ILC Activity in Dubna Grigori SHIRKOV Scientific Council, September, 27, 2007.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
1 STATUS OF ILC ACTIVITY AT JINR G. Shirkov Session of RAS, Protvino, December 22, 2008.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
Joint Institute for Nuclear Research Joint Institute for Nuclear Research International Intergovernmental Organization JINR and RUSSIA PARTICIPATION in.
CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25,
JINR Dubna site proposal for ILC G.Trubnikov Joint Institute for Nuclear Research Sendai, March 2008.
The International Linear Collider (ILC) – Dubna Siting Leader – JINR Head Engineer G. Shirkov Международный Линейный Коллайдер.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Towards an International Linear Collider Barry Barish Caltech / GDE 25-July-07.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
1 Albrecht Wagner DESY and the ILC DESY today DESY strategy and funding DESY and the ILC Funding from the European Union KEK/DESY Collaboration.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
30-May-07 LCWS DESY Meeting Global Design Effort 1 A Vision of the Future RDR to ILC Barry Barish LCWS DESY 30-May-07.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
The International Linear Collider: Status of International Mega- Project and Proposal of Siting in Dubna Region Y.Budagov, Y.Denisov, I.Meshkov, G.Shirkov,
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
Joint Institute for Nuclear Research – Joint Institute for Nuclear Research – International Intergovernmental Organization plans of ILC sitting in the.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Status of JINR participation in the ILC G. SHIRKOV GDE Meeting, Dubna, June, 4, 2008.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
1 STATUS OF ILC ACTIVITIES AT JINR J.Budagov, A.Dudarev, M.Lyablin, G.Shirkov, G.Trubnikov, A.Sissakian JINR, Dubna, Russia Presented by A.Dudarev.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Status of JINR participation in the ILC G. SHIRKOV Particle Physics PAC, January, 17, 2008.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
1 Status of the ILC activity at JINR PAC for Particle Physics 29 January 2009 G.V. Trubnikov.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Plans for JINR’s participation in the International Linear Collider Project G.Shirkov, JINR for Particle Physics PAC 26 th meeting, November
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Yasuhiro Okada, Executive Director, KEK
Explanation of the Basic Principles and Goals
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

ILC Activity in Dubna Grigori SHIRKOV Scientific Council, September, 27, 2007

status of international accelerator project of XXI century in high energy physics; status of international accelerator project of XXI century in high energy physics; proposals of ILC sitting in the Dubna region;proposals of ILC sitting in the Dubna region; participation of JINR in the ILC international technical activity participation of JINR in the ILC international technical activity ILC Activity in Dubna:

ILC is the main and the only international project in high energy and elementary particle physics at the moment ILC is the Fourth Generations of e+e- Colliders I II III IV

The final scientific goals of ILC as well as the time schedule of construction will be accomplished in concert with physical achievements at LHC as well as at other accelerator and nonaccelerator experiments including neutrinos, astrophysics and etc. PRECISION TERASCALE PHYSICS AT ILC The electromagnetic and nuclear forces unify at the Terascale.

The total cost of ILC without detectors is about B$ in dependence on the site country, the geological structure, the deep of tunnel layout and etc. Participation of Russia in the erection of ILC, in particular at the Russian territory, will provide the development not only the fundamental science but a wide spectrum of applications and high technology including the nanotechnology in Russia

Energy – need to reach at least 500 GeV CM as a start Luminosity – need to reach 10^34 level Linear Collider is based on two main challenges: ILC is based on the TESLA superconducting RF cavities with 31.5 MV/m (as well as X-FEL and FLASH at DESY)

How to get Luminosity To increase probability of direct e + e - collisions (luminosity) and birth of new particles, beam sizes at IP must be very small E.g., ILC beam sizes just before collision (500GeV CM): 500 * 5 * nanometers (x y z) Vertical size is smallest

New scheme of the ILC (according to RDR)

ILC Parameters ( I stage ) Parameter range established to allow for operational optimization Max. Center-of-mass energy500GeV Peak Luminosity~2x /cm 2 s Beam Current9.0mA Repetition rate5Hz Average accelerating gradient31.5MV/m Beam pulse length0.95ms Total Site Length31km Total AC Power Consumption~230MW

Nominal and Design range of ILC beam parameters at the IP. The min. and max. columns indicate the span of the design range for each parameter. ILC beam parameters at the Interaction Point

Conventional Facilities 72.5 km tunnels ~ meters underground (for US, Asia, and CERN cites) 13 major shafts > 9 meter diameter 443 K cu. m. underground excavation: caverns, alcoves, halls 92 surface “buildings”, 52.7 K sq. meters = 567 K sq-ft total –Three RF/cable penetrations every rf unit –Safety crossovers every 500 m –34 kV power distribution Main Linac Double Tunnel

Value Estimate The estimate contains three elements: The value and explicit labor estimates are current as of

Global Design Effort Structure at the Stage of Engineering Design Report

GDE ILC Engineering Design Phase Project

International Linear Collider Timeline (optimistic)

RDR: Sample Sites

AMERICAS FERMILAB SAMPLE SITE

ASIAN SAMPLE SITE Longitudinal Section

Longitudinal Frofile EUROPEAN SAMPLE SITE - CERN The present solution of ILC is hypothetical at CERN The near future: LHC, LHC development, CLIC technology; In the future: ILC based on the CLIC technology

EUROPEAN SAMPLE SITE - DESY Longitudinal Section TESLA as “the father” of ILC was not approved by Germany FLASH and XFEL projects at DESY are based on the TESLA technology

Layout of ILC in the Moscow Region Moscow region Tver region

In front: Russian Satellite Communications Center In the back ground: the starting point of ILC layout, between Dubna and Volga rivers

Advantages of the ILC construction in Dubna: 1.JINR as a basic scientific and organizational structure with international intergovernmental organization. 2.An unique opportunity to solve the problem of value at the purchase of land. Prevalent legal practice makes it possible to get the land of the ILC location to permanent free use just as it has been done for JINR, according to the agreement between JINR and the RF government. 3.The proposed territory is extremely thinly populated and practically free of industrial structures, rivers and roads. 4.The area is absolutely steady seismically and has stable geological characteristics. 5.A flat relief and the unique geological conditions allow one to place ILC on a small depth (about 20 m) in the dry drift clay and to perform construction of tunnels, experimental halls and other underground objects with the least expenses, including open working.

6. There are sources of the electric power of sufficient capacity : transmission line of 500 kV, the Konakovo electric power station and the Udomlia atomic power plant. 7. The developed system of transport and communication services, advantageous location, good highways and railways, water-way (the Volga river basin), good position in the European region; 8. Presence of a modern network and information infrastructure, including one of the largest center in Europe the “Dubna” Satellite Communication Center. 9. A special the economic zone established in Dubna in 2005 provides preferential terms for development and manufacture of high technology technical production. 10. A powerful scientific and technical potential of Dubna makes it possible to involve additionally specialists from world scientific centers into the already formed international collective of highly-qualified scientific manpower providing comfortable conditions for them to work.

The ILC linear accelerator could be placed in the dry drift clay at the depth of 20 m (at the mark of m). Below the tunnel there should be impermeable soil preventing from the underlying groundwater inrush. It is possible to construct tunnels of the accelerating complex using tunnel shields with a simultaneous wall timbering by tubing or falsework concreting.

Milestones of ILC activity at JINR Nov 2005 – PAC Particle Physics – proposal about ILC sitting in Russia, near Dubna; Dec 2005 – GDE, Frascatti – the delegation of JINR and the first proposals of A.N. Sissakian of JINR participation in the Global Design Efforts and Dubna sitting; Jan 2006 – JINR Scientific Council recommended ILC participation and Dubna sitting Mar 2006 – Committee of Plenipotentiaries approved the SC recommendation; Mar 2006 – Dubna visit of European GDE director Prof. B.Foster; May 2006 – GDE, DESY – Detailed information from JINR of the Dubna sample site; Aug 2006 – GDE, Vancuver – Documentation from JINR to BCD with RSPI estimation on CFS (Site Assessment Matrix); Nov 2006 – GDE, Valencia – Documentation from JINR to officially submitted, Dubna site was approved as candidate. Dec 2006 – Nuclear Physics Section of RAS - reports of A.Sissakian and G.Shirkov; Apr 2007 – Moscow region Governor supported JINR initiative on ILC hosting and proposed to solve problems of region competence. May 2007 – Letter to the RF President V.V.Putin signed by Yu.Osipov, B.Gromov, A.Sissakian in order to support of JINR initiative. May 2007 – GDE, Hamburg –Agreement to create a joint workgroup DESY-JINR for project of technical solution for near-surface ILC localization. Jun 2007 – Physics Branch of RAS -report of G.Shirkov on ILC activity at JINR. Sept 2007 –Alushta, Crimea - ILC Workshop; GDE - the next European GDE ILC Workshop will be in Dubna, June 2-6, 2008.

Prof. A.Wagner at LINAC-800 In Frascati Prof. B.Foster in Dubna Round table in Valencia

Letter to President of Russian Federation Vladimir Putin Signed by: Moscow region Governor Boris Gromov President of RASYury Osipov Director of JINRAlexey Sissakian Middle May 2007

International Linear Collider: accelerator physics and engineering Theme leaders: A.N. Sissakian G.D. Shirkov Period: Preparation of works of JINR; - Participation in estimations and design of ILC elements Participation of JINR in the ILC International Technical Activity

2006 R&D works in particle accelerator physics and engineering, CF&S works, construction of the free electron laser and research facilities of submillimeter range with the aim to prepare proposals for the project of JINR participation in international collaboration on construction of the International Linear Collider (ILC) and related projects, including XFEL. Personnel – 59 persons SalaryInd. grants TravelsContractsotherEquipment &materials Total 59 x 500$ x 12 months x 1,26 x 0,5 = 230 k$ 70KEK1 – 5 ILC GDE – 15 KEK2 – 5 DESY – 4 INFN – 15 INP – 2 IAP – 1 LEPTA – 5 CLIC – 4 Flash – 3,5 Total 60 RSPI: 13+4=17 Sarov: 3 Total 20 10ILC-5 LINAC-19 CLIC-10 LEPTA-25 Flash-47,5 Total In total year 2006 = 510 k$ (personnel 300 k$ + travels 60 k$ + R&D 150 k$)

Construction of ILC photoinjector prototype. 2. The LINAC-800 based test-bench with electron beam 3. Development of power supply devices for RF system 4. Metrological laser complex 5. Development and design of cryogenic modules and test systems. 6. Preparation of technical base of cryogenic supply to test cryomodules of the 4th gen. 7. Calculation of electrical and magnetic fields 8. Engineering survey and design works 9. Development of the electron cooling method. LEPTA project. 10. Project CLIC 11. Project FLASH 12. Development of diagnostic systems; development of built-in devices. 13. Development of magnetic systems of the ILC damping rings 14. Development of diagnostics for large cryogenic systems. Personnel – 97 persons SalaryInd. grants TravelsContractsEquipment &materials Total 97 x 650$ x 12 months x 1,26 x 0,5 = 480 k$ 10090RSPI: 20 Sarov 10 Total In total year 2007 = 900 k$ (personnel 580 k$ + travels 90 k$ + R&D 230 k$)

LaboratoryPerson in charge at the Laboratory Key excecutors and number of participants Elaboration of photoinjector prototype (DLNP, LPP) Calculation of electron beam dynamics in the injector (DLNP) I.N. Meshkov, G.V. Trubnikov Meshkov + 8, Kobets V.V The LINAC-800 based test-bench; FEL on the base of LINAC-800; photoinjector; Development of the RF system elements Development of diagnostic, Development of inside devices G.D. Shirkov, N.I. Balalykin, A.I. Sidorov E.M. Syresin G.D. Shirkov, N.I. Balalykin + 3, A.I.Sidorov + 2 E.M.Syresin + 4. Metrological laser complex DLNP, LIT Yu.A. Budagov, V.V.Ivanov D.I. Khubua, G.A. Shelkov Yu.A. Budagov, V.V. Ivanov + 1, D.I. Khubua+ 5, G.A.Shelkov + 5. Development of prototype of the 4 th generation cryogenic modules and testing systems for them (LPP, DLNP, VBLHE) Yu.P. Filippov, Yu.A. Usov, Yu.A. Budagov Yu.P. Filippov + 3. Yu.A. Usov + 3, S.V. Mironov Yu.A. Budagov, B. Sabirov Preparation of a production basis at JINR for cryogenic ensuring of testing of the 4 th generation cryogenic modules VBLHE, LPP, DLNP N.N. Agapov, Yu.P. Filippov, Yu.A. Usov, Yu.A.Budagov N.N. Agapov + 3, Yu.A. Usov + 3 Yu.P. Filippov + 3. Yu.A. Budagov, B. Sabirov + 3, S.V. Mironov, A.B.Lazarev + 3. Calculation of electrical and magnetic fields of complex configuration (DLNP) S.B. Vorozhtsov, G.V. Trubnikov V.B. Vorozhtsov + 3, G.V. Trubnikov + 2. Project of the complex for radiation stability studies (VBLHE) L.N. ZaitsevL.N. Zaitsev + 2. Engineering survey and design developments DLNP, EW Yu.N. Denisov, G.V. Trubnikov, V.I. Boiko Yu.N. Denisov + 5. G.V. Trubnikov, V.I. Boiko Development of magnetic systems of the ILC damping rings E.M. Syresin, N.A. Morozov E.M. Syresin + 3, N.A. Morozov + 2.

Photoinjector prototype Several visits and officially organized collaboration with: 1. KEK (Tsukuba, Japan). Visits: June 2006 (I.Meshkov,G.Trubnikov) – signed MoU, October-November (50 days) – Dr. Yu.Korotaev, I.Kryachko for experiments with new KEK RF photogun (participation in design, assembly, tests of injector elements, study of different gun regimes). Collaboration in design and creation of new laser system for KEK “ILC drive beam”. 2. Institute for Applied Physics (Nizhny Novgorod). Collaboration and MoU on design and manufacturing of laser system for KEK and for JINR photoinjector test bench. 3. DESY (Zoethen and Hamburg), visits of G.D. Shirkov and G.V.Trubnikov (Dec. 2006) – coordination of works on X-FEL, FLASH & ILC (May) Yu.V.Korotaev and G.V.Trubnikov – discussion of the scheme of JINR testbench, collaboration on elliptical laser for RF gun, participation in runs on testing of new XFEL RF photogun. 4. Visit of KEK delegation (March 2007), the Protocol of Intentions on the collaboration for creation of the laser system for injector of STF drive beam.

KEK

By initiative of Prof. Yu.Budagov it was required from specialist of VNIIEF (Sarov) to investigate the possibility to produce a tube type bimetal (stainless steel 12Х18Н10Т + titanium VT1-0) by explosion welding in order to use it as a transitional load-bearing element in the construction of ILC and XFEL. The following tasks were solved : developing the pilot technical process for production of bimetal billet of tube type by explosion welding; researching a micro-structure of the welded joint made by explosion welding; leakage testing of the welded joint at indoor and nitric temperatures. SUSTi

4 th generation cryomodules design International collaborative Effort in the three regions Design changes are towards nailing down slot length of components –Costing should be straight-forward from TTF (and possibly XFEL) experience

Collaboration with INFN (Pisa). Scientist from JINR for almost a year actively works in design bureau at INFN (Pisa). The task is to learn software and standards of cryomodule elements design (ANSYS, I-DEAS) Several design documents were created and successfully submitted by INFN and ZENON (Milan) in Plans for the 2007 – to have persons from JINR design bureau at INFN to be involved in. Also two engineers are planned to take part In construction of test cryomodules for XFEL (DESY) At JINR the activity on cryogenic diagnostics is already started and rather well developing and challenging. Support Posts and Brackets

Laser metrology JINR developed test bench at CERN for precise laser metrology. Results ofAug’ micron precision of laser beam position measurement on the base of 40m is achieved. At JINR it is planned to set this complex at b.118 (base is 2x250m). Civil engineering Very fruitful collaboration with GSPI. All official documentations (Site Assessment Matrix, Work Breakdown structure, geological and geodetically characteristics) was made by GSPI in the frame of Contracts with JINR. Work is actively going on. DR magnetic system simulations and magnet prototype construction Dr. E. Syresin, Dr. N. Morozov (with group) in collaboration with SLAC (A. Seryi) works on design and possibility to construct at JINR workshop series of magnetic system elements of DR (few dipole magnets). It is also planned to provide test of those elements. This activity is performed in frames of MoU JINR-KEK on ATF collaboration. Similar MoU between JINR and SLAC is under assignment

First beam obtained. Beam with energy of about MeV – A lot of users (including possible ILC – irradiation of detector parts with beam) are ready (Dr.G.Shelkov & team). Experimental R&D are provided at injector test-bench in LPP. Test bench with e- beam at LINAC-800

DESIGN WORKS ON CIVIL ENGENERING OF ILC CONSTRUCTION IN DUBNA (MOSCOW REGION) PROVIDED BY GSPI July - September 2007 (with assistance of Moscow region government) Basic data acquisition for construction R&D works of ILC project. To provide routing researches with the description of characteristics of the offered line of the accelerator location and the infrastructure connected with it; To specify character of surface structures, real population, topographical features (including depth of the crossed rivers and other reservoirs), an actual accessory and economic use of the wood and ground resources getting in a zone of alienation of the accelerator; To check a real state of a road network in area of construction, an opportunity of its use at a stage of a pre-construction works and during a construction and operation of an accelerating complex; To provide drilling of several control prospecting chinks for acknowledgement of prospective soil structure on the chosen line of the accelerator location.

KEK From Workshop on Electron-Positron Colliders in Alushta, September 2007 to ILC GDE Meeting in Dubna, June 02-06, 2008 ILC GDE Meeting Dubna, June 02-06, 2008