A Case Study The Next Step Business Continuity Workshop For major Medical Center.

Slides:



Advertisements
Similar presentations
© 2006 The Adaptation of Linux within Government John Long CTO Sabeo Technologies.
Advertisements

Introduction to InMage Solutions Eric Burgener Senior Vice President, Product Management May2009.
1/16/20141 Introduction to InMage Solutions Eric Burgener Senior Vice President, Product Management December 2009.
MoFo and Disaster Recovery August 24, 2004 Bruce Friedman Infrastructure Manager
Information Technology Disaster Recovery Awareness Program.
© 2014 Vicom Infinity Storage System High-Availability & Disaster Recovery Overview [638] John Wolfgang Enterprise Storage Architecture & Services
RETHINK BACKUP & ARCHIVE. 2 Backup and Archive are Top IT Priorities Which of the following would you consider to be your org’s most important IT priorities.
1 The process of analyzing all core business functions and establishing an optimized timetable for recovery. Provides baseline for:  Justification for.
Business Continuity Section 3(chapter 8) BC:ISMDR:BEIT:VIII:chap8:Madhu N PIIT1.
VERITAS Confidential Disaster Recovery – Beyond Backup Jason Phippen – Director Product and Solutions Marketing, EMEA.
© 2009 EMC Corporation. All rights reserved. Introduction to Business Continuity Module 3.1.
© 2007 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Data protection and disaster recovery.
1 Disk Based Disaster Recovery & Data Replication Solutions Gavin Cole Storage Consultant SEE.
Oracle Data Guard Ensuring Disaster Recovery for Enterprise Data
© FalconStor Software 2011 · All Rights Reserved DR Automation for Physical and Virtual Infrastructure Simplify and Enhance VMware Disaster Recovery.
Virtualization Across The Enterprise Rob Lowden Director, Enterprise Infrastructure Indiana University 23 May 2007.
Barracuda Backup Service Data Backup and Disaster Recovery.
1 © Copyright 2010 EMC Corporation. All rights reserved. EMC RecoverPoint/Cluster Enabler for Microsoft Failover Cluster.
1© Copyright 2011 EMC Corporation. All rights reserved. EMC RECOVERPOINT/ CLUSTER ENABLER FOR MICROSOFT FAILOVER CLUSTER.
Barracuda Networks Confidential1 Barracuda Backup Service Integrated Local & Offsite Data Backup.
Storwize V7000 IP Replication solution explained
© 2010 IBM Corporation Kelly Beavers Director, IBM Storage Software Changing the Economics of Storage.
1 © Copyright 2010 EMC Corporation. All rights reserved. EMC RecoverPoint One way to protect everything you have…better.
IBM TotalStorage ® IBM logo must not be moved, added to, or altered in any way. © 2007 IBM Corporation Break through with IBM TotalStorage Business Continuity.
© 2000 DataCore Software Corp Networked Storage Pools Financial Industry Application.
Sample Title Slide Standard Template Presenter’s Name, Title Date PROTECTION DATA (re)DEFINED.
1 © Copyright 2009 EMC Corporation. All rights reserved. Agenda Storing More Efficiently  Storage Consolidation  Tiered Storage  Storing More Intelligently.
November 2009 Network Disaster Recovery October 2014.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
© Novell, Inc. All rights reserved. 1 PlateSpin Protect Virtualize your Disaster Recovery.
New Facilities & Disaster Recovery Solutions 0 February 20, 2007 Agency IT Resources Communications Exchange Meeting Facilities and Disaster Recovery Solutions.
DotHill Systems Data Management Services. Page 2 Agenda Why protect your data?  Causes of data loss  Hardware data protection  DMS data protection.
NOAA WEBShop A low-cost standby system for an OAR-wide budgeting application Eugene F. Burger (NOAA/PMEL/JISAO) NOAA WebShop July Philadelphia.
Information Availability Brett Paulson Sr. VP and Chief Information Officer Board of Trade Clearing Corporation FIA – November 7, 2002.
©2006 Merge eMed. All Rights Reserved. Energize Your Workflow 2006 User Group Meeting May 7-9, 2006 Disaster Recovery Michael Leonard.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
IT Disaster Recovery CAUBO 2008 Information Systems and Technology.
IO – CART Project Status Protocol Revision Subcommittee Update 06/22/06.
Data Synchronization by Dennis Sparrow. Infrastructure  New York Board of Trade (NYBOT) maintains 3 sites –Primary Trading Floor –Primary Data Center.
© 2011 IBM Corporation Architect’s 2013 Guide to Designing HA, BC, and DR - Best Practices Industry Best Practices - IT HA DR BC Provided by: John Sing,
Storage Trends: DoITT Enterprise Storage Gregory Neuhaus – Assistant Commissioner: Enterprise Systems Matthew Sims – Director of Critical Infrastructure.
Microsoft Azure Storage. Networking Compute Storage Virtual Machine Operating System Applications Data & Access Runtime Provision.
Module 13 Implementing Business Continuity. Module Overview Protecting and Recovering Content Working with Backup and Restore for Disaster Recovery Implementing.
E-TechServices's IT Strategy Open. Virtualize. Rationalize. A Strategy for Optimal IT Deployment.
1 IBM TIVOLI Business Continuance Seminar Training Document.
Project Name Program Name Project Scope Title Project Code and Name Insert Project Branding Image Here.
ENTERPRISE TIER 1 SAN STORAGE UPGRADE March 2014.
The Power of Aligning Backup, Recovery, and Archive Bob Madaio Sr. Manager; Backup, Recovery and Archive Marketing EMC Corporation.
1 IA B40: NetBackup Customer Panel Spotlight: Real-World Advice and Experiences with NetBackup Rachel Dines Senior Analyst, Serving Infrastructure & Operations.
Luminex Virtual Tape Storage System Brian Sullivan Director of Computer Operations Broward County Public Schools 1.
A Case Study Julie J. Smith Wachovia Corporation Superdome Implementation at a Glance.
TRUE CANADIAN CLOUD Cloud Experts since The ORION Nebula Ecosystem.
Project Vision Improve Resilience of NetWare User Filestore Improve Resilience of Corporate Database Filestore Disaster Recovery Options ? Backup, Archival,
CommVault Architecture
Open-E Data Storage Software (DSS V6)
Providing Application High Availability
iSCSI Storage Area Network
Disaster Recovery Constituent Group
Acutelearn Technologies Tivoli Storage Manager(TSM) Training Tivoli Storage Manager Basics: Tivoli Storage Manager Overview Tivoli Storage Manager concepts.
What Do We Do? Managed IT services
2018 Huawei H Real Questions Killtest
Disaster Recovery Services
Agency IT Resources Communications Exchange Meeting
Planning High Availability and Disaster Recovery
Business Continuity Technology
Storage Trends: DoITT Enterprise Storage
Disaster Recovery at UNC
Presentation transcript:

A Case Study The Next Step Business Continuity Workshop For major Medical Center

Partial Key Performance Indicators for Medical Center’s IT Business Continuity Title of KPI:Definition:Measurement:Target: Backup window Duration daily planned application outage Total time in minutes appl must be quiesced Time to recover (i.e. time to switch sites) Time to switch sites and restore service Total time in minutes: outage => users online Testing frequency (preparedness) Frequency per month of end to end BC test Average system response time Application response time at bedside Average and peak response time in sec Average problem resolution time Average time identify, resolve applic. problem Bandwidth costs Monthly cost of bandwidth to DR site Dollars/month of expense How much data is being replicated Amount of data being replicated by PR,Radio Percentage growth rate data Annual growth % data production PR, Radio. Quarter to quarter data allocation report Procedural Financial Step 1: Collect Info For Prioritization

Scope - Resource and Business Impact ComponentPatient RecordsRadiology ApplicationsPR1EPIC1, PR1MSE1, MSE2 Data and data management policies Backup daily at night by TSM Backup daily by VeritasBackup daily by MSM DatabasesDB2Oracle, DB2MSSQL1 ServersMainframe1UNIX1, Mainframe1 MS222, MS223, MS224 Storage33801, 33802SUN101MSS1, MSS2 Network (LAN, WAN)SLAN1 and SLAN2SLAN2 and SLAN3LAN2, LAN3 Procedures and toolsData Center M1Data Center M1, M2Data Center M3 PeopleJ1, J2M1, J1K1, K2 Facilities and physical location DC1 Known vulnerabilitiesFlood Flood, servers Estimated cost of outage, per hour $200K*$150K*$20K* Business ImpactHigh Medium Ranking 123 Step 1: Collect Info For Prioritization

Component effect on business processes Application / Component Business processes affected PriorityNotes Patient Records (PR1)PR, Radiology1 EPIC1PR, Radiology2 MSE1All4 Mainframe1All All5 UNIX1EPIC19Backup server in place LAN1All10Backup LAN2 in place DC1All6DC2 is being planned Step 1: Collect Info For Prioritization

Define Vulnerabilities NATUREImpactLikelihoo d ranking PEOPLEImpactLikelihood ranking EQUIPImpactLikelihood ranking FireHighLowHuman error…. MediumHighApplicati ons HighLow Weather, severe storms High Malicious …. MediumLowServersHighLow Earthquak e HighLowProcedur e…. MediumHighStorageHighLow Water/floo d High Network ….. HighLow Only Data Centers Step 2: Vulnerabilities, Risk Assessment, Scope

Define BC target Business Process Current Recovery Time: Success rate % Budget spent to achieve this Cost of outage / hour (total $cost avoided) Target desired Recover Time Desired success rate % Projected cost avoidanc e: Projected budget Patient Records 4 hours???$100K$200K30 min100%??? Radiology8 hours???$40K$150K15 min100%??? 30 mingood$10K$20K15 min100%??? Step 3: Define BC targets based on Scope

Business Process Segmentation Business Continuity Tier AvailabilityDisaster Recovery Recovery Time Objective Data Currency (Recovery Point objective) Disaster Recovery performance degradation objective Acceptable data loss Sample Business Process Notes Continuous Availability 99.99%1 hour5 seconds50%.1%Patient Records, Radiology (Cost can be listed here) Rapid Data Recovery 99%8 hours1 hour50%1% , Pharmacy “ Backup / Restore 98%36 hours24 hours50%1%Billing“ Step 4: Solution option design and evaluation

Diagram of primary data center - before IBM Current core applic. Various application servers, spread across multiple business lines Wintel – servers and growing LAN/WAN ATM, Ethernet Existing storage 1.5 TB,.5 TB, 2 TB, 2 TB, 4 TB, 3 TB, 24 TB.. Various softwares including Veritas Volume Manager, TSM, LTO, IBM Tape Library, DLT, ArcServe, etc. MS Exchange, Oracle, web servers, Etc. ……. Step 4: Solution option design and evaluation

Solution with secondary data center and remote replication IBM servers pSeries EPIC 1.5 TB,.5 TB, 2 TB, 2 TB, 4 TB, 3 TB, 24 TB.. Consolidation: Veritas Volume Manager, TSM, LTO, IBM Tape Library, etc. VMWARE for MS Exchange, Oracle, web servers, Etc. ……. Storage for MS Exchange, Oracle, web servers, etc. SAN SAN Volume Controller(s) HP Alpha ES47, HP/UX, IDX, PACS, interface engines, Cardiology, CCA lab, pharmacy, radiology, etc ATM, Ethernet LAN/WAN pSeries EPIC 1.5 TB,.5 TB, 2 TB, 2 TB, 4 TB, 3 TB, 24 TB.. Consolidation: Veritas Volume Manager, TSM, LTO, IBM Tape Library, etc. VMWARE for MS Exchange, Oracle, web servers, Etc. Consolidated storage for MS Exchange, Oracle, web servers, etc. SAN SAN Volume Controller(s) Consolidation: HP Alpha ES47, HP/UX, IDX, PACS, interface engines, Cardiology, CCA lab, pharmacy, radiology, etc ATM, Ethernet LAN/WAN Secondary data center Primary data center Step 5: Recommended solutions and products

Suggested Key Performance Indicators for customer IT Business Continuity Title of KPI:Definition:Measurement:Target: Backup window Duration daily planned application outage= 20 min Total time in minutes appl must be quiesced Reduce to from 20 min to 1 min by 1Q2007 Time to recover (i.e. time to switch sites) Time to switch sites and restore service Total time in minutes: outage => users online Reduce to 30 minutes by YE2007 Testing frequency (preparedness) Frequency per month of end to end BC test Number of times/mo for BC test Improve from 2x/yr to 1x per month Average system response time Application response time at bedside Average and peak response time in sec In DR mode, maintain no more than 40% increase in resp. time Average problem resolution time Average time identify, resolve applic. problem Average time in hours from initial report Reduce average time to 2 hours by YE2007 Bandwidth costs Monthly cost of bandwidth to DR site Dollars/month of expense Keep % annual expense growth < 20% How much data is being replicated Amount of data being replicated by PR,Radio Total production TB allocated to PR, Radio. Maintain at 20% of total production TB Percentage growth rate data Annual growth % data production PR, Radio. Quarter to quarter data allocation report % growth = 10% less than patient growth % Procedural Financial Step 6: Recommended Strategy and Roadmap

18 month IT Business Continuity Implementation phases Implement BC Tier 4 – Standardize use of disk to disk and Point in Time disk copy Implement BC Tier 5 Standardize DB / Application Mirroring methods Implement BC Tier 6 – Standardize use of async replic with storage virtualization Implement BC Tier 7 – Standardize use of Continuous Availability automated failover Implement BC Tier 3 – Consolidate and standardize Backup/Restore methods. Implement tape Vault, Server / Storage Virtualization / Mgmt tools Implement 2 nd Site (Tier 1, 2) Production Backup/Restore BC Tier 1, 2 Foundation: SAN and server consolidation Infrastructure Simplification Backup/Restore BC Tier 1, 2 Foundation: SAN and server consolidation Infrastructure Simplification Backup / Restore Rapid Data Recovery Continuous Availability Phase 1 Phase 2 Phase 3 Phase 4 Step 6: Recommended Strategy and Roadmap