Met One BAM-1020 Operation Key Points

Slides:



Advertisements
Similar presentations
SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
Advertisements

Manual Set-Up for Density by Hydrometer Method ASTM D1298, D287, D6822 and IP160 Feb
Draft STI DWB By Hilary H. Main Paul T. Roberts Sonoma Technology, Inc Redwood Way, Suite C Petaluma, CA Prepared for the U.S.
World Health Organization
1 Comparison of Analog vs. Advance Technology Air Sampling System Designs To Facilitate Correction of Measured or Calculated Volumes to a Set of Reference.
PM-2.5 FEM Requirements for Met One BAM Glenn Gehring, Technology Specialist Tribal Air Monitoring Support (TAMS) Center
Why do we lose analyzer data? Monitor malfunction DAS malfunction Power outages Environmental problems Wildlife damage Vandalism Operator error.
Data QA/QC Techniques. Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.
Adam N. Pasch 1, Ashley R. Russell 1, Leo Tidd 2, Douglas S. Eisinger 1, Daniel M. Alrick 1, Hilary R. Hafner 1, and Song Bai 1 1 Sonoma Technology, Inc.,
Qualification of HVAC systems
Ozone and Ozone Monitoring 2015 National Tribal Forum Glenn Gehring, Technology Specialist III Tribal Air Monitoring Support (TAMS) Center Institute for.
A Seminar on 1.  Why to validate?  Parts of Equipment Validation  Who should do Equipment Validation?  Equipment qualification  Typical process flow.
Introduction to Thermo Electron Instruments Robert Kinsella Sky Patton Thermo Electron.
Presented by: Mike Hamdan South Coast Air Quality Management District Diamond Bar, CA Presented at: The Tribal Air Monitoring Training, Pechanga Reservation,
Clean Air Markets Program Data
What to compare against the validation templates (see templates in course webpage: Resources/Validation%20Templates%20from%20Red.
RESIDENTIAL AIR HANDLERS
Quality assurance of sampling and analytical instruments
NFPA 31 Standard for the installation of Oil- Burning Equipment
Monitoring Station Location and Siting Initially on a residential porch at Marina Towers, aligned with the Mirant Potomac River Generating Station (PRGS)
T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R SineWave - Installation rules.
Introduction to BGI Instruments
From Research Prototype to Production
Mercury Spill Response Instrumentation. Mercury Vapor Analyzers Jerome 431-X MVA (gold film) Lumex 915+ MVA (Atomic Absorption) Jerome J405 MVA.
Continuous Particulate Monitoring Using Light Scatter Photometers.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
 April 7: QA Systems, EPA definitions, PQAOs and common sense – Mike Papp  April 14: Routine Quality Control and Data Management (1-pt QC, flow rate,
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
Quality Control – Part II Tim Hanley EPA Office of Air Quality Planning and Standards.
Emergency Air Monitoring During Wildfires Jim Homolya USEPA Office of Air Quality Planning and Standards Research Triangle Park, NC.
Control Chart Methodology for Evaluating CEMS Data
CARB Continuous PM 2.5 Monitoring Activity (BAM’s) Reggie Smith California Air Resources Board.
Houston Material Handling Society October 2008 Baghouse Cleaning Control Presented by: T.J. Winalski.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
Manual Density Business Today
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
NATIONAL TRIBAL FORUM ON AIR QUALITY 2013 Establishment of a PM 2.5 Monitoring Network on the Colville Reservation.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
Role of AIRNow during Air Emergency Response Prepared by: Timothy S. Dye, Alan C. Chan, and Stephanie A. Bratek AIRNow Data Management Center Sonoma Technology,
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
Jericho Project Air Quality Assessment. TOPICS METHODOLOGY EMISSION SOURCES RESULTS AND ASSESSMENT MITIGATION AND MONITORING CONCLUSION.
BME 353 – BIOMEDICAL MEASUREMENTS AND INSTRUMENTATION MEASUREMENT PRINCIPLES.
PM 2.5 Continuous FEMs; Update and Assessments For NESCAUM Monitoring Meeting April 29, 2011 Tim Hanley – US EPA, OAQPS 1.
Assessing Ambient Air Quality James Payne Morongo Band of Mission Indians.
WHAT IS THE CHEROKEE NATION? Cherokee Nation Air Quality Data Management Concepts for Quality Data Collection Ryan Callison.
Irrigation Efficiency or IE Water applied is never 100% beneficially used. There is always some loss Evaporation from soil and leaf surface Evaporation.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
Kaeser Rotary Screw Vacuum Packages
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Continuous Particulate Matter (PM 2.5 ) Monitoring Tom Dann Luc White, Alain Biron Luc White, Alain Biron Environment Canada, Ottawa Tom Dann Luc White,
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
NYS Department of Environmental Conservation Through The Probe (TTP) NYSDEC Plan for Auditing For NPAP NESCAUM MAC Meeting Troy, New Hampshire April 24.
Gayle K. Martin November 14, 2016
14 Refrigerant Recovery, Recycling, and Recharging.
Control Chart Methodology for Evaluating CEMS Data
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
National Laboratory Association
Module – Groundwater Level Measurement
Region 4 Air Sensor Projects
F&J SPECIALTY PRODUCTS, INC.
August 23, 2000 R.N. Dubois Dow Chemical
Digital Chart Recorder Operation
November technical stop activities:
Cryomodule Assembly Plan
A New Tool for Evaluating Candidate PM FEM and PM2.5 ARM Monitors
Presentation transcript:

Met One BAM-1020 Operation Key Points David L. Vaughn and Hilary R. Hafner Sonoma Technology, Inc. Petaluma, CA Prepared for the U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Research Triangle Park, NC October 2, 2009 STI-905505-3722

Introduction A consensus standard operating procedure (SOP) is available for the new Met One Beta Attenuation Monitor (BAM)-1020 PM2.5, now designated Federal Equivalent Method EQPM-0308-170. SOPs help ensure consistency in operation, validation, and ultimately reporting of high quality data in real-time on AIRNow.gov and state and local web sites and for comparison to the National Ambient Air Quality Standards (NAAQS). These slides summarize key BAM operational issues.

Schematic for Met One BAM-1020 PM2 Schematic for Met One BAM-1020 PM2.5 Federal Equivalent Method EQPM-0308-170 3

Topics Performing an acceptance test Selecting an enclosure Installing the BAM Setting up and configuring Maintaining and quality controlling Validating data and quality assuring

Performing an Acceptance Test Key steps in an acceptance test Load tape and run self-test Perform a leak check Verify flow, temperature, and pressure Perform a bench zero test (before transport to a less stable field environment) The 72-hr zero filter, or background, test is required at the time of field installation. It is important that this test be conducted at the field site to account for site-specific background noise, which is input as the BKGD value in the BAM configuration. From a practical standpoint, the more remotely located the actual field site is, the more thorough the bench testing should be.

Selecting an Enclosure The enclosure needs to meet the following specifications: Temperature range of 0-50°C RH range of 0-90%, non-condensing It is vital to minimize within-hour temperature fluctuations. Fluctuations > a few degrees C within an hour can perturb concentration measurements on the order of several micrograms. Because heating, ventilating, and air conditioning (HVAC) cycling commonly occurs multiple times per hour in small or poorly insulated enclosures, BAM performance can be compromised.

Installing the BAM “Nuts and bolts” precautions Select a location in the shelter with minimum temperature fluctuation. Ensure that the inlet is perpendicular. Provide adequate clearance for access, including the top and rear of the instrument. Properly ground the BAM to ensure stable background: inlet to chassis and chassis to ground. Use an Uninterruptable Power Supply (UPS) to mitigate data loss. However, the UPS should be capable of powering BOTH the BAM and the pump. Powering the BAM during a sample cycle with no air flow can potentially damage the mass flow controller. Replace the pump muffler with a 2-3 ft length of Tygon tubing which will provide noise control and improve pump performance. Equip high altitude sites specifically with the GAST model pump (not MEDO).

Setting Up and Configuring (1 of 5) Power on and warm up Verify that all wiring connections are attached appropriately. Sensors that are not properly connected, or that are connected after the BAM-1020 is powered up, may not be recognized. Allow the unit to warm up for at least one hour which allows the vacuum tube in the beta detector to stabilize. Discard the first two or three hours of data following power-up.

Setting Up and Configuring (2 of 5) Load tape and self test When tape loading is complete, the pinch roller assembly must be unlatched and lowered into place. Tighten the tape spool covers sufficiently; they can loosen during operation and cause a Tape Error and loss of data. Do not over-tighten to avoid damaging the spool threads. Align the filter tape so that it is centered on all the rollers. Rollers on newer units are scored (marked) to visually help center the tape. Always use an empty core tube on the take-up spool and never fasten the tape to the aluminum hub. One roll of tape should last more than 60 days under normal operation. Keep several spare rolls of tape to avoid data interruptions. Some agencies save the used rolls of tape for post-sampling analysis.

Setting Up and Configuring (3 of 5) Verify pneumatic system performance Perform leak check Verify flow rate First, verify temperature Second, verify pressure Third, verify flow A single point flow verification is sufficient at setup. If pump capacity or flow controller operation is in question, a multi-point flow verification may be used.

Setting Up and Configuring (4 of 5) Settings required to meet FEM EQPM-0308-170 Sample time of 42 minutes Count time of 8 minutes CONC TYPE: ACTUAL FLOW TYPE: ACTUAL FLOW RATE: 16.7 lpm HEATER: AUTO, RH setpoint 35%, Delta-T control “off” Other recommended settings Offset of -15 μg/m3 Lower limit clamp of -15 μg/m3

Setting Up and Configuring (5 of 5) Mandatory 72-hr background zero test Allow to run for a day to equilibrate before the test. Use only digital data to calculate background. Minimize temperature fluctuations during test. Remove the first 4 hours of data from the zero test results (i.e., need to run 76 hours). The maximum allowable value is 20 mg/m3. No values below -14 mg/m3 (due to FEM BAM default lower limit clamp of -15 mg/m3). If the BAM reports errors, rerun the test.

Maintaining and Quality Controlling (1 of 2) Verify flow rate monthly (±4%) Flow rates outside ±4% of the 16.7 lpm design flow require calibration. Perform leak check monthly (< 1.0 lpm) Leak check tolerances vary by agency; ideal is < 0.4 lpm. Check error log monthly For FEM, follow FRM cleaning protocols Clean nozzle and vane monthly Clean PM10 inlet monthly Clean VSCC monthly

Maintaining and Quality Controlling (2 of 2) Replace filter tape every 2 months Run self-test every 2 months or when any significant maintenance is performed Conduct volumetric flow calibration every 2 months Calibrate the temperature and pressure sensors first. It is important that the reference temperature instrument be thoroughly equilibrated to ambient conditions; this may take up to an hour if the sensor is in the body of the device. Verify critical BAM settings every 2 months These settings include calibration constants, sample time, count time, flow settings, heater settings, and clock Test filter temperature and RH every 6 months Test Smart Heater every 6 months

Validating Data and QA Verify that externally acquired (data logger) data agree with directly downloaded digital data from the BAM Analog data should be within ±1.0 μg/m3 of BAM internal data Digitally logged data should agree exactly with BAM internal data Time stamping errors can occur with digital and analog data acquisition Analog data logger must be programmed to account for BAM offset Identify 900 range values (assuming 15 μg/m3 BAM offset) Value of 985 μg/m3 indicates full-scale output on error Value of 905 μg/m3 indicates invalid data in Early Mode operation Verify that sample volume (Qtot: 0.700 m3) is rock solid Download and evaluate error log Download the configuration file and check for any configuration file changes

A Consensus SOP is available from Tim Hanley (hanley.tim@epa.gov). * Vaughn D.L. (2009) Standard operating procedure for the continuous measurement of particulate matter: Met One BAM-1020 PM2.5 Federal Equivalent Method EQPM-0308-170. Prepared for the U.S. Environmental Agency, Research Triangle Park, NC, by Sonoma Technology, Inc., Petaluma, CA, STI-905505.5-3645-SOP, September. Acknowledgments These slides were created by Sonoma Technology, Inc., through EPA AIRNow Operations and AQI Support contract # EP-D-05-004, Work Assignment 5-05: Standard Operating Procedures (SOPs) for the Measurement of Continuous Particulate Matter.* We appreciate the contributions of the following people to the SOP: Mac McDougall, California Air Resources Board; Mike Meyer and Dennis Hart, Met One Instruments; Peter Babich, Connecticut Department of Environmental Protection; Michael Flagg, U.S. EPA, Region 9; Tim Hanley, U.S. EPA, Office of Air Quality Planning and Standards; Matt Harper, Puget Sound Clean Air Agency; Kevin Hart and Neal Olson, Utah Department of Environmental Quality, Division of Air Quality; Melinda Ronca-Battista, Northern Arizona University, College of Engineering and Natural Sciences, Institute for Tribal Environmental Professionals; Kurt Anderson, Minnesota Pollution Control Agency; and Ryan Auvil, Maryland Department of the Environment.