INSTALLATION OF UNDERGROUND WIRING SYSTEM IN A NEW DEVELOPING TOWN! Project Name !

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
TECHNICAL ANALYSIS.
System Implementation and Support
Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
Follow the ABCGA April is Safe Digging Month. Follow the ABCGA.
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
Responsibility Assignment Matrix (RAM) — Purpose  Ensure that all tasks are assigned to people  Show levels of involvement of people to work.
Introduction to Business Continuity Planning An Introduction to the Business Continuity Planning Process Including Developing your Process and the Plans.
Network Design and Implementation
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
Project management A whistle-stop tour Toot!. Places to see Overview Project design in detail Task analysis example Design documentation examples Terminus.
Lessons Learned from Guy Wire and Anchor Replacement at Sequoyah Nuclear Plant by Doyle Pittman 12th NUMUG Meeting
Monitoring Vibration on Tunnel Fans Safety First The worlds developing infrastructure creates many technical challenges for engineering and construction.
Security Benefits of Energy R&D Presented to the Conference on Estimating the Benefits of Government-Sponsored Energy Technology R&D March 4, 2002 Margie.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 2 Slide 1 Socio-technical Systems.
Other Planning Processes: Final Planning Touches
ERP Raghunath M D BSNL Mobile Services, Ernakulam, Ph:
HUMAN RESOURCE PLANNING
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Important points and activities.  The objective is to secure life, property, information in the event of a disaster and to facilitate business continuity.
Estimating Project Cost The total project cost includes both direct and indirect costs. Materials, supplies, and labor used in a project are called "direct.
© SYBEX Inc All Rights Reserved. Session 2 Project Management Overview: What Is Project Management?
© 2008 Eventure Events. All rights reserved. Mitigating Business Risks with Strategic Workforce Planning Lina Doucet Bruce Power.
“How to fail in project management without really trying” –J. K
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
After the Storm Recreated from Carolina Country, the monthly magazine of the N.C. Association of Electric Cooperatives The steps to restoring power Click.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Texas Nodal Program ERCOT Readiness Update TPTF March 31, 2008.
How to Develop a Winning Project Plan © Edward B. Farkas, CHS, CPM, MIEEE, PMP Managing Director, Project Management Practice ETR Technology Center.
VP2 CLIENT DESIGNED SOLUTIONS Lee Chant. 2 DELIVERY - A CHANGING LANDSCAPE Customer buying profile has changed Desire to outsource piece’s of work Desire.
Unit 1 – Business Organisation & Environment Change and the management of change HL ONLY.
Risk Management for Business
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
1 1 Xolani Lembede 2010 ESI Forum Meeting 08 April 2010.
Disaster Preparedness and Response Strategy. Agency Mandate Rapid Response’s mandate is to respond to any emergency that puts at great risk the survival,
Project Management (1) Chapter 16, Part 1. Overview of Management 326 Operations and Operations Strategy Products, Processes, & Quality Operations Planning.
General Condition 24 Sales and Marketing of Fixed-Line Telephony Services.
©Dr. Respickius Casmir Network Security Best Practices – Session 2 By Dr. Respickius Casmir.
Advanced Project Management Tools and Techniques of Project Planning Ms. Ghazala Amin Slides Courtesy: Dr. A Z. Khan.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Computer System Support   The costs of installing, operating and maintaining computer systems are called total costs o ownership or TCO  TCO includes.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
12.1 Plan Procurement: Introduction
Utilities and Crisis Management June 13, 2015 Carolyn Bermudez Vice President and General Manager, Operations.
ARMENIA: OBA SCHEME FOR PROVISION OF GAS AND HEATING Washington D.C. March 8, 2006 Energy Week.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
WORKSHOP ON ORGANIZATION & MANAGEMENT OF NATIONAL STATISTICAL SYSTEMS DAKAR, SENEGAL 28 TH SEPTEMBER – 1 ST OCTOBER 2010 KWENAGAPE KENNY MOGOTSINYANE CENTRAL.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
MESH ENTERTAINMENT Project Plan. The Project Team AWESOME 7 PROJECT PLANNING LTD. Members:
Flood resilience grant. Aim of the session Key facts and dates Overview of project delivery Eligibility overview Definition of resilience v resistance.
Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B
Project Planning and Implementation
HNC/D Project Management
Installation Plan Checklist
Project Management Essentials Connecting PI to PM
An-Najah National University
Hovercraft project.
IS Project Management Mini review
PROJECT MANAGEMENT (BSBI 622)
Planning assignment in MS-Project
AMCOMET Technical Segment Session 5: Scaled up Public – Private partnerships Cairo, Feb.19, 2019 Effective PPE & financing for improved NMHS sustainability.
BACKGROUND Team Members Project /Sub-Project Title :
Presentation transcript:

INSTALLATION OF UNDERGROUND WIRING SYSTEM IN A NEW DEVELOPING TOWN! Project Name !

Project Members

To perk up the customary of living Corporate Agenda

 To cope with the problems that occur due to the typical electricity transmission lines  Maximum Possibility of cable impairments  Irregular supply of electricity  Maximum Possibility of injuries Background

Project will be benefited to :  Mitigate damages to power lines structure and system  Restore power quickly  People are much secured.  To elude transport difficulties in town Project Reimbursement

 Install best underground wiring system to provide 24/7 electricity supply  Provide safe and secured environment to people  To make the town adductive Project Objectives

 Electric Cables  Digging  Sand  Concrete Cover  Acquiring Labor  Technical Staff Project will Comprise

 Bad weather may cause problems  Some resistance of sand during digging Constraints

 Project wont be interrupted by telecom, gas and sewerage pipes  Electricity supply wont be interrupted by other sources  Smooth supply of electricity to consumers Key Assumptions

 The project manager  Finance manager  Civil contractor  HR manager Project Team Work

Project Manager Finance Manager Marketing Manager HRM Manager Civil Manager Asst. Manager Asst. Manager Asst. Manager Supervisor AccountantAdvisorAdministratorForeman CashierPromoterClerkLabor Activities

A. Selection of Material B. Selection of digging Channels C. Tender Floating D. Tender Accepting E. Procurement F. Digging G. Sand laying H. Cable Line I. Putting Concrete cover J. Check Post Selection K. Digging for check post L. Tiles laying Activities

ActivityPredecessor Time(Days) A ---3 B A5 C B4 D C 4 E D2 F D7 G F,E3 H G5 I H4 J H2 K J5 L K,I6

E=2 Dummy Activity A=3 B=5 C=4D=4 G=3 H=5 I=4 L=6 F=7 J=2 K= Network Diagram

Contains only one critical path A-B-C-D-F-G-H-J-K-L = 44 days Dates to remember :  Starting : Ist Feb,2008  Ending : 22nd march,2008  Time Duration : 44 days(Excluding 7 holidays) Critical Path

Material Procurement : Rs 20,000 Marketing Cost : 5,000 Training Cost : 4,000 Contractor Payment : 15,000 Transportation Cost : 3,000 Labor Cost : 20,000 Other Cost : 10,000 Total Cost : 77,000 Budget