CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25,

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Advertisements

Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
1 STATUS OF ILC ACTIVITY AT JINR G. Shirkov Session of RAS, Protvino, December 22, 2008.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
JINR Dubna site proposal for ILC G.Trubnikov Joint Institute for Nuclear Research Sendai, March 2008.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
European design study on Neutrinofacilities - Euronu within FP7.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
1 STATUS OF ILC ACTIVITIES AT JINR J.Budagov, A.Dudarev, M.Lyablin, G.Shirkov, G.Trubnikov, A.Sissakian JINR, Dubna, Russia Presented by A.Dudarev.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
1 Status of the ILC activity at JINR PAC for Particle Physics 29 January 2009 G.V. Trubnikov.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
AMERICAN LINEAR COLIDER PHYSICS GROUP Impressions of the Dubna Site
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Presentation transcript:

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25, 2010 WP 5 ILC Siting in Europe Work Package Report Part II Wilhelm Bialowons · DESY & GDE and John Andrew Osborne · CERN & GDE

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 2 RDR Executive Summary A second European sample site near DESY, Hamburg, Germany, has also been developed. This site is signicantly different from the three reported sites, both in geology and depth (25 m deep), and requires further study. In addition, the Joint Institute for Nuclear Research has submitted a proposal to site the ILC in the neighbourhood of Dubna, Russian Federation.

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 3 List of Beneficiaries Beneficiary number Beneficiary nameBeneficiary short nameCountry 1 (Coordinator) Stiftung Deutsches Elektronen-Synchrotron DESYGermany 2Commissariat à l’Energie Atomique CEAFrance 3European Organization for Nuclear Research CERNSwitzerland 4Centre National de la Recherche Scientifique CNRSFrance 5Istituto Nazionale di Fisica Nucleare INFNItaly 6The Chancellor, Masters and Scholars of the University of Oxford UOXF.DLUK

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 4 The Temporal Development for the WPs

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 55 GDE Project Structure for TDP Associate Project Manager Head of European CFS

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 6 Outline Introduction Mission or justification for Work package 5 The last ILC-HiGrade Meeting was March 6, last year at LAL.What happened in the meantime? (Bi-)Weekly GDE CFS WebEx-Meetings on Tuesday 14:00 to 15:00 Monthly GDE CFS and Global Systems WebEx- Meetings on Wednesday 15:00 to 16:00 Monthly CLIC-ILC Cost and Schedule WebEx Mtngs TILC09 GDE Meeting on ILC and AAP Review April 17 to 21, 2009 in Tsukuba, Japan

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 7 Outline Joint GDE, ILC-HiGrade and JINR Conventional Facilities and Siting Meeting, June 25 and 26, 2009 at DESY in Hamburg (ILCAgenda 3646) 2009 Linear Collider Workshop of the Americas, September 29 to October 3, 2009 in Albuquerque, New Mexico AAP Review Meeting January 6 to 8, 2010 at Oxford University Preparation of ILC Workshop 2010, March 26 to 30, in Beijing (Tunnel) Safety

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 8 (Bi-)Weekly GDE CFS WebEx-Meetings

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 9 Monthly GDE CFS and GS WebEx-Meetings

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 10 CLIC-ILC Cost and Schedule WebEx Meetings

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 11 TILC09 GDE Meeting on ILC and AAP Review

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort Linear Collider Workshop of the Americas

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 13 AAP Review Meeting at Oxford University

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 14 Preparation of ILC Workshop 2010 in Beijing

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 15 (Tunnel) Safety

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 16 Joint GDE, ILC-HiGrade and JINR CFS Meeting

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 17 Summary of PM Introduction Shallow site studies are very important for the ILC – GDE Conventional Facilities Technical Design Phase –Cost –Comparison and evaluation will lead to cost savings and design improvements JINR – GSPI is the most extensive shallow site study undertaken in support of the ILC – GDE Reference Design –No other specific shallow site study is presently planned

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 18 The Joint Institute of Nuclear Research (JINR) in Dubna has proposed a site near their institute, south of the Volga river. That proposal comprises a machine close to the surface but constructed using tunnel-boring machines. Sufficient power from the Russian national grid is available. The project will assess the potential of such a site and conclude on the benefits and risks. Siting Studies in Europe Potential ILC Site at Dubna in Russia

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 19 General Layout of the Site Near Dubna

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 20 Geological Investigations of GSPI Miakishevo Hrabrovo GSPI has performed geophysical investigations in 35 points (in red) including three drillings of chinks of 47 m, 43 m and 36 m depth. The probes of soils had been analyzed. The power of loan are 27.5 m (2.0 m – 29.5 m) and 37.4 m (8.1 m – 45.5 m) correspondently. Geophysical investigations with a series of seismic and electrical investigations have been performed as well.

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 21 Bird Eyes View of Bore Hole Positions Drilling 1 Drilling 2 Drilling 3

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 22 Geological Cut of the Dubna Sample Site peatsandloamclaylimestonewateringtunnel

Geological Cut of the Dubna Sample Site

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 24 Profile of Bore Hole 3-08

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 25 Conclusion of Grigori Shirkov · JINR 1.Route of the International Linear Collider passes in sparsely populated area near existent scientific center JINR 2.Climatic conditions are comfortable. 3.Relief of the area is flat with soft outlines and small excess. The most part of the track is forest, the smaller part is meadows and tillage, partly is swamp land. 4.The route passes through the stable, steady structural element of the earth’s crust – Russian plate. This territory is related to the 5-point zone under the MSK-64 scale. 5.Geological structure, hydro geological conditions, geotechnical properties of soil are suitable for the ILC construction. 6.The ILC is placed at a shallow depth (13-24m) in layer of firm dense drift clay, partly in layer of water-field sand. Under the further researches of the region it is possible to place the route in drift clay entirely. 7.In general, the assumed route is favorable for the ILC construction. There is a positive experience of automated tunneling in similar soils in the Russian Federation.

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 26 Plans for the Future at JINR 1.Detailed geological investigations on the ILC route. 2.Looking for the best Interaction Point as a center and starting point of ILC, Detectors and Convention Facilities location. 3.Cost Estimation for different solutions of Dubna siting (one tunnel and surface gallery, full cut and cover, combinations of solutions). 4.Conditions and funding of GSPI work and participation in the GDE/CFS activity

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 27 Outline of the Dubna Site Investigation Report 1.Executive Summary/Overview 2.GSPI Soil Boring Report 3.Description of Current Dubna Site Design 1.Current Status of Preliminary Design 2.Verification of GSPI Soil Boring Report 3.Status of Cost Estimating Effort 4.Near Term Topics for Further 1.Identification of Optimal Location for Dubna Sample Site 2.Additional Field Investigation for Site Definition 3.Investigation of Alternative Tunnel Configurations for Shallow Siting 4.Analysis of Life Safety and Egress Strategies of Altern. Tunnel Configs 5.Cost Estimates for Alternative Tunnel Configurations 5.Longer Term Planning Opportunities and Schedule 6.Summary 7.References 1.Soil Boring Report (Original) 2.Soil Boring Report (English Version)

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 28 Summary An important part of the Technical Design Report in 2012 is a new cost estimate with (hopefully) reduced cost A key item for cost reduction are the Conventional Facilities and the Siting Shallow sites and single tunnel designs are promising significant cost reduction Europe can (and should) bid to host and has the choice between several sites and deep and shallow tunnels

CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 29 BackUp Slides