KPIs report Requirements for KPIs – lagging vs leading

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Survey Quality Control.
Advertisements

Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
BRYAN YOUNG Preventative Maintenance Working With Safety.
KPI Familiarisation.
PRACTICE ENGINE Best Practices with Data Capture.
Capital Project Cost Reporting. Project Goals Documentation of project approval Approval path based on reporting structure and individual approval limits.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
ITIL: Service Transition
Computerized Maintenance Management System | May 15, |1 | Computerized Maintenance Management System Presented By [Presenter Name] [Presenter Title]
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D 2012 Annual PERT Workshop Best Practice.
Chapter 10 Managing the Delivery of Information Services.
ORACLE ENTERPRISE ASSET MANAGEMENT
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
Managing a computerised PO Operating environment 1.
Computerised Maintenance Management Systems
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Enterprise Asset Management
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
WebTMA Accounting Module Basics Luis Pino TMA Systems.
Maximizing the Training Management Module Doug Cussimanio, Quiktrip Corporation Darren Brown, TMA Systems.
Information Systems Security Operational Control for Information Security.
Presentation on Preventive Maintenance
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Life cycle services for automation products
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
CPAA – Data entry - Time management. Grade Employee This WSR indicates the hours of work per week as well as the hours of work per day for this work schedule.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section A 1.
Chris Reichart Appointed Process Assignment November 6, 2015.
Atlanta Area OAUG Meeting January 18, 2008 Using Oracle eAM to Support Asset Reliability.
Computerised Maintenance Management Systems
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
1 Equipment Maintenance Service Maintenance Form.
Midwest alio ® Conference November 13-14, 2013 Fixed Assets Michael Williams.
Blueprint Training Presentation: Time Entry & Equipment October 31, 2006.
A PROCESS PERFORMANCE MEASUREMENT FRAMEWORK FOR PT. TERMINAL PETIKEMAS SURABAYA INSIGHT IN THE PROCESSES OF THE CONTAINER FREIGHT STATION Guus Aarts
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
MANAGING EMPLOYER REGISTRATIONS AND SERVICES IN OSMIS ONE-STOP MANAGEMENT INFORMATION SYSTEM (OSMIS)
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Workshop: Work Completion Process May 16, Project Goals  Implement SAP Plant Maintenance system Provide integration with Finance, HR, and Materials.

Computerized Maintenance Management Presented by Mohamed H. F. Ibrahim Wang, Peixian Mardjani.
Slide 1. © 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks.
ITIL: Service Transition
Excellence Leader (CEO/Owner/General Manager) Role Description…
Vincent Yee, P.E. | Corey Welsh, User Conference | October 20, 2016
LubeWatch® Oil Analysis Program
MAINTENANCE ENGINEERING
Implementation of Computer Maintenance Management system - CMMS
Managing the Delivery of Information Services
Reliability J&J - São José dos Campos
Manage costs and schedules for system replacement due to obsolescence
Entering Informal Enforcement Actions
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
INfOR Work Request and Work Order Quick Entry Process 12/01/16
RECORDS AND INFORMATION
Infor EAM in the Handling Engineering Group at CERN
Final Design Authorization
Operations Management
Work Order System Infor 10 (EAM) Yanfeng
Asset condition and priority in Maximo
Protect Your Assets – Equipment and Tool Tracking
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Annata 365 Fleet management with Annata 365 June
Presentation transcript:

KPIs report Requirements for KPIs – lagging vs leading Minimum data entries into CMMS for future reference, data analysis and KPI reporting Additional requirements for data entries KPIs for equipment KPIs along asset hierarchy Recommendations

Requirements for KPIs Two main considerations: 1) Reliability, availability and maintainability (RAM) 2) Lifecycle cost (LLC) where possible The aim is to sustain required RAM at optimum LCC (not the least) –approx at 2-3% per year of capital replacement value (CRV) KPIs to include both leading/proactive and lagging/reactive indicators To track KPIs against equipment and the asset hierarchy Minimum mandatory data entries in CMMS for data analysis & KPIs reporting KPIs to be attached in the monthly report

Minimum mandatory data entries To capture sufficient data for reference, data analysis, & KPIs reporting purposes: 1)  plan and actual labour - WO cannot be scheduled if planned manhour not specified and cannot be closed if actual manhour not entered 2) plan and actual spares - WO cannot be closed if the spares reserved not yet posted to WO and direct charge materials not yet have PO, provided users decide to delete reservations for spares or PR for direct charge materials after prompted with a user exit warning when wanting to close the WO 3) plan and actual services - same as point 2 above 4) downtime start/finish dates and times - must be entered before can close WO after a field "downtime" has been ticked when creating a work request. 5) failure codes based on ISO14224 (OREDA) - must be entered before can close WO  

Additional requirements for data entries All works must have work order with operations assigned properly with labour, materials & services All works on existing platform must be captured in Maximo for analysis including projects, maintenance, inspection & shutdown, regardless of discipline or department All asset must be given a tag number and eqpt no and registered in Maximo under the right system and hierarchy

KPIs for equipment No. KPIs Eqpt Class Sub-class Manufacturer Model No 1 Reliability KPIs 2 Cost KPIs 3 Work KPIs 4 Equipment KPIs 5 Material KPIs Retained first because included in Maintenance Reporting Monitoring and Improvement.doc 6 HSE KPIs removed 7 Quality KPIs 8 Staffing KPIs 9 Training KPIs

KPIs along asset hierarchy No KPIs Tag no Maint Grp System Platform Company 1 Reliability KPIs 2 Cost KPIs 3 Work KPIs 4 Equipment KPIs 5 Material KPIs 6 HSE KPIs removed 7 Quality KPIs 8 Staffing KPIs 9 Training KPIs

Recommendations To implement minimum mandatory data entries To include project works for existing platforms in CMMS To obtain KPIs from CMMS where available Discipline engineers to externally tracked other leading indicators if not obtainable from CMMS To hold refresher KPI training or workshop for management and CMMS users To include KPIs in monthly report To manage works and evaluate staff performance by KPIs