Paul Bellomo LCLS Power March 30, 2006 1 LCLS Injector, Sector 21 and BC1 New Power Supplies Needed for First Injection.

Slides:



Advertisements
Similar presentations
Safety for electronic systems High-frequency Filtering of DC Power Lines Technical, constructional and practical issues with filtering on dc power lines.
Advertisements

Murray State University
Inspection & Preventive maintenance of breakers
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
E951 POWER SUPPLY 5/13/02 IOANNIS MARNERIS Brookhaven National Labs.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
7154 VFD Presentation #3 May 2002 Paul Weingartner.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
Week 3 Electrical Circuits and Components. It’s a Radio!
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
Lecture 1: Safety and Protection. 1. A robot may not injure a human being or, through inaction, allow a human being to come to harm. 2. A robot must obey.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Chapter 8 Output Modules.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
TE-MPE-EE, 02-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
Electro-Pneumatics Module 1
TE-MPE-EE, 16-Apr CLIQ Power supply design J. Mourao TE-MPE-EE.
LCLS Injector Power Supplies July 28, LCLS Injector Power Supplies for Purchase Paul Bellomo, Antonio de Lira, Dave Mac Nair.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 Power Supply Hazard Analysis Summaries P. Bellomo,
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
Modular Inverter.
February 17-18, 2010 R&D ERL Bob Lambiase R&D ERL Power Supplies Bob Lambiase February 17-18, 2010 Power Supplies.
LCLS Injector Intermediate Power Supply Design Review August 29, LCLS Intermediate Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Codan 5700 Series C-Band Transceiver Technical Overview.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
1 Mario Sedita - INFN-LNS (Italy) - Power Supplies EMI Cabling Elimed - Elimaia Technical Workshop Harfa - Prague.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Electrical Configuration and System Protection
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
SLAC Accelerators Power Electronic System Operation for Reliability
Rectifiers and Filters
SCADA for Remote Industrial Plant
ILC RTML Meeting EDR Planning for Magnet Power Systems
Design of new generation CLIQ units (CLIQ2)
BCTW calibration status and future
GROUND-FAULT GROUND-CHECK MONITOR
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Electrical Safety Equipment
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
ELECTRICAL POWER-II Electrical engineering sixth semester
Murray State University
Injector, Sector 21 and BC1 Bulk Power Supplies
Magnet Controls K. Luchini
Presentation transcript:

Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 New Power Supplies Needed for First Injection P. Bellomo

Paul Bellomo LCLS Power March 30, List of Needed Magnet Power Supplies Refer to the list in the binder Intermediate Power Supplies 6 dipole and quadrupole magnets require 8 power supplies 13 on order, 1 contingency of each type MCOR12 Power Modules 72 corrector, quadrupole and trim magnets require 72 power supplies 75 on order, 3 are contingency MCOR30 Power Modules 12 corrector, quadrupole and trim magnets require 12 power supplies 20 on order, 8 contingency MCOR Bulk Power Supplies 3 needed, 3 ordered, 0 contingency

Paul Bellomo LCLS Intermediate Power Supplies March 30, Intermediate Power Supplies

Paul Bellomo LCLS Intermediate Power Supplies March 30, Output V, I and PAt least 10% greater than magnet standardize value Short term stability100 ppm RMS, 1 second, Long term stability100 ppm RMS, 10 seconds at 30C Stability versus temp  2 ppm / O C – 10 to 100% Ambient40 O F (4 O C) to 113 O F (45 O C) Bandwidth as V source DC to – 3 dB  1,000Hz Bandwidth as I source DC to – 3dB  10Hz Conducted EMC / Life/ MTBF FCC, Part 15, Class A  20 years  100,000 hrs Load 0.05H  L  1.0H, 0.1 s  L/R  1.0 s Performance Requirements

Paul Bellomo LCLS Intermediate Power Supplies March 30,

Paul Bellomo LCLS Intermediate Power Supplies March 30, Inputs to Power Supply from Controller On/OffDiscrete, continuous+5V On, 0V Off Programming VoltageAnalog, continuous0 to +5V, 0 to FSV or 0 to FSI ResetDiscrete, momentary+5V 100ms pulse Outputs from Power Supply to Controller On/Off StatusDiscrete, continuous0V On. +5V Off PS Ready - sum of internal faultsDiscrete, continuous0V ready, +5V not ready Output currentAnalog, continuousFrom transductors – not from PS Output voltageAnalog, continuous0 to +10V, 0 to FSV Ground currentAnalog, continuous0 to +10V, 0 to 100mA Interface

Paul Bellomo LCLS Intermediate Power Supplies March 30, IE Power, Incorporated 12 Falconer Drive, Unit 15 Mississauga, Ontario Canada L5N 3L kW to 22.5 kW 208 V / 480 V input Series and parallelable 27cm H*48cm W*61cm D 8.74” * 19” * 24” Power Supply - Front View

Paul Bellomo LCLS Intermediate Power Supplies March 30, Power Supply - Rear View Totally covered connectors

Paul Bellomo LCLS Intermediate Power Supplies March 30, Current Transductors

Paul Bellomo LCLS Intermediate Power Supplies March 30, GMW Associates 955 Industrial Road San Carlos, CA  +/- 150A or +/- 600A  Accuracy < 2ppm  Linearity < 1ppm  0.3 ppm / C  Bandwidth 100kHz DC Current Transductors

Paul Bellomo LCLS Intermediate Power Supplies March 30, Intermediate PS Hazard Analysis EnergyHazardMitigation Electrical  Arc flash at input circuit breaker  Shock 480VAC, 650VDC, 200VDC  PAB = 1 inch  Stored PS and magnet energy < 20kJ  FPB = 3.7 inches  Category 0 PPE, 00 gloves  Bleeder resistors, ground hooks across filter capacitors, 00 gloves, safety glasses  Totally enclosed chassis  Totally covered PS/magnet terminals  Listed components when possible  EEIP Inspection at SLAC  JHAM and STA qualified workers FireTeaspoon amounts of flammable oil in electrolytic filter capacitors Not required. Other components are non-flammable or fire retardant Gravity100lb chassisTwo workers lift with mechanical assistance. Pressure Radiation NoneNot applicable TemperatureHot chassis/components (100 O C)Warning labels on components

Paul Bellomo LCLS Intermediate Power Supplies March 30, Hazard Analysis

Paul Bellomo LCLS Intermediate Power Supplies March 30, Status Summary Systems Controls established - EI diagrams made to 85% level Power Supplies All here by April 15 Inspection and bench testing April 15 through April 30 Transductors All here and bench tested Remaining tasks Identify cables from the Ethernet switches and terminal servers to the power supply controllers

Paul Bellomo LCLS MCOR Power Supplies March 30, MCOR Powered Systems with Special thanks to Fernando Rafael

Paul Bellomo LCLS MCOR Power Supplies March 30, Uses and Requirements Uses Power 6A, 12A, and 30A correctors, small quadrupoles, and trim magnets that require unipolar or bipolar current Output V, I and PAt least 10% greater than magnet standardize value Short term stability30 ppm RMS, 1 second, Long term stability400 ppm RMS, 10 second at 30C Stability versus temp  13 ppm / O C, 10 to 100% Ambient40 O F (4 O C) to 113 O F (45 O C) Bandwidth as I source XC04, YC04, XC07, YC07 DC to – 3dB  10Hz Load 0.05H  L  1.0H, 0.1 s  L/R  1.0 s

Paul Bellomo LCLS MCOR Power Supplies March 30, The MCOR System

Paul Bellomo LCLS MCOR Power Supplies March 30, The MCOR12

Paul Bellomo LCLS MCOR Power Supplies March 30, The MCOR30

Paul Bellomo LCLS MCOR Power Supplies March 30, MCOR Bulk PS Rating Determination

Paul Bellomo LCLS MCOR Power Supplies March 30, Inputs from Controller to Each Module Inhibit (1 for all 16 modules)Discrete, TTL, continuous0V = On, +5V = Inhibit Programming VoltageAnalog, continuous-10V to +10V, -FSI to +FSI Reset (1 for all 16 modules)Discrete, TTL, momentary Reset on +5V rising edge, 0V otherwise Outputs from Each Module to Controller Output current (feedback)Analog, continuous-10V to +10V, -FSI to +FSI Output current (monitor)Analog, continuous-10V to +10V, -FSI to +FSI Module FaultDiscrete, continuous0V = no fault, +5V = fault MCOR12 Module Interface

Paul Bellomo LCLS MCOR Power Supplies March 30, Inputs from Controller to Each Module Inhibit (1 for all 16 modules)Discrete, TTL, continuous0V = On, +5V = Inhibit Programming VoltageAnalog, continuous-10V to +10V, -FSI to +FSI Reset (1 for all 16 modules)Discrete, TTL, momentary Reset on +5V rising edge, 0V otherwise Outputs from Each Module to Controller Output current (feedback)Analog, continuous-10V to +10V, -FSI to +FSI Output current (monitor)Analog, continuous-10V to +10V, -FSI to +FSI Output voltage (+ line)Analog, continuous-10V to +10V, -FSV to +FSV Output voltage (- line)Analog, continuous-10V to +10V, -FSV to +FSV Module FaultDiscrete, continuous0V = no fault, +5V = fault MCOR30 Module Interface

Paul Bellomo LCLS MCOR Power Supplies March 30, MCOR Hazard Analysis EnergyHazardMitigation Electrical  Arc flash at input circuit breaker  Shock 480VAC, 650VDC, 60VDC in bulk PS and modules  PAB = 1 inch  Stored and magnet energy < 1kJ  FPB = 1 inch  Category 0 PPE, 00 gloves  Bleeder resistors across filter capacitors, 00 gloves, safety glasses  Totally enclosed chassis  Totally covered PS/magnet terminals  Listed components when possible  EEIP Inspection at SLAC  JHAM and STA qualified workers FireTrace amounts of flammable oil in electrolytic filter capacitors in bulk PS Not required. Other components are non-flammable or fire retardant Gravity100lb chassisTwo workers lift with mechanical assistance. Pressure Radiation NoneNot applicable TemperatureHot chassis/components (100 O C)Warning labels on components

Paul Bellomo LCLS MCOR Power Supplies March 30, Status Power Supplies – MCORs 75 of 75 MCOR12s received and bench tested 20 of 20 MCOR30s received and bench tested 9 crates not yet received – due in April 9 crate blowers are here Most connectors are here 3 bulk power supplies received and bench tested Remaining Tasks Identify MCOR to VME crate cable types, configurations and connectors

Paul Bellomo LCLS Ground Current Monitor March 30, MCOR Ground Current Monitor

Paul Bellomo LCLS Ground Current Monitor March 30, MCOR Ground Current Monitor Purpose MCOR system does not include ground current monitoring Indicate when power supply current is straying outside magnet Ramifications Monitored MCOR current is not the magnet current Loss of magnet current causes beam problems Ground current fluctuates causing erratic magnet current Requirements Turn off bulk on excessive ground current Display ground current on local display Separate Injector/Sector 21 and BC1 systems Reference Drawings EI , Schematic Diagram and Chassis Layout

Paul Bellomo LCLS Ground Current Monitor March 30, Ground Current Monitor Concept

Paul Bellomo LCLS Ground Current Monitor March 30, Signal Conditioner and  PLC Dataforth DSCA31-06IDEC Smart Relay

Paul Bellomo LCLS Ground Current Monitor March 30,

Paul Bellomo LCLS Ground Current Monitor March 30, Inputs to Ground Current Monitor from Computer On/Off Command - Bulk PS 1, 2 or 33 Discrete, momentary+24V=On, 0V=Off Remote Reset - Bulk PS 1 & 21 Discrete, momentary+24V=Reset Remote Reset - Bulk PS 31 Discrete, momentary+24V=Reset Inputs to Ground Current Monitor from Other Places Ground I from Bulk PS 1, 2 or 3 resistors3 Analog, continuous0 to +10V = 0 to 100mA Local chassis Reset button, Bulk PS 1, 2, 31 Discrete, momentary+24V=Reset Local chassis Test button, Bulk PS 1,2,31 Discrete, momentary+24V=initiates fault Outputs from Ground Current Monitor to Computer On/Off Status - Bulk PS 1, 2 or 33 Discrete, continuous+24V=On, 0V=Off On/Off/Fault Status - Bulk PS 1, 2 or 3Serial digital data (future)Via Ethernet module Ground Current - Bulk PS 1, 2 or 3Serial digital data (future)Via Ethernet module Outputs from Ground Current Monitor to Others On/Off Command to Bulk PS soft start 1, 2 or 3 3 Discrete, continuous Contact, closed=On, open = Off Ground Current Monitor Interface Requirements

Paul Bellomo LCLS Ground Current Monitor March 30, Ground Current Monitor Status and Remaining Tasks Schematic diagrams completed, but needs redrawing Job Shopper Designer on board Chassis drawing completed but needs redrawing Job Shopper Designer on board Software for microPLC written, but needs revision Parts ordered and received (except for chassis) Fabrication not yet started Identify all interconnecting cables and connectors

Paul Bellomo LCLS Bulk PS Soft-Start March 30, MCOR Bulk Power Supply Soft-Start (Courtesy of Fernando Rafael)

Paul Bellomo LCLS Bulk PS Soft-Start March 30, MCOR Soft-Start Problem SPEAR 3 experienced MCOR30 bridge MOSFET failures during bulk power supply turn on It was determined that, with a fixed front panel controlled set-point, the bulk power supply output voltage was rising too quickly. The MCOR crate auxiliary power supply oscillated Solution and Requirements Soft-start circuit to slowly apply the bulk power supply set-point (and hence ramp the output voltage) after bulk power supply turn on.

Paul Bellomo LCLS Bulk PS Soft-Start March 30, MCOR Soft-Start

Paul Bellomo LCLS Bulk PS Soft-Start March 30, MCOR Soft-Start Status and Remaining Tasks Drawings Schematic diagram and chassis drawings completed PCB layout is needed Cables and connectors need specification Parts Electronic and chassis parts are here Need to purchase PCB Fabrication Chassis and PCBs are not yet started Testing Not started

Paul Bellomo LCLS Bulk PS Soft-Start March 30, Ground Current Monitor and Soft-Start EnergyHazardMitigation Electrical  Shock 120VAC in chassis  Listed components when possible  EEIP Inspection at SLAC  JHAM and STA qualified workers FireNone  Not applicable GravityNoneNot applicable Pressure Radiation Temperature NoneNot applicable

Paul Bellomo LCLS Racks March 30, Power Supply Racks

Paul Bellomo LCLS Racks March 30,

Paul Bellomo LCLS Racks March 30, Rack Requirements References Specification ESD , R0 Seismic Document Drawings (later from Optima) Electrical Requirements Keep personnel from inadvertent contact – shock and arc flash Accept AC power and controls interfaces Maintain ground continuity Be reasonably EMI – proof Mechanical Requirements Carry weight of installed components – 1000 lbs per bay Seismic capable Neatly contain equipment Ventilated so that equipment does not overheat

Paul Bellomo LCLS Racks March 30, Seismic Requirements Reference: I-720-0A24E-002, Specification for Seismic Design of Buildings, Structures, Equipment and Systems at SLAC, December 4, 2000 Item 6, Page 9 – Rack is defined as Programmatic Equipment H & V Floor Response Spectra Page 6, Fig 3 and Page 7, Fig 4 for Mechanical Systems Table 12 – Performance Level 6.5 to 8.5 – Adequate restraint and anchorage. Only minor damage incurred Optima is required to submit rack structural drawings and seismic analysis prior to release for fabrication

Paul Bellomo LCLS Racks March 30, Rack Hazard Analysis EnergyHazardMitigation Electrical  Shock 480V  Arc Flash 0.2cal/cm^2  FPB=5 inches  Class 0 PPE, Class 00 gloves  Proper grounding  All welded construction  Metal straps between doors and frame  EEIP inspection at SLAC FireNoneAll non-flammable materials Gravity  3,000lbs  Review of rack design and fabrication drawings by seismic committee  Secure in accordance with seismic committee guidance Pressure Radiation Temperature NoneNot applicable

Paul Bellomo LCLS Racks March 30,

Paul Bellomo LCLS Racks March 30, Racks Status and Remaining Tasks Purchase order placed with Optima in February Rack design is acceptable - First Article released for fabrication Awaiting Optima seismic analysis Awaiting “First Article” delivery Delivery goal May 30, 2006 Assemble all systems into racks Test systems in racks prior to field installation

Paul Bellomo LCLS Cables March 30, DC Power Cables

Paul Bellomo LCLS Cables March 30, DC Cable and Conductor Sizing Per 2005 NEC Power SupplyRequired I= PS I /DeratingConductor Size 25V, 375A375A/(0.65*0.87) = 663A1/C500kcmil 700A 33V, 300A300A/(0.65*0.87) = 531A350kcmil 570A, use 1/C500kcmil 60V, 165A165A/(0.65*0.87) = 292A1/C2/0AWG 300A 200V, 50A50A/0.87 = 57A3/C#6AWG 75A 60V, 30A30A/0.87 = 34A3/C#10AWG 40A 40V, 12A12A/0.87 =13A3/C#12AWG 30A Basis – copper conductors, 90C insulation, max 45C ambient, 2005 NEC Tables and and cable tray fill per Article 392 for multi-conductor and single conductor cable, respectively. Flexible stranding, low smoke, zero halogen, suitable for cable tray use

Paul Bellomo LCLS Cables March 30, DC Cable Hazard Analysis EnergyHazardMitigation Electrical  Shock  Proper insulation voltage class  Jackets on cables pulled in cable trays  Isolate cables from public via raceways Fire  Overheating  Smoke  Size conductors for ampacity per NEC  Use fire retardant insulations and jackets  Low smoke, zero halogen construction GravityWeight of many cablesSupport systems meet seismic, NEC and NEMA VE-1 requirements PressureNoneNot applicable RadiationNoneNot applicable Temperature  Hot cables from excessive current and/or packing  Size conductors for ampacity per NEC to keep temperatures within insulation rating  Cable tray and raceway fill and isolation per NEC

Paul Bellomo LCLS Power March 30, This is the Last Slide Test, Installation and Commissioning Plan Receive and bench test equipment – procedures exist Install in purchased racks in Building 24 Test as complete systems in B24 – need updated procedure Forklift entire rack assemblies from B24 to Sector 20 Install in Sector 20 Field test power systems – need updated procedure