 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.

Slides:



Advertisements
Similar presentations
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Advertisements

CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Overview of ER & Availability Based Tariff P.Mukhopadhyay.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
April, 2006 PRESENTATION BY POWERGRID. FORMATION OF POWERGRID POWERGRID was formed in 1989 and began commercial operation from 1992 – 93 with the following.
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Presentation on Over view of Indian Transmission Grid
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Hon’able Members of Standing Committee on Energy WELCOMES POWER GRID CORP. OF INDIA LTD.
Electric Entities: New Models
Alok Roy. UHV/EHV Level HV/MV Level LV Level The Concept of a power grid.
Consultancy by : Power Grid Corporation of India Ltd.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
NORTHERN REGIONAL LOAD DISPATCH CENTER 12 th June 2004 Director DOE MD BPC Advisor DOE Royal Govt of Bhutan WELCOMES POWER GRID CORPORATION OF INDIA LTD.
POWERGRID Welcomes Hon’able Members of “Standing Committee on Energy”
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
W E L C O M E Power Grid Corporation of India Limited.
Power Grid Corporation of India Ltd.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
Evolution of Indian Power Grid Phenomenal expansion since Independence  Generation : 1349 MW 101,866 MW (in 1947) (in 2001)  Grid : Local grid – at.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
POWER GRID CORP. OF INDIA LTD. Dr. Montek Singh Ahluwalia
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1 st June 2004 Shri P. M. Sayeed Hon’ble Minister of Power Govt. of India WELCOMES POWER GRID CORPORATION OF INDIA.
WELCOME TO CIGRE MEMBERS
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Electric Entities: New Models Sh. R.P. Singh CHAIRMAN & MANAGING DIRECTOR POWER GRID CORPORATION OF INDIA LIMITED.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Overall National Grid Development: Constraints & Options
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Wednesday, March 31, 2004 MANAGEMENTOF LOAD DISPATCH CENTERS.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Dr. Montek Singh Ahluwalia Dy. Chairman, Planning Commisson WELCOMES POWER GRID CORP. OF INDIA LTD.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
Sterlite Grid Limited Sterlite Grid Limited
Introduction to the course
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Yangon Region Rural electrification plan
HVDC Transmission Systems:
Presentation transcript:

 POWERGID – PERSPECTIVE PLAN

POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation of Inter-state, Regional & National Power Grid  Grid Management / System Operation of the five Regional Load Despatch Centres (RLDCs). Contd..

2300 Regional Grids of India Total Capacity = 1,12,360 MW 30,860 MW 32,700 MW 16,000 30,500 MW 2300 MW

POWERGRID & System Operation  RLDCs - Responsiblities  Apex Body for Integrated Grid Operation of the Region  Scheduling and Despatch of Electricity on real time basis  Energy Accounting  Supervision and Control of Inter – State Transmission System  Ensure Grid Security and adherence to Indian Electricity Grid Code(IEGC)

RTU SUB LDC SLDC ERLDC WRLDCNRLDCSRLDCNERLDC NLDC 32 Nos. 51 Nos Nos. Unified Grid Operation 5 Nos.

 Three RLDCs namely Northern, Southern & North-Eastern Regions have been modernised at an cost of about Rs Crs.  Mordernisation of Eastern & Western Regions RLDCs underway.  Estimated cost : Rs. 564 Crs.  Schedule : ER by June ’05 & WR by March’06 Modernisation of RLDCs

Main Feature of Unified Load Despatch System Unified Supervision & Control of Grid through dedicated Communication System on real time Basis.  Supervisory Control & Data Acquisition ( SCADA)  Real time acquisition of critical electrical parameters like Voltage, Frequency, MW & MVAR  Real Time Energy Management System  Contigency Analysis  Optimum Power Flow for reliability & security of the system  Merit Order Operation including Hydro-Thermal Mix  Load Forcasting  Quick Restoration of Grid in case of disturbance  Real Time Environment For Training Operators to cope with contingencies

Modernisation of RLDCs Has Resulted Into:  Considerable Improvement in System Parameters viz., Frequency & Voltage.Improvement in System Parameters  Merit Order Operation, Leading to Overall Economy Merit Order  Introduction of ABT (Availability Based Tariff), resulting in improved Grid stability  Transparency in grid operation  Quantum leap in intra and Inter Regional Power Exchange and TradingInter Regional Power Exchange and Trading  Infused Grid Discipline THERE HAS BEEN NO MAJOR GRID DISTURBANCE IN LAST 22 MONTHS

POWERGRID the Transmission Utility  POWERGRID started its commercial operation in  Over 40% of total power generated ( about 45,000 MW) is wheeled by POWERGRID  It operates & maintains 50,000 Ckms. of EHV Tr. System along with 82 Sub-stations at over 99% system availability. It operates & maintains 50,000 Ckms. of EHV Tr. System along with 82 Sub-stations at over 99% system availability Contd..

POWERGRID the Transmission Utility Excellent performance is through:  Robust system design after detailed studies with thrust on integrated development  Deployment of Hot line maintenance technique Deployment of Hot line maintenance technique  Use of Emergency Restoration System Use of Emergency Restoration System  Trained and dedicated manpower with decentralized administrative powers.

POWERGRID’s Perspective Plan Investment of Rs. 71,000 Crore in X and XI Plan (2012)  Rs. 51,000 Crs. to be brought in through IR and loans  Balance Rs.20,000 Crs. through private investment. National Grid National Grid of 30,000 MW capacity planned by 2012 to utilise the generation resources optimally.generation resources optimally  Inter Regional Transfer Capacity  Existing capacity : 8,500 MW  by : 30,000 MW

Benefits of Inter-Regional Exchanges  Exchange of Power from Surplus to Deficit Region  Higher Consumer Demand Met  Better Utilisation of available Generating Capacity.  Utilisation of diversity of Peak / Off-Peak period  Inter-Regional exchanges  22,000 MUs valued at around Rs. 4,400 Crores ( )  10,018 MUs valued at around Rs 2,000 Crores ( April’04 to July 2004 )  States Maximum benefited :  Maharashtra, Gujrat Madhya Pradesh  Punjab, Haryana, U.P. Karnataka, Tamilnadu, A.P.  West Bengal, Orissa and NER States  Improvement in system stability and grid parameters.

TRANSMISSION FACILITIES OF POWERGRID IN WR  Transmission lines :About 10,700 Ckt km. Transmission lines :About 10,700 Ckt km.  400 kV – 9700 Ckt km  220 kV – 1025 Ckt km  400 kV Substations- 7 nos. with 2835 MVA capacity (Jabalpur, Satna, Raipur, Dehgam, Mapusa, Bhadravati, Itarsi)  Inter-Regional Links : 3550 MW  1000 MW, HVDC back to back link at Chandrapur  500 MW, HVDC back-to-back link at Vindhyachal  1200 MW, Raipur – Rourkela 400 kV D/c lines  220 kV lines between WR & ER ( 450 MW) and WR & NR (400 MW)

R&D and Technology Development in POWERGRID Deployment of State-of-the-Art technology  HVDC & EHVAC Transmission System upto 800 kV with multi Ckts. HVDC & EHVAC Transmission System upto 800 kV with multi Ckts.  Use of fixed & variable Series Compensator (FACTS)  Extra High Towers to avoid deforestation and protection of wild life Extra High Towers to avoid deforestation and protection of wild life  Compact Towers to reduce Right Of Way Compact Towers to reduce Right Of Way  High Temperature Conductors for increased Loading  Automation of Sub-stations. Automation of Sub-stations.  Compact S/stn to reduce land requirement. Compact S/stn to reduce land requirement.  Satellite imagery for Transmission Line Survey. Satellite imagery for Transmission Line Survey

Manpower And System Development  5725 employees in and 6828 at present though Operations have grown six (6) times Operations  Possible due to effective systems in Design, Engineering, Contracts, HR, O&M and Project Management.  Structured training of personnel at all levels.  5 Regional Training Centers already established and plans to establish R&D and National Training Center at Bhiwadi, Rajasthan in 2 years time.  Training of SEBs in Design, Operation and Maintenance of Transmission System and Load Despatch System

Assistance in execution of Distribution works Assistance in execution of Distribution works  POWERGRID is Advisor cum consultant for APDRP works in 18 states  POWERGRID is assisting in execution of Distribution works in Bihar, Goa, Meghalaya and Mizoram  In Bihar, schemes costing about Rs. 663 cr. include :  Establishment of 38 nos. of new and R&M of 200 nos. of 33/11 kV sub-stations  Construction/Reconductoring of about kms. of 33 kV & 11kV lines  Installation / Renovation of about nos. of Distribution Transformers  In GOA, schemes costing about Rs. 175 cr. include  Establishment of 3 nos. of new and R&M of 38 nos. of 33/11 kV sub-stations  Construction/Reconductoring of about 850 kms. of 33 kV & 11kV lines  Conversion of Overhead distribution network to Underground Cable network in 2 cities, viz. Margaon & Panjim

Thank You

Prior To ABT & RLDC Administration After ABT & RLDC Administration

Profile of POWERGRID Profile of POWERGRID Back

Inter Regional Links Inter Regional Links Present IR Capacity = 8,500 MW By the year 2012 = 30,000 MW 500 MW 1200 MW 1000MW 2000MW 500 MW Back

Natural Energy Resources. Coal Hydro Back

Financial Profile of POWERGRID Back