21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
2 October 2003Paul Dauncey1 Paris Summary Part 2 and Status of UK Electronics/DAQ Paul Dauncey Imperial College London, UK.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory14 September 2000LEB2000 Krakow The Front-End Driver Card for CMS Silicon Microstrip.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory17 October 2001 Clock Distribution Scheme LVDS.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 Delay FPGA I/O Clock40.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory21 October 2002 CMS Tracker FED Back End FPGA Frame_Sync_out0.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
25 Feb 2005Paul Dauncey1 TB Review: DAQ Paul Dauncey Imperial College London For Imperial, RAL, UCL.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob HalsallRutherford Appleton Laboratory19 July 2002 Electronic System Design Group CMS Tracker.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 CMS Tracker FED Firmware.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory18 July 2001 CMS Tracker FED CMS Tracker Two Weekly.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
CALICE Readout Board Front End FPGA
CMS EMU TRIGGER ELECTRONICS
Test Slab Status CALICE ECAL test slab: what is it all about?
CDR Project Summary and Issues
UK ECAL Hardware Status
ECAL electronics schedule
CALICE Readout Front End FPGA Development
Trigger issues for the CALICE beam test
FED Design and EMU-to-DAQ Test
Presentation transcript:

21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London

21 January 2003Paul Dauncey - UK Electronics2 UK electronics project (finally!) approved in Dec 2002 Full equipment request, but only for ECAL electronics Full manpower request for engineering effort from Rutherford Laboratory (RAL) New engineer (Adam Baird, RAL) has now joined the project RAL will also do layout and some testing Budgeted to use all money and effort by the end of Mar 2004 RAL people have experience of CMS tracker Significant knowledge of design of Front End Driver (FED) Readout board for CMS silicon tracker Architecture close to proposed CALICE board Will now use FED as a starting point for CALICE UK approval

21 January 2003Paul Dauncey - UK Electronics3 0V CMS Tracker FED Front End FPGA 12x Opto Rx PD Array 4x Prog Delay 1 Synch & Processing TTCrx VME QDR SSRAM 2 5V3.3V1.5V Dual ADC 3.3V Dual ADC 1 6 0V Front End FPGA 12x Opto Rx PD Array Synch & Processing 8 Dual ADC Dual ADC Readout & Synch Control ASIC FPGA Temp Sense Temp Sense 4x Prog Delay FPGA 1 3 4x Prog Delay FPGA 4x Prog Delay FPGA Temp Sense 3.3V 1.5V 5V -5V spare PD Boundary Scan System ACE E-Fuse Hot swap DC-DC Back End FPGA Temp Sense 12x trim dac Buffer Jumper Matrix Compact Flash VME64x Interface FPGA Test Connector SW Hot swap cycle Live extract request Config E2PRO M Vref DAQ TTS Spare 1.5V 3.3 V 5.0 V 2.5V -5.0V 2.5V Vref 1.5V Run/Halt VME Power Good LEDs extract Id E2 Prom FLT LEDs FSYNC Readout +12V LEDs +5V +3.3V FE 1 FE 8 EMU LEDs Process Transfer +2.5V LEDs +1.5V -5.0V halted LEDs Busy error TTC Over temp LEDs VME Clock Control Data Clock Control Data 8 3.3V1.5V

21 January 2003Paul Dauncey - UK Electronics4 Ideally, keep everything to the right, redo everything to the left Restricts readout board to same I/O and inter- FPGA paths as FED No major problems seen so far FED layout

21 January 2003Paul Dauncey - UK Electronics5 FED more complicated and hence expensive than previous design Keep cost within budget by increasing number of cables per board Previous design had 6 cables (= 6 VFE-PCBs) per board, new design has 16 Total number of boards for the ECAL drops from 15 to 6 Cost per board should be around £6k ~ 10k  Save on much of layout and some firmware design VME FPGA should be very close (if not identical); would like VME interrupts but not (yet) implemented Back end (BE) FPGA can reuse major parts of FED firmware Front end (FE) FPGA will need all new firmware BE FPGA much larger than needed Use spare logic for trigger handling; no need for separate board Trigger I/O and distribution via J0/J2 backplane unused pins Requires adding termination resistors for incoming LVDS, i.e. changing layout of back of board Implications of using FED

21 January 2003Paul Dauncey - UK Electronics6 Space for cable connectors, line drivers/receivers, ADCs, etc. restricted by position of FE FPGA Need to minimise the number of components here BE has 2  1MByte memories for event buffering With 16 cables, board event size = 16  6  18  2 = 3.5kBytes/event 2MBytes stores only around 500 events in each beam burst May need larger memories for CALICE; i.e. would require changing layout of back of board 9U front panel so can fit 16 high-density 68-pin SCSI connectors 38 pins needed; leaves 30 pins = 15 differential lines spare Connected directly to FE FPGA for use as LVDS Could use as I/O lines for digital HCAL readout For more details, see Implications of using FED (cont)

21 January 2003Paul Dauncey - UK Electronics7 ECAL assumed electronics schedule JFMAMJJASONDJFMAMJ Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production 9 boards Redesign Layout Fabrication and assembly Testing

21 January 2003Paul Dauncey - UK Electronics8 ECAL prototype test schedule When and where will prototype tests be done? ECAL final system schedule When and where is full readout electronics system needed? What sets this date and how firm is it? Will first use be beam, cosmics, calibration tests…? HCAL schedule When will analogue and digital options be ready? Will either or both options use UK readout? Is a prototype test needed for the analogue? When and where will prototype test be done for digital? Issues – CALICE schedule and plans

21 January 2003Paul Dauncey - UK Electronics9 Voltage levels still have some uncertainties Main problem would be negatively-shifted LVDS Needed for schematics – before end February Confirm connector choice Compatibility with cable and connector needed at VFE-PCB Needed for schematics – before end February Pin allocations within connector In principle, needed for schematics – before end February If desperate, could wire cables to swap pins later – before end May Cable specification Some cables required for VFE-PCB tests Need to be manufactured – before end May Prototype board testing with “semi-final” VFE-PCB Needed before redesign – before end November Issues – VFE-PCB interface

21 January 2003Paul Dauncey - UK Electronics10 Laboratory requirements; cable safety specification, etc. Needed for cable manufacture – before end May Define number of events needed per beam spill Affects size of onboard memory required Also needs event size estimate per board from HCAL if using UK boards Needed for schematics – before end February Cable lengths Distance between VME crate and ECAL/HCAL Needed for cable manufacture – before end May Trigger logic and distribution Allocation of I/O lines with termination resistors Needed for assembly– before end May Number of pins to be allocated on backplane for trigger fanout Needed for firmware design – before end May Issues – beam test details

21 January 2003Paul Dauncey - UK Electronics11 Analogue; is VFE-PCB interface compatible? For signal levels, cables, connectors Needed for schematics – before end February Number of boards required for manufacture – before end February 2004 Digital; interface specification Sufficient number of spare connector pins? Needed for schematics – before end February Digital; allocations of pins Have to mount termination resistors on correct lines Needed for assembly – before end April Digital; firmware development for spare pins UK unlikely to have manpower required Needed for digital HCAL tests – before end November Issues – HCAL plans