Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
Raising the Standard for Improved Flood Risk Management in the Midwest Raising the Standard for Improved Flood Risk Management in the Midwest Interagency.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
1 San Joaquin River Exchange Contractors Water Authority WEF- Central Valley Tour April 23, 2014 Mission Statement : To effectively protect the Exchange.
Upper West Branch Rocky River Watershed Balanced Growth Plan.
March SRSRB Meeting.  The purpose of this discussion is to provide early feedback to project sponsors  Five Application Submitted 1. South Touchet RM.
Florida Water Forum Everglades Restoration June 3, 2011.
Project Collaboration In 1999, as a result of several years of monitoring of neotropical migratory birds such as the willow flycatcher, Jim Steele from.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
South Llano River: One of 2011’sTop Ten National Fish Habitat Action Plan named SLR as “water to watch” WHY?? –Conserve freshwater, estuarine, and marine.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
Utah’s Blue Ribbon Fisheries An overview Craig Walker Special Projects Coordinator Utah Division of Wildlife Resources.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
SIMPSON FARM BY: KHUSHARTINI KAMARULZAMAN ANAHI BOJORQUEZ.
Amy Sheldon Watershed Coordinator February 3, 2004.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
1 Three Rivers Levee Improvement Authority April 21, 2006 Presentation to the State Reclamation Board Regarding Satisfaction of Permit Special Condition.
Unimpaired connectivity between active channel and floodplain Eliminated connectivity between active channel and floodplain Impaired connectivity between.
COUNTY of YUBA HISTORY OF DISASTERS. Birth of the County  1851 – Marysville, Gateway to Gold, founded  1852 – Marysville becomes third largest city.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Roxanne Johnson Extension Water Quality Associate February 24, 2009 Tile Drainage Forum NDSU.
Spokane River Riparian Enhancement Project at State Line.
FEMA FLOOD INSURANCE STUDY UPDATES City Council Workshop July 7, 2008.
Overview Presentation for FMA 2007 NATOMAS INTERIOR LEVEE PROTECTION PLAN (NILPP)
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
TRLIA ROW Update Bob Morrison TRLIA ROW Manager Reclamation Board Sub-Committee Meeting September 11, 2007.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Chagrin River Watershed Partners, Inc. Chagrin River Balanced Growth Plan Amy Brennan (440) , Newbury Township.
Mr. Reed for Mrs. Whetstone’s Class October 22,2009.
Yuba County Comprehensive Flood Protection Program
Watershed Restoration Overview for the Klamath Basin.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Alliance for a Healthy South Sound March 25, 2015.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Transportation Projects City Council Workshop May 14, 2013.
Central Valley Flood Protection Board Meeting – Agenda Item No. 8A Informational Briefing Presented By Board Staff and CH2MHill Consultants Model Funded.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Green Infrastructure at Butterworth Landfill Tom Bloom, EPA Region 5 and Jay Steffen, Grand Rapids, MI.
Janes Creek and McDaniel Slough Past, Present, and Future.
Water and Wastewater Infrastructure Project Financing 1.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Adapting to Climate Change: Using the Green to Beat the Blues Roberta Clowater Executive Director Canadian Parks and Wilderness Society - New Brunswick.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Sustainable Management in the Lower American River
Three Rivers Levee Improvement Authority June 8, 2007
Presented By: Fran Borcalli, P.E. Program Manager
flooding and housing buyouts in onion creek
Constructive and Destructive Forces Review
Sacramento Environmental Commission January 2019.
K Street, Sacramento – 1861/1862 Flood
Presentation transcript:

Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007

What is TRLIA? A Joint Powers Agency comprised of Yuba County and Reclamation District 784 –Created in 2004 to aggressively focus on Flood control improvements in southern Yuba County –Unique Relationship with Development Community –Governed by TRLIA Five Member Board Goals –Achieving at least a 200 year level of flood protection for south Yuba County –Complete the remaining major flood protection elements by 2008 Web site:

Project Overview Accelerated Flood Control Improvements –Goal: Complete by late 2008 –Four phased program underway – 29 miles Approximately 50% done Remaining work to be done in 2007 and 2008 –$133 Million spent to date $78 Million Local Funding $55 Million State Funding –Over $200 Million for remaining work Feather River Setback drives high cost Potential Proposition 1E or 84 funding

Phase 1 (red): Yuba Phase 2 (green): Yuba, Western Pacific Interceptor Canal, and Bear Phase 3 (purple): Bear Setback Phase 4 (blue): Yuba, and Feather River TRLIA Levee Work by Phase

Bear River Setback

Bear River 639 acres of new riparian and upland habitats

Feather Setback Benefits Superior flood protection for South Yuba County –Built to current engineering standards –Built with suitable soils (current levee soil is too sandy) –Removes river choke point and widens floodway –Built away from old river channels –Eliminates significant erosion sites Regional flood protection benefits for south Yuba County and surrounding communities –Widens flood way and lowers water surface levels (1.5 ft for Marysville and Yuba City) –No downstream impacts due to regulated flows Creates up to 1550 acres of habitat for restoration or mitigation banking

Flood Plain Management FEMA Levee Certification Underway TRLIA/Yuba County Interface

Questions