Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 4: Special-Status Wildlife Preliminary Results.

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

American Oystercatcher Best Management Practices.
Telecommunications Overview Richard Selby. Local Access Network The link between the customer and the Local Exchange (or Switch) Sometimes called the.
EE 392 Stewardship Transmission Towers, Power Lines & Birds David Dukes Michael Harper.
 RBs oversee various programs and have specific information needs for each  e.g., 303(d), MS4, 401/wetlands, irrigated lands, point source dischargers,
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
WHITE SANDS MISSILE RANGE AVIAN PROTECTION PLAN: BIRD PROTECTION IN SUPPORT OF THE MILITARY MISSION LORI NIELSEN EDM INTERNATIONAL, INC. SR WILDLIFE BIOLOGIST.
TNMP’s Avian Protection Plan Protecting Birds and Reducing Liability SWEDE Conference April, 2012.
Monitoring Conservation Easement Lands in Orange County
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Approach for Developing New.
Module 3 Counterpart Regulations Standards of Review for Determining Project Effects.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Cerulean Warbler Atlas Project for Private Lands 1 CERULEAN WARBLER ATLAS PROJECT FOR PRIVATE LANDS A Voluntary Landowner- conducted Survey Presentation.
Module 4: Overhead and Underground Power Lines. Overview of Module 4 Background on power lines Hazards of overhead and underground power lines Injury.
Assessing Project Related Impacts to Migratory Birds.
Electricity Service Delivery 2 Aim To provide students with information to enable them to deal with the effects of electricity at incidents.
National Pollutant Discharge Elimination System (NPDES) NPDES in effect on November 1, 2011 Presentation by : Tom Janousek, Pest Consulting Services, Omaha,
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
APPLIED ELECTRICITY SS3
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
BEX – Basic Electricity – Unit 13 Magnetic Motors REF: Delmar’s Standard Textbook of Electricity, Unit 13.
Terrestrial Resources Working Group June 3, 2008.
Electrical Power & Safety Electricity How do we get power?
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
ELECTRICAL BASICS (Chapter 8) Electrical terms Electricity & magnetism Electricity Circuits Magnetism Electrical units Electric potential or eletromotive.
Electrocution of Raptors
Implementing Conservation Measures to Reduce Impacts to Migratory Birds.
American Community Survey (ACS) Program Review Webinar March 6, 2012.
ISO GENERAL REQUIREMENTS. ISO Environmental Management Systems 2 Lesson Learning Goals At the end of this lesson you should be able to: 
Avian Protection Plans Cooperative Utility/Agency Efforts to Reduce Bird Mortality and Improve Service Reliability.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting April 8, 2008.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
1 Service Delivery Point(s) for Multi-tenant Facilities An Overview Matt Imel Sr. Tariff Specialist PG&E December 8, 2011.
ELECTRICAL DESIGN GUIDELINE STEPS Maria C. Gonzalez.
Electric Powerlines: Design and Construction to Minimize Hazards to Raptors Tonya Buckmaster (OSM-WRCC), Pete Hess (DOGM), Howard Strand (OSM-WRCC), and.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
MEPA MEPA Regulations ( 301 CMR ) MEPA Regulations ( 301 CMR ) Large projects that require.
1 Action Items for Management Board Challenges for Implementation of Recommendations.
Raptor and Corvid Use of Utility Poles:
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Middle Fork Project TERR 6 - Special-Status Bat Technical Study Plan Report Overview March 3, 2008.
Revisiting the CFIRP : Assessing long ‐ term ecological value and characteristics of snags created for wildlife J.W. Rivers & J. Hagar.
Electricity supply companies and bird protection in the Czech Republic and a role of the Czech Society for Ornithology/BirdLife Czech Lukáš Viktora Czech.
Practice with Screening & Getting started with the on-line IEE Assistant.
Condition of Forests in San Diego County: Recent Conifer Tree Mortality and the Institutional Response Presented by California Department of Forestry Mark.
Habitat Fragmentation Process of breaking contiguous unit into smaller pieces; area & distance components.
BIRD HABITATS Birds build nests. Nests keep eggs safe. Nests keep birds safe. Nests provide shelter.
Middle Fork American River Project Vegetation & Integrated Pest Management Plan (VIPMP) Meeting March 28, 2011 Handout No. 1.
The definition of the Earth system or grounding: the electric connection between the work of intentionally electrical device or network devices on the.
Report on the Western Cape outages for the period November 2005 to February 2006.
DOE Environmental Protection Program WORKSHOP MIGRATORY BIRD PROTECTION LEE BANICKI (202)
1 Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 1: Vegetation Communities and Wildlife.
 Harp traps are designed to catch flying bats without damaging their wings.  They consist of a frame that supports two rows of fine thread, and a catching.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
March 23, 2015 Missouri Public Service Commission | Jefferson City, MO.
Overhead and Underground Power Line Safety 1 Quentin Baker Director of Safety
UNIT-5. ELECTRICAL SAFETY, WIRING & INTRODUCTION TO POWER SYSTEM
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
Rosamaria Gonzales – USDA Wildlife Services
Placer County Water Agency Middle Fork American River Project FERC Project No February 26, 2008.
Watershed Literacy & Engagement
Best Practices: Administrative Controls
Electrocution of Raptors
Placer County Water Agency Middle Fork American River Project Plenary Meeting October 5, 2010.
Presentation transcript:

Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 4: Special-Status Wildlife Preliminary Results Powerline Risk Assessment Component

2 Study Objective Determine whether Project communication lines and powerlines are consistent with Avian Power Line Interaction Committee (APLIC) Guidelines APLIC GUIDELINES Powerpole configurations and avian deterrent recommendations

3 Extent of Study Area All Project powerlines and communication lines (excludes underground powerlines) Does not include PG&E transmission lines

4 Powerline Risk Assessment Study Methods Overview Pole Evaluation Conduct preliminary powerline and communication pole and line evaluation Habitat Assessment Determine location of powerlines in relation to appropriate habitat Determine availability of nesting or roosting trees or perches Document avian use of powerlines Summarize documented avian electrocutions

5 Powerline Risk Assessment Pole Evaluation Typical APLIC “problem” powerline characteristics:  Usually distribution lines  Distance between conductors is less than wingspan of landing/perching bird  Grounded hardware or equipment in proximity to energized conductors/jumper wires

6 Typical APLIC “Problem” Powerline Configurations

7 APLIC Recommended Powerline Configurations

8 Typical APLIC “Problem” Equipment Pole Configuration

9 APLIC Recommended Equipment Pole Configuration

10 Low voltage Insulated Do not pose risk of electrocution MFP Photovoltaic Pole and Powerline Evaluation

11 MFP Communication Pole and Line Evaluation Low voltage Insulated Do not pose risk of electrocution

12 MFP Pole and Powerline Evaluation Powerline pole configuration may pose potential risk

13 MFP Habitat Assessment Abundant alternative natural structures for nesting and foraging Powerlines are surrounded by appropriate habitat (e.g., hardwood and coniferous forest) No avian use detected during surveys No reported avian electrocutions or other mortalities

14 Next Steps