Universities Space Research Association Page 1 HAWC Optical and Photometric Specifications 27 July 2007.

Slides:



Advertisements
Similar presentations
Approved for public release; distribution is unlimited
Advertisements

Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
AMESim Fan Drive Thermal Model
© Copyright 2002 ABB. All rights reserved. - Microelectromechanical Systems for Process Analytics IFPAC 2003 Dr. Berthold Andres ABB Automation Products.
Universities Space Research Association Page 1 HAWC High-resolution Airborne Wideband Camera How Are We Coming along? Bob Pernic Project Manager Al Harper.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
EE580 – Solar Cells Todd J. Kaiser Lecture 10 Summary 1Montana State University: Solar Cells Lecture 10: Summary.
Ultimate Cold-Electron Bolometer with Strong Electrothermal Feedback Leonid Kuzmin Chalmers University of Technology Bolometer Group Björkliden
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
TES Bolometer Array with SQUID readout for Apex
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Radio Telescopes. Jansky’s Telescope Karl Jansky built a radio antenna in –Polarized array –Study lightning noise Detected noise that shifted 4.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
SLAC, May 12th, 2004J.L. Puget PLANCK J.L. Puget Institut d'Astrophysique Spatiale Orsay.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
BASIC CONSIDERATIONS IN DESIGN  The aim of the design is to completely obtain the dimensions of all the parts of the machine to furnish the data to the.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
Line Detection Rates for Next Generation IR/Submm Spectroscopic Surveys Eric J. Murphy BLISS/X-Spec Science teams.
In this section you will:
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
M. D. Niemack, et al., P03 A kilopixel array of TES bolometers for ACT: Development, Testing, and First Light Low Temperature Detectors 12, P03 July 26,
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
JRA3 STREGA - Introduction Geppo Cagnoli IGR – University of Glasgow ILIAS-GW Meeting, Orsay, 5 th -6 th Nov 2004.
Hall D Target Design Status Jim Fochtman- February 22, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Optical & Radiometric Conceptual Design of EMAS Thermal Port Upgrade Kickoff Meeting June 29, 2010 Roy W. Esplin.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
Schottky Barrier Diode One semiconductor region of the pn junction diode can be replaced by a non-ohmic rectifying metal contact.A Schottky.
Extended Detector Cutoff Considerations WFIRST Project Office May
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Demonstration of a Far-IR Detector for Space Imaging Principal Investigators: C. Darren Dowell (326), Jonas Zmuidzinas (Caltech) Co-Investigators: Peter.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
Original 1998 EOS Program Cal/Val Remote Sensing Instrument Suite.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
“Phase C” Design of the JWST/FGS Tunable Filter Imager TIPS/JIM June 15, 2006 Alex Fullerton STScI / UVic.
COB Integration and Test Nov. 15, 2010 Roy Esplin Mike Watson Monte Frandsen.
LHeC “shaking hands” meeting Comments on the Tracker Design I. Tsurin Page 1Liverpool December 16th, 2011 Detector granularity Sensor technology Frontend.
Increased Thermal Background for the post-NCS NICMOS TIPS – June 19, 2003 Megan Sosey NICMOS.
M. Gilchriese 1 Pixel R&D The useful lifetime of the innermost pixel layer is expected to be limited to a few years at design luminosity. However, there.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Thermal Energy & Heat.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Design and Fabrication
Thermal Energy & Heat.
Large bolometer arrays on radio telescopes.
Alexandr V. Gradoboev, Doctor of Technical Science, professor
iSHELL Design Review Cryostat & Optics Bench
iALMA WP4 – ALMA band 2 passive components
iALMA WP4 – ALMA band 2 passive components
Precision Oven Thermal Design
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Heat Transfer.
Optics Alan Title, HMI-LMSAL Lead,
THERMAL CONTROL SYSTEM
Presentation transcript:

Universities Space Research Association Page 1 HAWC Optical and Photometric Specifications 27 July 2007

Universities Space Research Association Page 2

Universities Space Research Association Page 3 Results from June 07 Lab Tests Observed per-pixel backgrounds from external radiation (as determined from iv curves) are 84% to 134% of predicted values for lab conditions (based on analysis of data from backplane QRST-- limited data from other backplanes are consistent with the comparable QRST data). Internal backgrounds are too high (comparable to those expected for SOFIA external backgrounds). Likely cause is high temperature of OMS structure (10-12K). We expect to be able to reduce this by increasing the thermal conductivities of the OMS structure and adding additional 4K baffling (need ~ 4-5 times reduction in power). Performance of 200mK baffle meets requirements. Background observed when baffle is covered by a mirror is less than or equal to 2-3 pW. Mechanisms work well, but position sensors need to be replaced with a more reliable, lower power system. Temperature rise caused by lens carousel and pupil carousel motors is relatively small. Thermal effect of PRL mechanism motor is more significant, but not mission critical. Substitution of motors with superconducting windings is expected to reduce the effects to negligible levels. Time for JFET drawers to reach operating temperature is ~20-30 minutes. Increasing the current capacity for the circuits driving the heater resistors is expected to ameliorate the problem. Can probably do this without risk to bridge chips.

Universities Space Research Association Page 4 Optics Modifications for Polarimetery Current HAWC optics can accommodate 32x32 pixel detector out to the longest wavelength of 216 microns. A larger detector could be accommodated in the short-wavelength bands. The diameter of the pupil carousel can be increased by several inches if the mechanism is driven by a spur gear rather than a geneva mechanism. If the maximum thickness of half- wave-plate rotating mechanisms is less than about 1.25 inches, they could fit within the currently available space within the OMS. Fabrication of a new pupil plate (the sky-side bulkhead of the OMS system) would minimize the down-time for a conversion. Dual detectors can fit within the current volume between OMS and helium cold plate if we use TES detectors rather than ion-implanted silicon detectors (the size reduction results primarily from substitution of multiplexed SQUID readouts for JFETS). Upgrading to polarimetry can be accomplished in stages. For example: installation of cold half-wave plates, installation of a larger TES detector, installation of dual TES detectors. The time to implement stage one would be limited only by the time to fabricate the mechanisms (and available funding). Possibly of order one year for fabrication and component testing and 3-6 months for integration and testing within HAWC (?). Time scale for detectors is probably somewhat longer (2-3 years ?).