Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,

Slides:



Advertisements
Similar presentations
Regulatory Framework and Emerging Issues Mahesh Vipradas.
Advertisements

By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Non renewable Renewable Pancha Bhoothas SKYWATERLANDFIREAIR.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Bandula S. Tilakasena Project Director Trincomalee Coal Power Project Ceylon Electricity Board 21 October, 2007 Pricing policy for renewable energy: Avoided.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
ARR/TARIFF PROPOSALS OF DISCOMS FOR FY Suggestions/objections by K.Raghu 01/03/2005.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
ABPS Infrastructure Advisory Private Limited REC Mechanism in Himachal Pradesh Utility Perspective Ajit Pandit Director, ABPS Infrastructure.
Harnessing Renewable Energy & Solar Mission of Indian Railways.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
Karnataka Renewable Energy Development Limited
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Role of Electricity Regulatory Commissions By S C Shrivastava Joint Chief (Engg) Central Electricity Regulatory Commission.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Merchant / Captive Power Post Electricity Act 2003 By Sh. M.D. Mundhra Malana Power Company Limited LNJ Bhilwara Group 15 th October 2003 CII – PTC Conference.
The World Bank Group Ashish Khanna India Energy Team Leader South Asia Sustainable Development.
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Total Installed Capacity (as on ) Renewable contributes 5-6% of total Electricity Generation Source: Central Electricity Authority 2.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Renewables and System Services Ann Scully.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Wind Energy an Introduction Fastest Growing Energy in the World wind power has the potential to produce 72 Terawatts,5 times more energy than the world.
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
1 11-SOCIAL MARKETING. ACUTE POWER SHORTAGE IN INDIA, WITH PARTICULAR REFERENCE TO MAHARASHTRA & MUMBAI.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
1/6/ Renewables Energy Sources - Regulatory perspective Presentation by Prashant Chaturvedi Secretary, MPERC.
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
Legal, Regulatory and Financial Incentive Framework to Support Landfill Gas Power Generation Project Development Presented by Leiping Wang Senior Energy.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
RENEWABLE ENERGY POTENTIAL IN INDIA
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
Philippine Feed-In Tariff System Implementation 1.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
1 Märt Ots Energy Market Inspectorate 4 th Baltic Electricity Market Mini-Forum Riga Latest developments in Estonia.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Southern Regional Power Committee Central Electricity Authority.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Operationalizing One Nation One Grid
Open Access.
Target Clients Renewable Energy Generators in India
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Distribution Utility Meet (DUM 2017)
Harnessing Renewable Energy Solar Mission of Indian Railways
March, 30 – April 3, 2009, Honolulu, Hawaii
bihar electricity regulatory commission
Presentation transcript:

Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall, from time to time, prepare the national electricity policy and tariff policy, in consultation with the State Governments and the Authority for development of the power system based on optimal utilisation of resources such as coal, natural gas, nuclear substances or materials, hydro and renewable sources of energy.

EXTRACTS FROM TARIFF POLICY Para 6.3 Harnessing Captive Generation Captive generation is an important means to making competitive power available. Appropriate Commission should create an enabling environment that encourages captive power plants to be connected to the grid. Such captive plants could inject surplus power into the grid subject to the same regulation as applicable to generating companies. The prices should be differentiated for peak and off-peak supply and the tariff should include variable cost of generation at actual levels and reasonable compensation for capacity charges. Alternatively, a frequency based real time mechanism can be used and the captive generators can be allowed to inject into the grid under the ABT mechanism. Options for Renewable/ Captive/ IPPs etc.

EXTRACTS FROM TARIFF POLICY Para 6.4 : Non-conventional sources of energy generation Pursuant to provisions of Section 86(1)(e) of the Act, the Appropriate Commission shall fix a minimum percentage for purchase of energy from such sources taking in to account availability of such resources in the region and its impact on retail tariffs. Para 6.4 contd… It will take some time before non-conventional technologies can compete with conventional sources in terms of cost of electricity. Therefore, procurement by distribution companies shall be done at preferential tariffs determined by the appropriate commission. Options for Renewable/ Captive/ IPPs etc.

Non Conventional Energy Sources POSSIBLE OPTIONS FOR SALE OF ENERGY: - Short Term Open Access - Unscheduled Interchange(UI) - Through Tariff determined by Regulator

ISSUES OF IMPORTANCE IN CASE OF NON- CONVENTIONAL (Renewable) ENERGY SOURCES - FAVOURED ACCESS / WHEELING CHARGES - POSSIBILITY OF BANKING - EXEMPTION FROM MERIT ORDER - MUST RUN STATUS - ENABLING TARIFF BY STATE COMMISSIONS POSSIBLY SIMILAR TREATMENT IS TO BE MOOTED TO SUCH OTHER RENEWABLE SOURCES VIZ. MINI / MICRO HYDEL ETC. ESC TO EXIT

SALE OF NON CONVENTIONAL ENERGY THROUGH STOA: - CAN NOT BE DISPATCHED/ REGULATED ON A REAL TIME BASIS; - AVAILABLE ON SEASONAL BASIS; - TO BE TAPPED WHENEVER AVAILABLE - APPLICATION OF ACCESS CHARGES (Access Charges could very from %) HENCE POSSIBILITY OF SELLING N.C. ENERGY THROUGH STOA IS NOT VERY ENCOURAGING.

SALE OF WIND ENERGY THROUGH UI - CANNOT REGULATE THE GENERATION DEPENDING ON FREQUENCY AVG. UI RATE COMES IN THE RANGE OF AROUND Rs – 3.00 Per unit HENCE POSSIBILITY OF SELLING THROUGH UI MAY NOT BE ENCOURAGING ALL THE TIME DETAILS

YEARAVG.UNIT RATE(RS.) EXTRACTS FROM APERC ORDERS IN THE MATTER OF DETERMINATION OF TARIFF IN RESPECT OF RENEWABLE SOURCES OF ENERGY.

EXTRACTS FROM KERC ORDER DATED 18 TH JAN 2005 IN THE MATTER OF DETERMINATION OF TARIFF IN RESPECT OF RENEWABLE SOURCES OF ENERGY. TYPEUNIT RATE(RS.) MINI HYDEL PROJECTS (10 YEAR PERIOD)2.80 WIND PROJECTS (10 YEAR PERIOD)3.40 CO-GENERATION PROJECTS (1 ST YEAR AND 2% PER ANNUM ESCALATION FOR NEXT 9 YEARS) 2.80 BIO MASS PROJECTS (1 ST YEAR AND 2% PER ANNUM ESCALATION FOR NEXT 9 YEARS) 2.85

GENERATOR STU DISCOM 2 CONSUMER DISCOM 1 ACCESS CHARGES UNDER STOA CASE 1 WHEN BOTH GENERATOR AND CONSUMER ARE EMBEDDED CUSTOMER OF DISCOMS

GENERATOR STU DISCOM 2 CONSUMER ACCESS CHARGES UNDER STOA CASE 2 WHEN ONLY CONSUMER IS EMBEDDED CUSTOMER OF DISCOM

GENERATOR STU CONSUMER ACCESS CHARGES UNDER STOA CASE 3 WHEN BOTH GENERATOR AND CONSUMER ARE DIRECTY CONNECTED TO STU

CAPACITY BREAKUP OF WIND INSTALLATIONS Tamil Nadu –2036 MW Karnataka – MW Andhra MW Gujarat – Rajasthan Maharashtra – MW M.P MW Kerala –2 MW W.Bengal – 1.1. MW

EXTRACS FROM ELECTRICITY ACT 2003 Section 86(1)(e) State Commission shall promote congenration & generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licence. Renewable Sources of Energy