Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.

Slides:



Advertisements
Similar presentations
F&T Inc. OVERHEAD CRANE SAFETY.
Advertisements

My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Electrical Safety.
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Pipe Supports and Hangers
Safely Using Drill Collar Clamps
Electrical Fire Safety Fire Prevention Week 2012 Electrical Safety Foundation International.
Electrical Safety 29 CFR I. Background for the Trainer:
Last revised March 19, 2015 Electrical Department – EQUAL CODE: EL304 Care, Use, and Maintenance of Rubber Insulating Gloves.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Proper Use of Extension Cords Proper Use and Electrical Hazard Awareness for Extension Cord Users Module 2.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Crane and Hoist Training
DHHB, 1ID MAINTENANCE Effects of Cold on Military Vehicles.
Managing Multimedia Equipment 一般電子科技空間使用安全原則 科技設備操作須知.
©2004 Fluke Corporation Insulation Resistance Testing 1 Insulation Resistance Testing.
Electrical Safety 29 CFR Concerned About Electricity? How many sets of Christmas lights do you plug into one extension cord? Do you still use.
Power/Hand Tools Valley City State University | Facilities Services | OSHA Office of Training & Education.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
ELECTRICAL HAZARDS Electricity is an essential of modern life Some work directly with electricity (Engineers, circuit assemblers) Some work indirectly.
Starter System Service Chapter 33 Page 439. Service Begins with Checking System Check the battery first –Voltage should be 12.6 and while the starter.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Tools – Hand and Power.
Rotork PM Inspection Continuing NMV-83. IT’S OUR RESPONSIBILITY! NUCLEAR SAFETY INDUSTRIAL SAFETY RADIOLOGICAL SAFETY SAFETY CULTURE.
Electrical Safety.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
Electricity. Electricity Electric shock happens when a person becomes part of an electrical circuit and the current flows through their body. When an.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
1a.  Exposed part  Live or energized part  De-energized part 1a.
Electrical Safety. Definitions v Exposed part v Live or energized part v De-energized part 1a.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Proper Use of Extension Cords
BACKGROUND NSTM 300 was completely re-written to clarify and update requirements for today’s increasingly complex shipboard electrical systems. The enclosed.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
Electrical Principles and Wiring Materials
Classroom Module 2 Engineering Exam Guide pg. 10.
Troubleshooting Electrical Circuits This lesson came from Virginia Tech and has not been edited by the Georgia Curriculum Office.
Electric Bike’s Maintenance Tips to Ensure Better Performance.
Disclaimer: As a committee of a national organization, the Safety, Health & Environmental Committee of NPCA must reference federal standards. However,
Georgia Tech Safety and Health Consultation Program
GSE Maintenance Training Operating Instructions
“Success in Safety”.
Who is Responsible for Overhead Crane and Hoist Operations
TURBINE CRANES NEA36 Turbine Crane.
Conveyors.
Crane safety and inspections
SAFE WORK INSTRUCTIONS
The Basics of Overhead Crane Pre-op Inspections
Personal Protective Equipment
SAFE WORK INSTRUCTIONS
Electrical Safety.
Crane safety and inspections
Cranes.
F&T Inc. OVERHEAD CRANE SAFETY.
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
C 4 Insulator Changeout With Hoists
Electricity Module 13.
C3 Insulator Changeout With Jib
Crane safety and inspections
Crane safety and inspections
2008 Code Drills Health Care Facilities
Cranes and Hoists Standard 29 CFR Part
Effects of Cold on Military Vehicles
Presentation transcript:

Turbine Crane CRANES TURBINE NEA39

Turbine Crane PLANT STATUS! PV Daily Status Report

Turbine Crane

Walk downs Review instructions to ensure workable and adequate Right Parts/materials/tools Permits Relevant Operating Experience Turbine Crane

Pre Job Briefs Understand the Task Critical Steps identified and OE used AND what actions are being taken in reference to these two areas Two Minute Drills: Hazards identified AND what are actions are you taking Turbine Crane

Procedure Use & Adherence WO / procedure in hand & latest revision Place keepers being used Sign steps as you go Follow & understand steps - STOP if can't or don't Turbine Crane

TURBINE CRANE Terminal Objective Given references provided by the Instructor, the Plant Electrician will maintain Turbine Building Cranes as demonstrated by achieving a minimum of 80% on a written examination. Turbine Crane

Multi Stud Tensioner.

PRE-JOB BRIEF Identify Critical Steps Identify Error Precursors Worst thing that can happen Error prevention defenses to be used Actions to assure proper configuration control Turbine Crane

TURBINE CRANE EO 1.8 Describe the Corrective and Preventive maintenance performed on the Turbine Building Crane.

Preventative Maintenance Visual Crane Inspections – Check collectors and shoes for wear. – Visually check insulators for cracks. – Inspect all lighting fixtures, on the crane to insure all are illuminated and that the lighting in the cab, and that all electrical outlets (receptacles) are functional and grounded. – Inspect all the flat festoon cables for degradation and or damage. Insure cables are being properly supported and there is proper clearance between the structure and the cables so the do not make any contact to wear or rub the jacket. Turbine Crane

Preventative Maintenance Visual Crane Inspections – Inspect the control cab conduit for proper installation and are properly supported, outlet receptacles are functional, status lights and all crane rail lights to insure they illuminate are in a working condition. – Worker Verification: In Panels 4, 3, 2, & 1, ensure all fuses are the correct size, for the various components, and there are no signs of damage or degradation to the fuse blocks. – Inspect the Cranes safety Horn wiring, switches and contacts on the control panel in the cab for degradation. Turbine Crane

Preventative Maintenance PLC Battery Replacement: – Replace the back-up battery (s) in SLC Processor (S). Catalog Number 1747-BA, Every Re-fuel cycle. – Note: Processors have a capacitor that provides at least 30 minutes of battery back-up while the battery is disconnected. Data in RAM is not lost if the battery is replaced within 30 minutes. Turbine Crane

Preventative Maintenance Motor Inspection and testing: – Main Hoist Motor – Aux Hoist Motor – Main Trolley Motor – North/South Bridge Crane Turbine Crane

Preventative Maintenance Motor Inspection and testing: Inspect the motors for dust, dirt, signs of oil and grease and any other contaminates or degradation Inspect the Motor & Brake Heaters for damage or degradation Inspect all electrical conduit, flex, for proper installation and that there is no broken or degraded flex Inspect the break enclosure and verify that it is clean, free of dust, dirt and any contamination that will interfere with the safe operation of the crane Turbine Crane

Preventative Maintenance Motor Inspection and testing: – Main and Aux Hoist Geared Limit Switches Inspect the flex conduit for damage and degradation – North and South Bridge Crane Inspect the limit switches conduit and flex for damage or degradation that will interfere with the safe operation of the crane. Turbine Crane