1 SITES INPUT using the Integrated Development Environment __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE.

Slides:



Advertisements
Similar presentations
Hydrologic Modeling with HEC-HMS
Advertisements

Bentley Systems, Incorporated
Flood Profile Modeling with Split Flows and Weirs
Hydrologic Analysis Dr. Bedient CEVE 101 Fall 2013.
Soil Mapping and Erosion
PROGRESSION OF EROSION TECHNOLOGY FOR SITES and WINDAM B EROSION TESTING WORKSHOP Maricopa County, AZ October 19 & 20th.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Bank-Stability and Toe-Erosion Model Andrew Simon, Robert Thomas, Andrea Curini and Natasha Bankhead USDA-ARS National Sedimentation Laboratory, Oxford,
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
1 Spillway Ratings and Stability Design Procedures __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS.
Runoff Estimation, and Surface Erosion and Control Ali Fares, PhD NREM 600, Evaluation of Natural Resources Management.
CE 515 Railroad Engineering
Design of Hydraulic Controls & Structures
SPECIALTY WORKSHOP: SITES TRAINING AND INTRODUCTION TO WINDAM ASDSO Dam Safety 2008 PART 2 – SITES EARTH SPILLWAY EVALUATION EVALUATION B. Earth Spillway.
Lecture ERS 482/682 (Fall 2002) Rainfall-runoff modeling ERS 482/682 Small Watershed Hydrology.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Erosion is the process by which the land surface is worn away by the action of wind, water, ice, or gravity - it is the process where soil particles are.
HEC-RAS.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Welcome to WinPond Training. History of WinPond –Missouri’s Pond Design program selected as model for WinPond by Engineering Business Area Advisory.
John Miller.  Purpose of Erosion/ Sediment Control Codes ◦ Promote Safety ◦ Preserve Property values ◦ Lessen burden on taxpayers for flood control ◦
SWAT – Land Phase of the Hydrologic Cycle Kristina Schneider Kristi Shaw.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
Basic Hydrology & Hydraulics: DES 601
WinTR-20 Advanced Features June WinTR-20 Project Formulation Hydrology Computer Program Advanced Features Presented by: WinTR-20 Development Team.
Source: %20T.%20Papanicolaou.pdf.
SITES WORKSHOP-Phoenix, AZ
HEC-HMS Runoff Computation.
WinTR-20 Advanced Features March WinTR-20 Project Formulation Hydrology Computer Program Advanced Features Presented by: WinTR-20 Development Team.
SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS 5 Point.
SPILLWAY RATINGS and STABILITY DESIGN PROCEDURES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS.
WinTR-20 Data Converter May WinTR-20 Project Formulation Hydrology Converting Old TR-20 Input Files to New WinTR-20 Format Presented by: WinTR-20.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
SITES SOFTWARE APPLICATION SEMINAR __________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS SITES.
Bank-Stability and Toe-Erosion Model Andrew Simon, Robert Thomas, Andrea Curini and Natasha Bankhead USDA-ARS National Sedimentation Laboratory, Oxford,
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
PART 1 - INTRODUCTION TO SITES B. History and Focus of the SITES Software and its Application SPECIALTY WORKSHOP: SITES TRAINING AND INTRODUCTION TO WINDAM.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2.
PART 3 – USING SITES SOFTWARE C. Overview of SITES output a. Key text outputs b. Key graphical outputs SPECIALTY WORKSHOP: SITES TRAINING AND INTRODUCTION.
Finding the S vs. Q relationship By: Cody Hudson.
WinTR-20 PS, SD, FB HydrographsJune WinTR-20 Principal Spillway, Stability Design, and Freeboard Hydrographs Presented by: WinTR-20 Development Team.
1 VIRGINIAWORKSHOP Feb. 28 – Mar. 3, 2006 INTRODUCTION to SITES for WATER RESOURCE SITE ANALYSIS.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Modeling Inline Structures using HEC-RAS Version 3.1
Welcome to WinPond Workshop Demo #1. 03/08/07 CNTSC-WinPond Workshop DEMO12 Demonstration Problem #1.
Elementary HEC-HMS Model
EROSION TECHNOLOGY for SITES Earth Spillway Integrity Analysis Phase 2: Inputs and Equations EROSION TECHNOLOGY for SITES Earth Spillway Integrity Analysis.
Basic Hydraulics: Culverts – I
Basic Hydraulics: Channels Analysis and design – I
1 RUSLE2 Users Guide South Dakota September 2004.
Section 3: Stream Deposition
1 INTRODUCTION TO “Stratigrafia” The code in the workbook “stratigrafia” computes - longitudinal profiles; - water surface elevation; - sediment transport.
SITES SOFTWARE APPLICATION SEMINAR INTRODUCTION to SITES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 25 July 2012 Lesson 14.
PART 2 – SITES EARTH SPILLWAY EVALUATION B. Earth Spillway Integrity Analysis i. Three phase model of spillway performance ii. Phase 1 and phase 2 inputs.
Glenn E. Moglen Department of Civil & Environmental Engineering Virginia Tech Introduction to NRCS/SCS Methods (continued) CEE 5734 – Urban Hydrology and.
Sanitary Engineering Lecture 4
HYDROLOGY Lecture 10 Unit Hydrograph
WinTR-55 Small Watershed Hydrology
EFH-2 Engineering Handbook Chapter 2
Map-Based Hydrology and Hydraulics
11/20/2018 Culverts Culverts are the same as bridges as far as locating cross sections 11/20/2018.
SWAT – Land Phase of the Hydrologic Cycle
Floods and Flood Routing
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Longitudinal Profile Survey for Successful Culvert Replacement
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Quick Start Guide SITES SOFTWARE APPLICATION SEMINAR
Presentation transcript:

1 SITES INPUT using the Integrated Development Environment __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS

2 OBJECTIVE Understand SITES inputs Navigate Integrated Development Environment (IDE)

3 Starting Out 1.Start a new project 2.Create initial data file 3.Modify original data file for other runs

4 New Project Browse parent directory Type name of the new project (folder)

5 Home Screen File Menu Proceed – select ContinueProceed – select Continue

6 Global Watershed Data Determines data to enter and analyses to perform

7 Watershed Schematic Hydrologic Model Structures Subwatersheds Channel reaches Junctions Click icon menu to add element to schematic Single Structure Uncontrolled Drainage Area Dbl-click to edit element

8 Watershed Info

9 Hydrologic Data Options RainfallHydrographs Compute Areal Correction (SITES) Enter Areally Corrected Rainfall

10 Structure Data Table Normal Entries (SA or Vol) Normal Entries Special 20 entries max20 entries max

11 Structure Data Table Enter PS rating  Special riser/conduit not defined by SITES  First row must be crest of PS Enter AS rating  Preferred to let SITES create the AS rating  Crest of AS spwy is line preceding 1 st AS discharge entry

12 Watershed Data

13 Rainfall – Princ Spwy If 10-d rainfall > 6” then 100-yr 10-d box disappearsIf 10-d rainfall > 6” then 100-yr 10-d box disappears

14 PS Rainfall & Runoff Rainfall/Runoff Screen ONLY applies to PSH  No PSH run, screen doesn’t appear RUNOFF option used where snowmelt flooding should be checked  North-central and Northeastern US  AZ not included  See TR-60 Figure 2-1

15 Rainfall – Aux Spwy % PMP

16 Standard Distributions NRCS 6 hr NRCS 24 hr Type I NRCS 24 hr Type Ia NRCS 24 hr Type II NRCS 24 hr Type III Can enter non-standard distribution

17 Distribution Table Dimensionless or rainfall depth Values increasing

18 Pool Data Screen

19 Pool Data Flood Pool Sediment  Optional entry  Value > crest of PS  Generally FP sediment = PS crest Permanent Pool  Optional entry  Sets wave berm elevation

20 PS Type Common

21 PS Inlet K e -energy loss inlet entrance to just inside the conduit See NRCS Design Note 8

22 PS Conduit Constant CL pipe outlet

23 Valley Elevations AS can erode down to “Elev of Valley Floor” Dam Height for classification Profile for embankment quantity computation (optional)

24 Profile Valley XSC Stripping depth 99 profile station/elev entries

25 Embankment Data

26 AS Crest Options

27 AS Crest Data PSH checked on Global WS Data  SITES sets crest of AS PSH unchecked on Global WS Data screen  User specifies AS crest elevation

28 Tie Station Tie station is downstream end of level crest of auxiliary spillway Ties auxiliary spillway crest information with geologic materials

29 AS Inlet Template Distance & Depth - from Tie Station

30 Vegetal Flow Resistance 1.Vegetal retardance curve index – Ag Handbook Vegetal retardance class (A–E) SCS TP-61 3.Manning’s n TP-61ABCDE AH

31 Fixed Point – AS Inlet Physical feature controls inlet channel configurationPhysical feature controls inlet channel configuration Example: hard rock outcropExample: hard rock outcrop SITES forces inlet channel slope through fixed pointSITES forces inlet channel slope through fixed point Fixed point must be upstream & below the crestFixed point must be upstream & below the crest

32 AS Exit Template

33 Channel Fill to Valley Floor Fill Constructed exit channel extended at constant slope to valley floor General fill properties entered later Valley Floor Elev

34 Vegetal Cover Factor & Maintenance Code Used to compute effective stress on erodible boundary for uniform vegetal conditionsUsed to compute effective stress on erodible boundary for uniform vegetal conditions Discontinuities in cover minimize effect of cover factor (MC 2 or 3)Discontinuities in cover minimize effect of cover factor (MC 2 or 3)  Erosion occurs in areas without cover See Ag Handbook 667See Ag Handbook 667

35 Potential Rooting Depth & Topsoil Diameter Rooting Depth > 1’ – protected Rooting Depth < 1’ – strips away Topsoil representative diameter only for stability analysis  Constructed exit channel only (no fill in natural ground)  Coarse-grained materials only (d 75 >0.05 inches)

36 AS Cross-section Trapezoidal 3 Methods Peak SDH

37 AS Materials

38 AS Materials Notes Integrity evaluation of auxiliary spillway  Describe materials exposed to erosive attack  Geologic profile through spillway  Spillway centerline profile??  Erosion occurs at weakest materials  Input weakest geologic profile in spillway Material Description only for labeling  Be descriptive  “CL1, CH2, Limestone” are better than 1, 2

39 PI - Dry Density - % Clay PI for time of phase 1 (surface- vegetation) failure PI most important for materials initially exposed at spillway surface Dry density and percent clay determe the erosion rate coefficient of downcutting for concentrated flow and headcuts in cohesive materials Use either % clay or detach rate (jet erosion test)

40 Rep Diameter & K h Size of material detached as single unit  Fine grained materials & sediments - d 75  Large materials -  Governs computed threshold where surface shear detaches material in concentrated flow or headcut downcutting Headcut erodibility index (K h ) governs threshold and rate for headcut advance

41 AS Geology Plot

42 AS Topsoil

43 Output Options

44 SDH FBH Only

45

46 AS Surface Profile

47 AS Surface Conditions

48 After the desired input data set is developed, the data is normally stored under a new file name. Save As...

49 Input Tips Create project directory for each dam Select projects from MRU list Descriptive file names help Use comments to document the alternative Let SITES be the file manager Send input file (*.d2c) to reviewer

50 Typical Opening Sequence Open Project Directory (select from list) Open File (select file, NOT folder)  SITES build creates a folder with same name as input file Continue – Next Screen  Schematic Dbl-click design structure  User spends most time editing design structure

51 Jump to Screen Right-click in empty area Select specific screen

52 Typical Post-edit Sequence Schematic Home Screen Save As... (enter filename) Build File  SITES builds folder and places all output files into the folder

53 Pictures of the year by NBC End Don’t forget to send input file (*.d2c) to reviewer!