E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.

Slides:



Advertisements
Similar presentations
Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
Advertisements

A Proposal of a Polarized 3 He ++ Ion Source with Penning Ionizer for JINR N.N. Agapov, Yu.N. Filatov, V.V. Fimushkin, L.V. Kutuzova, V.A. Mikhailov, Yu.A.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
Components of Initial Eprobe Startup Electron Gun –turning on beam, setting beam current, acceleration, saturation level Focusing lenses –Permit focussed.
Preinjector Group Collider-Accelerator Department
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
05/20/ High-Current Polarized Source Developments Evgeni Tsentalovich MIT.
Plasma Dynamics Lab HIBP Abstract Measurements of the radial equilibrium potential profiles have been successfully obtained with a Heavy Ion Beam Probe.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Proposed injection of polarized He3+ ions into EBIS trap with slanted electrostatic mirror* A.Pikin, A. Zelenski, A. Kponou, J. Alessi, E. Beebe, K. Prelec,
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
New Progress of High Current Gasdynamic Ion Source
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Photocathode 1.5 (1, 3.5) cell superconducting RF gun with electric and magnetic RF focusing Transversal normalized rms emittance (no thermal emittance)
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
October 4-5, Electron Lens Overall Design Alexander Pikin October 4, 2010 Electron Lens.
Brookhaven EBIS program: operation and development
J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.
F Project X Overview Dave McGinnis October 12, 2007.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Beam diagnostics in the beamlines
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Slide 1 Dynamic Electron Injection for Improved.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
IPM EM Simulations 9 th DITANET Topical Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators April.
RF source, volume and caesiated extraction simulations (e-dump)
B. Azadegan, S. A. Mahdipour Hakim Sabzevari University
Developments of the FETS Ion Source Scott Lawrie.
September 19-20, 2007 E. Beebe EBIS & LEBT Tests Edward Beebe September 19-20, 2007 DOE Annual Review.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Low-contamination Rare and Exotic Beams (at CARIBU) Sergey Kondrashev October 16, 2012.
Studies on 2.45 GHz microwave ion sources Abhishek Nag IISER, KOLKATA Presented By: G.O. Rodrigues IUAC, New Delhi Supervised By:
RF System and EBIS of RAON
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
H - Ion Source Development at FNAL Alejandro Garcia Sosa Proton Accelerators for Science and Innovation Workshop Nov
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
REXEBIS In the Electron Beam Ion Source (EBIS) the 1+ ions are charge bred. The positive ions are trapped in an electron beam which knocks out electrons.
NICA injection complex status
Beam dynamics simulation with 3D Field map for FCC RF gun
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Adriana Rossi, Sergey Sadovich
Junji Urakawa (KEK) for ATF International Collaboration
R. Suleiman and M. Poelker October 12, 2018
Advanced Research Electron Accelerator Laboratory
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
(Beam) Commissioning Plan
Proposal for a CESR Damping Ring Test Facility
Plans for future electron cooling needs PS BD/AC
Improvement of a dc-to-pulse conversion efficiency of FRAC
Presentation transcript:

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator Department

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 Linac-based Preinjector - Source “requirements” 1.Intensity for 1.2 x 10 9 Au ions/bunch in RHIC : ~ 3.4 x 10 9 Au 32+ ions/pulse from the source 2. No stripping before Booster injection : q/m > 0.16 (Au 32+, Si 14+, Fe 21+ ) turn injection into Booster : pulse width  s (Note - 1 & 3 result in a Au 32+ current of mA) 4. Rep rate : ~ 5 Hz 5. Emittance :  0.2  mm mrad, normalized, rms (for low loss at Booster injection)

Test EBIS -  1/2 length prototype, but with the full power electron beam EBIS Test Stand (prototype)

Test EBIS

Test EBIS - showing ion injection arm and extraction to Time-of-Flight Spectrometer Non-destructive current measure of injected and extracted beams can be made on current transformer. Low resolution in-line TOF (between ion beam chopper and FC2) High resolution TOF in energy focusing Mamyrin spectrometer Ion injection arm

Some Principles for a Reliable, Low Maintenance EBIS The basic principle that has been followed is to separate the functions of source components and remove as much of the action as possible from the high vacuum ionization region. Provide beam current loss monitoring on all elements in beam path Avoid magnetic shims and shields where possible; allow for external corrections or reshaping of magnetic geometry External ion injection: EBIS acts as a charge state multiplier, low contamination, high reliability

Test EBIS performance represents more than an order of magnitude improvement over past EBIS sources. At the same time, operation has been very reproducible and stable. Some of the key features, almost all of which are unique to this EBIS, are the following: A novel electron gun design from Novosibirsk. Convex LaB 6 & IrCe cathodes A warm bore, unshielded superconducting solenoid for the main trap region Careful vacuum separation of the trap region from the electron gun and electron collector regions Large bore (31mm) drift tubes have been used (pumping, reduced alignment precision, fast extraction, reduced RF coupling) The use of auxiliary (warm) solenoids & many transverse magnet coils for steering corrections The electron beam is pulsed to reduce the average power on the electron collector Very versatile controls allow one to easily apply a time dependent potential distribution to the ion trap Design Choices for a Reliable, Low Maintenance EBIS 2

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 E-Gun Chamber and Cathode Unit Electron Gun chamber with gate valve installed at Test EBIS Electron gun cathode unit with LaB6 cathode is shown above.

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 Electron Collector and Vacuum Housing View from ion extractor end (extractor not installed)

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 Drift Electrode Structure of the Test EBIS Ionization Region Close-up of electrical leads (right). Drift electrode structure spans the length of the central vacuum chamber within theTest EBIS Superconducting Solenoid bore (above).

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 Low Energy Vacuum Arc Source (LEVA) Hollow Cathode Ion Source (HCIS) External Sources used for Primary Ion Injection at the Test EBIS

Gun and E-beams 2

IrCe Gun, Gate Valve, and Anode Modification Cathode replacement and electron gun upgrades without disturbing ionization volume ultra-high vacuum. Anode/Drift Tube geometry eliminates need for an additional auxiliary solenoid Electron beams up to 10A, 100kW have been propagated with very low loss, using IrCe Cathodes from BINP, Novosibirsk. 10 A electron gun with IrCe cathode meets the RHIC EBIS requirements, with an estimated lifetime of >20,000 hours

Gold injection From Leva Top trace: Extracted current without ion injection Middle trace: Extracted current after Gold injection from LEVA source Bottom trace: integrated charge (13.3nC) extracted from EBIS 2ms after gold injection from LEVA

5.5 x charges/pulse are required for RHIC. By doubling the EBIS trap length to 1.5 m, we will exceed this requirement. (The ion yield has been shown to scale linearly with trap length). Time-of-flight spectrum peaked at Au 34+ Results from Test EBIS ( ½ Length of RHIC EBIS)

Comparison of experimental and predicted ionization time of Au (jT) Theory = =19.95 Experiment: Au34+ produced in 50ms, with 7.2A, 20.5keV e-beam For Test EBIS, 10A e-beam j 10A ~575 A/cm 2 Then J 8A ~0.72*575=414A/cm 2 T Theory =( jT) Theory /J 8A =0.048sec So the experimental production of Au34+ with a 50 ms confinement period is in good agreement with the 48ms predicted time. This means that the Au ions are confined well in the EBIS electron beam. Computer calculation of successive ionization of Au with a 20keV electron beam:

Excellent ion yields from the trap, with very high beam neutralization efficiencies have been achieved 5.5 x charges/pulse are required for RHIC, from a trap length of 1.5 m, and assuming operation at 10 A electron current. (The ion yield has been shown to scale linearly with trap length and electron current). Extraction of ions from the EBIS trap The design goal of the Test EBIS is that 50% of the electron beam charge be neutralized by the ion species of interest (e.g. gold ions).

Au32+ Pulsed Ion Currents By manipulation of the EBIS trap electrodes (Fast extraction), the EBIS extracted charge can be delivered in pulse widths necessary to meet single to multi-turn injection requirements of the synchrotron. *(Typical extraction pulse widths without fast extraction)

Fast Extraction of Ions from the EBTS

Inline Time-of-Flight Full ion beam sampled and collected on Faraday Cup I e = 7A; 10 ms confinement Au = 83%; C&O = 15%; H = 2%

Emittance of a 1.7 mA extracted beam from EBIS, with Au injection.  (n, rms)= 0.1  mm mrad. All charge states, peaked around Au 25+. Measured Emittance for a 1.7mA Gold Beam The emittance of light ions from EBIS is expected to be less due to less heating by the electron beam during relatively short confinement times necessary to reach charge states of interest.

Experimental conditions: I el =7.5 A, L short =71 cm, L long =107 cm, B trap =4.6 T, B min =0.19 T Geometry of EBTS electro-optical system (top) and axial magnet field distribution with simulated radial profile of electron beam (bottom). Ion output vs Ion Trap Length

Time evolution of the total extracted ion charge (nC) with Au injection for the long trap (solid line) and short trap (dashed line). a b Charge state spectra of ions extracted from the long (a) and short (b) traps after confinement time 2.5 ms for = 7.5 A. Cursor for both cases is on Au 19+. The capacity of ion trap is proportional to the length of the trap (as typically observed in any EBIS ). The loss of ionization factor for a long trap, as observed in the spectra, is due to very low magnetic field on the peripheral parts of the long trap and will be avoided in the RHIC EBIS by maintaining the full field throughout the trap. The ion intensity is expected to double with the doubled trap length in the RHIC EBIS.

Hollow Cathode Ion Source at Test EBIS Cu +1 >25  A, Ne >80  A P EBIS ~2x mb for P HCIS ~1mb, 10ms, 1Hz shutter operation P~4x mb P~4x mb P~8x mb P~0.8mB

Electronically Controlled Shutters Electronically controlled shutters are used to help provide differential pumping in the ion injection beam line. (25mm aperture, 6ms minimum open time)

The controller coordinates the application of all time dependent voltages and timing references associated with EBIS operation with a time resolution of 1  s, such as: Time dependent ion trap HV Electron beam ramping Table Driven Beamline Optics for Ion injection from Multiple sources and EBIS ion beam extraction EBIS Voltage and Timing Controller

Multiple Ion Species (PPM) The EBIS highly charged ion beam species and charge state can be selected on a pulse to pulse basis Voltage Controller is hardware configured for 3 independent cycles with a repetition factor of up to 15 each Software presently allows for use 16 independent beamline optics tables for selecting injection from various external sources or EBIS beam propagation to various diagnostic devices (RFQ, TOF, emittance analysis, etc).

Test of unregulated electron collector supply In the normal Test EBIS setup, a highly regulated supply provides both electron collection and cathode biasing functions. A test was performed to test the feasibility of using separate collector and cathode biasing (accelerator) supplies: An unregulated, high current supply for electron beam collection A low current regulated supply to provide: 1) stable e-beam launch 2) Independent acceleration voltage 3) Electron beam fault protection Results using a 50  F Capacitor as a Collector Supply: 4A electron beam, 50ms pulse: droop ~3.7kV from nominal 10kV good e-beam propagation Lower Cost Unregulated Collector Supply can be used in RHIC EBIS (Ion Injection and extraction will be locked to repetitive waveform to minimize optical effects) Experimental Test & Rhic EBIS Configuration Normal Test EBIS Configuration

EBIS Results and Rhic design Parameters * Estimated result for data with 8A e-beam

Summary

E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 Ions are extracted from an EBIS in pulses of constant charge; one has control over the pulse width