementation by the Netherlands Maurits Henkemans Ministry of Economic Affairs Netherlands Moscow.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
1 Republic of Kazakhstan: Status of Climate Change Activities Kanat Baigarin, Head of the Climate Change Coordination Center  Population 15,8 million.
CLEAN DEVELOPMENT MECHANISM IN BELIZE By Ann Gordon Ministry of Natural Resources and the Environment 14 th July 2011.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Baseline Setting and Monitoring: Sectoral Approaches Joint Implementation Expert Workshop, United Nations Framework Convention on Climate Change 9 March.
July 3 – 4, 2003, Szentendre Dr. Valdemars Scerbaks MSc Peteris Blumats.
Designated National Authority of Clean Development Mechanism (DNA-CDM) By: Prof. Dr. Mohamed A. El-Shahawy Supervisor of Climate Change Unit Egyptian Environmental.
The European Union Climate Policy and Related Data Needs Velina Pendolovska European Commission, DG Climate Action Meeting on Climate Change Related Statistics.
Ministry of Science, Technology and the Environment, Malaysia CLEAN DEVELOPMENT MECHANISM: MALAYSIA’S EXPERIENCES BY DR NADZRI YAHAYA DEPUTY DIRECTOR CONSERVATION.
Green Investment Scheme in Russia: Perspectives and Constraints Julia Dobrolyubova Expert on Climate Change and Kyoto Protocol REC/CEU GIS Workshop
Climate Change October Main concepts Climate change – lasting change of some or all characteristics, describing the average weather condition Greenhouse.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Policy, normative base and experience of Kyoto Protocol implementation in Bulgaria and other Central European Countries Daniela Stoycheva Consultant emissions.
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
UNFCCC COP 19 The case of Turkish Industry on transition to low carbon economy: Opportunities and Challenges.
Western Balkans Climate Resilience Workshop, Vienna, 11 – 12 May 2016.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Scientific Engineering Centre “BIOMASS”IETP NAS of Ukraine Benefits to and obstacles for Joint Implementation projects Oleksandr Filonenko Bonn, February.
MINISTRY OF ECOLOGY AND NATURAL RESOURCES OF UKRAINE
Joint Implementation in Romania
Dr. Popi KONIDARI Research Fellow of KEPA Prof. Dimitrios MAVRAKIS
Valdis Bisters Director Climate Policy and Technology Department
Current Status of Carbon Market in Thailand
Progress in Implementation Process
Bulgaria and art.5(1) of the Kyoto Protocol
The various tracks of JI…
REReP regional meeting on “Energy and climate” in South Eastern Europe
Joint implementation and eligibility requirements
Possibilities for promoting environmental protection projects
Presentation transcript:

JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA

MINISTRY OF ENVIRONMENT AND WATER 4 Climate Change policy and l egal framework 4 Institutional framework 4 Current status in meeting the eligibility requirements for JI First Track 4 Procedures for JI projects approval 4 JI projects under development 4 Opportunities for JI projects in Bulgaria 4 Future actions Main points

MINISTRY OF ENVIRONMENT AND WATER 3 Firm intention to join the international efforts for climate change mitigation Main principles of the Bulgarian Climate Change Policy 3 Placing no barriers in front of the development of the national economy 3 Desire to attract investments to support the implementation of the national policy and measures on climate change

MINISTRY OF ENVIRONMENT AND WATER 3 The Kyoto Protocol to the UNFCCC is a part of the national legislation after its ratification in 2002 / Art. 5, § (4) of the Bulgarian Constitution / Legal framework 3 Decision of the Council of Ministers on the adoption of the National Action Plan on Climate Change /NAPCC / 3 Memoranda of Understanding with the Netherlands, Austria, Switzerland, Denmark and the Prototype Carbon Fund (World bank)

MINISTRY OF ENVIRONMENT AND WATER Institutional framework 3 Steering Committee for assessment of JI projects - Chair person - the Deputy Minister of environment, 12 members from relevant ministries 3 Ministry of Environment and Water - implementation of the climate change policy /UNFCCC, Kyoto Protocol/ JI sector within the Ministry 3 Interinstitutional Commission on Climate Change /ICCC / - political body for the implementation of the NAPCC. Chair person - the Deputy Minister of environment, high level officials from 17 ministries

MINISTRY OF ENVIRONMENT AND WATER Current status in meeting the eligibility requirements for JI First Track One (1) + It has submitted annually a greenhouse gas inventory report - National system for the estimation of GHG emissions will be in place - National registry – will be developed in Supplementary information on the assigned amounts AAs will be submitted + Bulgaria is a Party to the Kyoto Protocol + Its Assigned Amount Units have been calculated and recorded

MINISTRY OF ENVIRONMENT AND WATER Procedures for JI Projects Approval (1) 1. Project Idea Note → Letter of Endorsement 2. Project Design Document (PDD) (incl. Baseline study, Calculation of emission reductions, Monitoring plan, Environmental Impact Assessment) → Letter of Approval 3. Validation by Independent Entity – Validation report 4. Assessment by the JI Steering Committee

MINISTRY OF ENVIRONMENT AND WATER Procedures for JI Projects Approval (2) 5. Emission Reduction Purchase Agreement - between the project owner and the buyer country 6. Implementation of the project – monitoring and verification by independent entity 7. Transfer of verified emission reductions through the national registry

MINISTRY OF ENVIRONMENT AND WATER JI projects under development (1) The Netherlands (EruPT-3) Landfill gas extraction and utilization in Bulgaria (2 projects); Landfill gas extraction and utilization in Bulgaria (2 projects); Reduction of greenhouse gas by gasification of three municipalities. Reduction of greenhouse gas by gasification of three municipalities. (EruPT-4) Landfill gas extraction and utilization in Bulgaria; Landfill gas extraction and utilization in Bulgaria; Reduction of greenhouse gas by gasification of one municipality; Reduction of greenhouse gas by gasification of one municipality;

MINISTRY OF ENVIRONMENT AND WATER JI projects under development (2) Co-generation at industrial company; Co-generation at industrial company; Cogeneration at district heating companies (2 projects); Cogeneration at district heating companies (2 projects); Small hydro power plant; Small hydro power plant; Wind energy; Wind energy; Reduction of N20 at fertilizer plants (2 projects) Reduction of N20 at fertilizer plants (2 projects) Austria Large hydro power plant; Large hydro power plant; Co-generation and energy efficiency at carton production plant; Co-generation and energy efficiency at carton production plant;

MINISTRY OF ENVIRONMENT AND WATER JI projects under development (3) Switzerland Rehabilitation and modernization of the heat sources at district heating company; Rehabilitation and modernization of the heat sources at district heating company; Prototype Carbon Fund Biomass utilization at pulp and paper plant; Biomass utilization at pulp and paper plant; Rehabilitation of 2 district heating companies. Rehabilitation of 2 district heating companies.

MINISTRY OF ENVIRONMENT AND WATER Opportunities for JI projects in Bulgaria 3 Renewable energy sources (biomass, biogas, small hydro, wind, solar and geothermal) 3 Combined heat and power generation 3 Fuel switch 3 Energy efficiency (industry, residential buildings, transport) 3 Waste processing (biogas)

MINISTRY OF ENVIRONMENT AND WATER Future Policies and Actions 3 Directive on EU Emission Trading Scheme - EU accession in 2007, approximation with the Acquis communautaire - National allocation plan 3 Green investment scheme

THANK YOU FOR THE ATTENTION !