The International Linear Collider (ILC) – Dubna Siting Leader – JINR Head Engineer G. Shirkov Международный Линейный Коллайдер.

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
S.Karyaeva 1, Y.Budagov, A.Dudarev, A.Krasheninnikov 1, E.Petrovskaya 1, G.Shirkov 1 – Moscow Institute of Architecture.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
The Linear Collider – accelerator design A particle beam accelerator is a microscope – the resolution is inversely proportional to the energy of the beams.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
1 STATUS OF ILC ACTIVITY AT JINR G. Shirkov Session of RAS, Protvino, December 22, 2008.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
Joint Institute for Nuclear Research Joint Institute for Nuclear Research International Intergovernmental Organization JINR and RUSSIA PARTICIPATION in.
CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25,
JINR Dubna site proposal for ILC G.Trubnikov Joint Institute for Nuclear Research Sendai, March 2008.
Electrical Equipment Park in in Russian Federation Russian Federation on the basis of Korean technology Project’s conception presentation Moscow Region.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Report from the Program Advisory Committee for Particle Physics to the JINR Scientific Council T. Hallman for J. Nassalski JINR Scientific Council Meeting.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
The International Linear Collider: Status of International Mega- Project and Proposal of Siting in Dubna Region Y.Budagov, Y.Denisov, I.Meshkov, G.Shirkov,
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
J.P.Delahaye GDE Meeting OXFORD CERN participation to ILC ILC- MoU: Support to GDE Contribution to GDE: J.L.Baldy: Civil Engineering & Conventional.
1 STATUS OF ILC ACTIVITIES AT JINR J.Budagov, A.Dudarev, M.Lyablin, G.Shirkov, G.Trubnikov, A.Sissakian JINR, Dubna, Russia Presented by A.Dudarev.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
DESY Deutsches Electron Synchrotron Shima Bayesteh.
Linear Collider Forum of America ILC Technology Applications Workshop Ken Olsen LCFOA President May 15,
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 102 nd Session, September 2007, Dubna.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
1 Status of the ILC activity at JINR PAC for Particle Physics 29 January 2009 G.V. Trubnikov.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Plans for JINR’s participation in the International Linear Collider Project G.Shirkov, JINR for Particle Physics PAC 26 th meeting, November
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Experimental hall design in Japanese site
Investigation of Road Project
(Potential) Site and Utilities
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
Summary Some Issues of Future Consideration
Status of the PANDA Solenoid Magnet Production in BINP
Presentation transcript:

The International Linear Collider (ILC) – Dubna Siting Leader – JINR Head Engineer G. Shirkov Международный Линейный Коллайдер

Schematic of the ILC e - (e + ) source and delivery system Damping Ring(s) Ring(s) To Main Linac (RTML system) Main Linac (ML) Beam Delivery System (BDS) Beam Dump (BD)

ILC Site Power ~ 330MW Sub-Systems 60MW Main Linacs 140MW Cryogenics: 50MW RF: 90MW 65% 78% 60% Beam 22MW Injectors Damping rings Auxiliaries BDS

Cryogenic Plants Water Processing Plants Electrical Substations

ILC siting and conventional facilities in Dubna region

Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18 member states;4 associate members

-The international intergovernmental organization Joint Institute for Nuclear Research - prototype of ILC host institution; -Experienced personal of JINR in accelerators, cryogenics, power supplies and etc. -Infrastructure and workshops of JINR on the first stage of ILC project realization; - The town Dubna provides with all the necessary means of transport to deliver all kinds of the equipment of the accelerator itself and its technological systems: highways, railways, waterways (through Volga river to Black sea, Baltic sea, Polar ocean); - The international airport «Sheremetyevo» is situated at the distance of 100 km from Dubna (1.5 hours by highway); - Developed Internet and satellite communication; - A Special Economic Zone (industrial+scientific) in the Dubna region (Edict of Russian Government, Dec. 2005), provides unique conditions in taxes and custom regulations; - A positive reaction received in preliminary discussions with the interested governmental persons and organizations in Russia. Advantages of Location

Russian Satellite Communications Center

0 km 10 km 20 km 30 km 40 km 500 kV power line Volga river Dubna city

The area is thinly populated, the path of the accelerator traverses 2 small settlements and a railway with light traffic between Taldom and Kimry. Possible “line” crosses only the railway to Savelovo (of low utilization) and the River Hotcha with a very small flow rate. The climate is temperate-continental. The mean temperature in January is –10.7  С. The mean temperature in July is  С. The mean annual rainfall is 783 mm. The mean wind speed is 3.2 m/s. Strong winds (15 m/s) blow only 8 days/year. According to the climatic parameters, the territory of Dubna is considered to be comfortable. Area and Climate

Power and energetics The northern part of Moscow region and the neighboring regions have a developed system of objects of generation and transmission of electrical energy. There are first-rate generating stations: the Konakovo EPS (electric power station, ~30 km from Dubna) and the Udomlia APP (atomic power plant, ~100 km from Dubna). Two trunk transmission lines with the voltage 220 kV and 500 kV pass through the territory of Dubna. The investigation of possibilities of the power supply for the accelerator and its infrastructure with the total power up to 300 MW gives the following variant: Construction of the power line-220 kV, 35÷40 km long, directly from the center of generation – the Konakovo EPS to the Central Experimental Zone of the accelerator with a head step-down substations 220/110 kV. It will require the investment in larger amount but the cost of power obtained directly from the centers of generation will be lower for 40÷50 % (from 0.05$ per 1kWh down to $ per 1kWh in prices of 2006).

The area of the proposed location of the accelerator is situated within the Upper Volga lowland. The characteristic feature of this territory is the uniformity, monolithic character of the surface. The existing rises of the relief in the form of single hills and ridges have smoothed shapes, soft outlines and small excesses. The territory of the area is waterlogged. The absolute marks of the surface range from 125 to 135 m with regard to the level of the Baltic Sea. The difference of surface marks is in the range of 10 m only on the base of 50 km. Relief

The area of the proposed location of the accelerator is situated within the Russian plate – a part of the Eastern European ancient platform – a stable, steady structural element of the earth’s crust. The Russian plate, like all the other plates, has a well-defined double-tier structure. The lower tier or structural floor is formed by the ancient – lower Proterozoic and Archaean strata of metamorphic and abyssal rocks, which are more than 1.7 billion of years old. All these strata are welded into a single tough body – the foundation of the platform. The area of the ILC accelerator is located in the southern part of a very gently sloping saucer-shaped structure – the Moscovian syneclise. Alluvial deposits i.e. fine water-saturated sands, 1-5 m of thickness. Below one can find semisolid drift clay of the Moscovian glaciation with exception of detritus and igneous rocks. The thickness of moraine deposits is m. Geology

The ILC linear accelerator is proposed to be placed in the drift clay at the depth of 20 m (at the mark of m) with the idea that below the tunnel there should be impermeable soil preventing from the underlying groundwater inrush. It is possible to construct tunnels of the accelerating complex using tunnel shields with a simultaneous wall timbering by tubing or falsework concreting. Standard tunnel shields in the drift clay provide for daily speed of the drilling progress specified by the Project of the accelerator (it is needed for tunnel approximately 2.5 y’s).

BCD document (Conventional Facilities part) Documentation and Cost Estimation Site Assessment Matrix First official document from Russian State Project Institute with estimations on: Conventional facilities cost Siting (tunnel, land acquisition) cost and time schedule Energetics and power cost operational cost Labor cost JINR prepared and filled the following Documents for the possible hosting ILC: The overall value on consolidated estimated calculations in the prices of year 2006 for civil engineering work, underground and surface objects of the main construction gives the sum in order of X,X B$, including X B$ of costs of the tunnels construction for linear accelerator, all its technological systems and mines. Cost of power supply objects which will provide electric power directly from generator sources with special (favorable) cost of energy (tariff) is of order of xxx M$.

Structure JINR participation in ILC Accelerator physics & techniques Detectors Particle Physics Detector concepts R&D Experiments &Tests Program for new physics & experiments R&D Test facilities Infrastructure Siting Safety Scientific Council of JINR ( ): encourages JINR to be involved in the ILC design effort and to invest appropriate resources in scientific and technological developments to support its ability to play a leading role in the ILC project; supports the intention of JINR to participate actively in the ILC project and the possible interest of JINR to host the ILC JINR Committee of Plenipotentiaries approved this recommendation on The Committee of Plenipotentiary Representatives of the Governments of the Member States is the supreme body governing the Institute.Committee of Plenipotentiary Representatives

JINR at ILC accelerator Plans on opening of new theme JINR participation in design, construction and testing of prototype elements of the ILC accelerator complex ( ). Studying problem and main goal of researches: Development and creation of accelerator complex elements, study of the beam dynamics in linear colliders. Participating countries and international organizations Belarus, Germany, Italy, Russia, USA, Japan, CERN

1. Creation of the ILC injection complex prototype. Development and study of electron sources on the base of photocathode and control laser system. Creation and launching of the electron injector prototype with RF or DC gun. 2. Development and creation of the test facility on base of the electron linear accelerator LINAK-800 for testing with high-energy electron beam of accelerating RF resonators, beam parameter diagnostics and transportation channels prototypes for ILC. Creation of the free electron laser on the base of photo-injector and linac LINAK-800. Development and testing of RF system elements of the linear accelerator. 3. Researches on possible creation of high-precise metrological laser complex with extended coordinate length up to 20 km. 4. Development and creation of cryogenic modules for the acceleration system of linac. Participation in creation of design documentation (work drawings) in ANSYS standard for manufacturing at ZANON (Milano) plant the first cryostat prototypes for ILC.

5. Preparation of design documentation on creation of hardware-software complex and facility for study of cryomodules, with the goal of further transition to production of documentation for mass cryostats fabrication and/or their element with refering to technologies and standard group of of the work performers. 6. Theoretical study of electron beam dynamics in transportation channels using software packages, calculation of electric and magnetic fields in accelerating structures, transportation systems and systems of e - /e + beam formation. 7. Preparation of the project of hardware-software complex for studies of radiation stability of superconductive materials using powerful , e, n beams 8. Engineering studies and design works with purpose of the study and preparing the possible hosting of ILC in the region near Dubna. 9. Development of the magnetic systems of ILC. Calculation on choosing parameters of electromagnetic elements for Damping Rings (DR). Development and creation of the magnetic systems on base of superconducting and warm electromagnets, also for constant magnet variant.

2. JINR in the ILC physics and detector R&D Studying problem and main goal of researches: The analysis of precision measurements in the framework of the Standard Model (SM). For this analysis a worldwide known tool, ZFITTER, has been developed by the group of D.Bardin from JINR. Beam energy measurement The R&D for the Luminosity Calorimeter with diamond sensors. The Hadron Calorimetry with very new and promising photo-detector SiPM Forward Tracking - the development of the reconstruction algorithms and detector optimization. Participating countries and international organizations Belarus, Germany, Italy, Russia, USA, Japan, CERN

LHE ground Machinery Hall # 2: Possible place for location of the Test Bench for experiments on superconducting RF cavities. Adv: Large hall, Power supply, Water supply, very close to systems for liquid Helium and other cryogenics

LNP ground Building 118 Location of constructed LINAC-800. Test of RF accelerator sections and cryo modules LINAC with super- conducting RF cavity (power,water,... LINAC-800 – first electron beam on

LNP ground Building 108 (LEPTA project) 2 experimental Halls (water, power, …) Test Bench for Photo Injector

Welcome to JINR (Dubna)

The materials of the talk of G.Shirkov at CALC-2006 were used.

Longitudinal Section EUROPEAN SAMPLE SITE - CERN

EUROPEAN SAMPLE SITE - DESY Longitudinal Section

ASIAN SAMPLE SITE Longitudinal Section

AMERICAS SAMPLE SITE Longitudinal Section