Risk and Refinements in Capital Budgeting

Slides:



Advertisements
Similar presentations
Capital Budgeting Techniques: Certainty and Risk
Advertisements

Capital Budgeting.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques.
MANAGERIAL ACCOUNTING
Chapter 10 Capital-Budgeting Techniques and Practice.
Learning Goals Calculate, interpret and evaluate the payback period.
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
© 2003 McGraw-Hill Ryerson Limited 12 Chapter The Capital Budgeting Decision McGraw-Hill Ryerson©2003 McGraw-Hill Ryerson Limited Prepared by P Chua April.
Chapter 9 Capital Budgeting Techniques. Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 9-2 Learning Goals 1.Understand the role of capital.
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Where Do We Stand? Earlier chapters on capital budgeting focused on the appropriate size and timing of cash flows. This chapter discusses the appropriate.
Principles of Managerial Finance 9th Edition Chapter 10 Risk & Refinements in Capital Budgeting.
Ch 9 Learning Goals 3. The importance of risk in capital budgeting.
4. Project Investment Decision-Making
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
CHAPTER 21 Capital Budgeting and Cost Analysis To accompany Cost Accounting 12e, by Horngren/Datar/Foster. Copyright © 2006 by Pearson Education.
Copyright (C) 2000 by Harcourt, Inc. All rights reserved.
Chapter 9 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Capital Budgeting Decision Tools 05/17/06. Introduction Capital Budgeting is the process of identifying, evaluating, and implementing a firm’s longer.
Financial and Managerial Accounting
Chapter 18 Multinational Capital Budgeting 1. Extension of the domestic capital budgeting analysis to evaluate a Greenfield foreign project Distinctions.
© 2012 Pearson Prentice Hall. All rights reserved Internal Rate of Return (IRR) The Internal Rate of Return (IRR) is a sophisticated capital budgeting.
Risk and Return Chapter 8. Risk and Return Fundamentals 5-2 If everyone knew ahead of time how much a stock would sell for some time in the future, investing.
4 C H A P T E R Capital Investment Decisions.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques: Certainty & Risk.
Copyright © 2003 Pearson Education, Inc. Slide 5-1 Chapter 5 Risk and Return.
Learning Goals LG1 Understand the importance of recognizing risk in the analysis of capital budgeting projects. LG2 Discuss risk and cash inflows, scenario.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
WSU EMBA Corporate Finance12-1 Chapter 12: Risk, Cost of Capital, and Capital Budgeting Weighted Average Cost of Capital (WACC) Estimating cost of capital.
Multinational Capital Budgeting 14 Chapter South-Western/Thomson Learning © 2003.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 10 Risk and Refinements in Capital Budgeting.
Chapter 12 Capital Budgeting and Risk
FINC3240 International Finance
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Capital Budgeting Techniques: Certainty & Risk
Long-Term (Capital Investment) Decisions
1 Relevant Cash Flows and Other Topics in Capital Budgeting Timothy R. Mayes, Ph.D. FIN 3300: Chapter 10.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 10-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital.
CORNERSTONES of Managerial Accounting 5e. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Multinational Capital Budgeting 7 7 Chapter. Chapter Objectives To compare the capital budgeting analysis of an MNC’s subsidiary with that of its parent;
Chapter 3 Arbitrage and Financial Decision Making
Chapter 10 Capital Markets and the Pricing of Risk.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Risk and Capital Budgeting 13.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
Chapter 18 Multinational Capital Budgeting. Copyright © 2004 Pearson Addison-Wesley. All rights reserved Multinational Capital Budgeting Although.
Finance Chapter 11 Cash flow estimation & risk analysis.
Chapter 12 Risk and Refinements on CB © 2012 Pearson Prentice Hall. All rights reserved
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 9 Capital Budgeting Techniques.
Capital Budgeting Decision Methods 1. Learning Objectives The capital budgeting process. Calculation of payback, NPV, IRR, and MIRR for proposed projects.
FIA Technical Workshop March 2015 Prepared by Yih Pin Tang.
Chapter 11 Capital Budgeting Techniques: Certainty and Risk Lawrence J. Gitman Jeff Madura Introduction to Finance.
Cash Flows and Other Topics in Capital Budgeting
1 CHAPTER 5 Capital Budgeting Techniques. 2 Introduction to capital budgeting Payback period Discounted payback period Net Present value (NPV) Profitability.
Chapter 8 Fundamentals of Capital Budgeting. Copyright ©2014 Pearson Education, Inc. All rights reserved Forecasting Earnings Capital Budget –Lists.
Part Three: Information for decision-making Chapter Fourteen: Capital investment decisions: the impact of capital rationing, taxation, inflation and risk.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks PRENTICE HALL ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Other Long-Run Decisions
Overview of Capital Budgeting
CAPITAL BUDGETING The term capital budgeting consists of two words, capital and budgeting. Capital means funds currently available with the company and.
Capital Budgeting and its Techniques
Capital Budgeting and its Techniques
Capital Budgeting in Foreign Subsidiaries
Capital Budgeting and its Techniques
Chapter 24: Capital Investment Decisions
Presentation transcript:

Risk and Refinements in Capital Budgeting Chapter 10 Risk and Refinements in Capital Budgeting

Learning Goals Understand the importance of recognizing risk in the analysis of capital budgeting projects. Discuss breakeven cash flow, sensitivity and scenario analysis, and simulation as behavioral approaches for dealing with risk. Discuss the unique risks that multinational companies face. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Learning Goals (cont.) Describe the determination and use of risk-adjusted discount rates (RADRs), portfolio effects, and the practical aspects of RADRs. Select the best of a group of mutually exclusive projects using annualized net present values (ANPVs). Explain the role of real options and the objective and procedures for selecting projects under capital rationing. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Introduction to Risk in Capital Budgeting Thus far in our exploration of capital budgeting, all projects were assumed to be equally risky. The acceptance of any project would not alter the firm’s overall risk. In actuality, these situations are rare—project cash flows typically have different levels of risk and the acceptance of a project does affect the firm’s overall risk. This chapter will focus on how to handle risk. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Introduction to Risk in Capital Budgeting (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk In the context of the capital budgeting projects discussed in this chapter, risk results almost entirely from the uncertainty about future cash inflows, because the initial cash outflow is generally known. These risks result from a variety of factors including uncertainty about future revenues, expenditures and taxes. Therefore, to asses the risk of a potential project, the analyst needs to evaluate the riskiness of the cash inflows. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Risk and Cash Inflows Treadwell Tire, a tire retailer with a 10% cost of capital, is considering investing in either of two mutually exclusive projects, A and B. Each requires a $10,000 initial investment, and both are expected to provide equal annual cash inflows over their 15-year lives. For either project to be acceptable, NPV must be greater than zero. We can solve for CF using the following: Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Risk and Cash Inflows (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Risk and Cash Inflows (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Sensitivity Analysis The risk of Treadwell Tire Company’s investments can be evaluated using sensitivity analysis as shown in Table 10.2 on the following slide. For this example, assume that the financial manager made pessimistic, most likely, and optimistic estimates of the cash inflows for each project. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Sensitivity Analysis (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Scenario Analysis Scenario analysis is a behavioral approach similar to sensitivity analysis but is broader in scope. This method evaluates the impact on the firm’s return of simultaneous changes in a number of variables, such as cash inflows, outflows, and the cost of capital. NPV is then calculated under each different set of variable assumptions. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk: Simulation Simulation is a statistically-based behavioral approach that applies predetermined probability distributions and random numbers to estimate risky outcomes. Figure 10.1 presents a flowchart of the simulation of the NPV of a project. The use of computers has made the use of simulation economically feasible, and the resulting output provides an excellent basis for decision-making. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Behavioral Approaches for Dealing with Risk Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

International Risk Considerations Exchange rate risk is the risk that an unexpected change in the exchange rate will reduce NPV of a project’s cash flows. In the short term, much of this risk can be hedged by using financial instruments such as foreign currency futures and options. Long-term exchange rate risk can best be minimized by financing the project in whole or in part in the local currency. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

International Risk Considerations (cont.) Political risk is much harder to protect against once a project is implemented. A foreign government can block repatriation of profits and even seize the firm’s assets. Accounting for these risks can be accomplished by adjusting the rate used to discount cash flows—or better—by adjusting the project’s cash flows. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

International Risk Considerations (cont.) Since a great deal of cross-border trade among MNCs takes place between subsidiaries, it is also important to determine the net incremental impact of a project’s cash flows overall. As a result, it is important to approach international capital projects from a strategic viewpoint rather than from a strictly financial perspective. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates Risk-adjusted discount rates are rates of return that must be earned on given projects to compensate the firm’s owners adequately—that is, to maintain or improve the firm’s share price. The higher the risk of a project, the higher the RADR—and thus the lower a project’s NPV. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Review of CAPM Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Using CAPM to Find RADRs Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Applying RADRs Bennett Company wishes to apply the Risk-Adjusted Discount Rate (RADR) approach to determine whether to implement Project A or B. In addition to the data presented earlier, Bennett’s management assigned a “risk index” of 1.6 to project A and 1.0 to project B as indicated in the following table. The required rates of return associated with these indexes are then applied as the discount rates to the two projects to determine NPV. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Applying RADRs (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Applying RADRs (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Applying RADRs (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: Applying RADRs (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjusted Discount Rates: RADRs in Practice Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjustment Techniques: Portfolio Effects As noted earlier, individual investors must hold diversified portfolios because they are not rewarded for assuming diversifiable risk. Because business firms can be viewed as portfolios of assets, it would seem that it is also important that they too hold diversified portfolios. Surprisingly, however, empirical evidence suggests that firm value is not affected by diversification. In other words, diversification is not normally rewarded and therefore is generally not necessary. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Risk-Adjustment Techniques: Portfolio Effects (cont.) It turns out that firms are not rewarded for diversification because investors can do so themselves. An investor can diversify more readily, easily, and costlessly simply by holding portfolios of stocks. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives If projects are independent, comparing projects with unequal lives is not critical. But when unequal-lived projects are mutually exclusive, the impact of differing lives must be considered because they do not provide service over comparable time periods. This is particularly important when continuing service is needed from the projects under consideration. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) The AT Company, a regional cable-TV firm, is evaluating two projects, X and Y. The projects’ cash flows and resulting NPVs at a cost of capital of 10% is given below. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) The AT Company, a regional cable-TV firm, is evaluating two projects, X and Y. The projects’ cash flows and resulting NPVs at a cost of capital of 10% is given below. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) The AT Company, a regional cable-TV firm, is evaluating two projects, X and Y. The projects’ cash flows and resulting NPVs at a cost of capital of 10% is given below. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) The AT Company, a regional cable-TV firm, is evaluating two projects, X and Y. The projects’ cash flows and resulting NPVs at a cost of capital of 10% is given below. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) Ignoring the difference in their useful lives, both projects are acceptable (have positive NPVs). Furthermore, if the projects were mutually exclusive, project Y would be preferred over project X. However, it is important to recognize that at the end of its 3 year life, project Y must be replaced, or renewed. Although a number of approaches are available for dealing with unequal lives, we will present the most efficient technique -- the annualized NPV approach. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) Annualized NPV (ANPV) The ANPV approach converts the NPV of unequal-lived mutually exclusive projects into an equivalent (in NPV terms) annual amount that can be used to select the best project. Calculate the NPV of each project over its live using the appropriate cost of capital. Divide the NPV of each positive NPV project by the PVIFA at the given cost of capital and the project’s live to get the ANPV for each project. Select the project with the highest ANPV. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) Annualized NPV (ANPV) 1. Calculate the NPV for projects X and Y at 10%. NPVX = $11,248; NPVY = $18,985. 2. Calculate the ANPV for Projects X and Y. ANPVX = $11,248/PVIFA10%,3 years = $4,523 ANPVY = $18,985/PVIFA10%,6 years = $4,359 3. Choose the project with the higher ANPV. Pick project X. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) Annualized NPV (ANPV) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Budgeting Refinements: Comparing Projects With Unequal Lives (cont.) Annualized NPV (ANPV) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Recognizing Real Options Real options are opportunities that are embedded in capital projects that enable managers to alter their cash flows and risk in a way that affects project acceptability (NPV). Real options are also sometimes referred to as strategic options. Some of the more common types of real options are described in the table on the following slide. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Recognizing Real Options (cont.) Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Recognizing Real Options (cont.) NPVstrategic = NPVtraditional + Value of Real Options Assume that a strategic analysis of Bennett Company’s projects A and B (see Table 10.1) finds no real options embedded in Project A but two real options embedded in B: During it’s first two years, B would have downtime that results in unused production capacity that could be used to perform contract manufacturing; Project B’s computerized control system could control two other machines, thereby reducing labor costs. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Recognizing Real Options (cont.) Bennett’s management estimated the NPV of the contract manufacturing option to be $1,500 and the NPV of the computer control sharing option to be $2,000. Furthermore, they felt there was a 60% chance that the contract manufacturing option would be exercised and a 30% chance that the computer control sharing option would be exercised. Value of Real Options for B = (60% x $1,500) + (30% x $2,000) $900 + $600 = $1,500 NPVstrategic = $10,924 + $1,500 = $12,424 NPVA = $12,424; NPVB = $11,071; Now choose A over B. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Rationing Firm’s often operate under conditions of capital rationing—they have more acceptable independent projects than they can fund. In theory, capital rationing should not exist—firms should accept all projects that have positive NPVs. However, research has found that management internally imposes capital expenditure constraints to avoid what it deems to be “excessive” levels of new financing, particularly debt. Thus, the objective of capital rationing is to select the group of projects within the firm’s budget that provides the highest overall NPV or IRR. Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Rationing Tate Company, a fast growing plastics company with a cost of capital of 10%, is confronted with six projects competing for its fixed budget of $250,000. The initial investment and IRR for each project are shown below: Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Rationing: IRR Approach Copyright © 2006 Pearson Addison-Wesley. All rights reserved.

Capital Rationing: NPV Approach Copyright © 2006 Pearson Addison-Wesley. All rights reserved.