April 28, 2015 City Council Workshop
City Council Goal 1 Expansion Objective: To enhance infrastructure in order to maintain quality neighborhoods and business district Strategy: Projects targeted as highest priority for replacement shall be evaluated for potential upgrade or enhancement Measurement: Provide City Council with a presentation of the existing PEP tank replacement program
City PEP System PEP system designed by ITT in the early 1970’s as an alternative to the installation of a conventional gravity sewer system in certain areas of the City 12,825 active PEP tanks and the count is growing every week
PEP Tank Failures
Why do PEP Systems Fail?
PEP Tank Failures vs. Rainfall
New PEP Tank Installations = 7,197 Multiple Sub-Contractor Installations
0.50% 0.79% 0.58% 0.67% 0.36% Annualized Failure Rate182 Tanks Replaced from FY2013 – Q2 FY2015
Potential Causes of PEP Tank Failures Record Setting Growth in Palm Coast from 2003 through 2006 Underground Utility Sub-Contractor PEP Tank Installations Work Site Conditions and Environment Insufficient Staff for Workload and Inspections of PEP Tank Installations
Solution and Future Plan of Action Upgrade to Continuous H20 Load Rated PEP Tanks Continue to Perform Installations and Replacements with City Staff, if Possible Monitor Growth and Replacements to Ensure Adequate Staffing Level for both Installation and Inspections Ensure Appropriate Budget to Maintain Program
Water and Wastewater Utility Capital Improvement Plan PEP Tank Installations *Based on 2014 Wastewater Management System Facilities Plan for Growth Inside City Limits with 20% Requiring PEP Tank Installation **Based on Replacement Trends over Last 8 Years Year New Tanks* Replacement Tanks** Current CIPForecasted $600,000$629, $850,000$641, $900,000$665, $950,000$815, $1,050,000$1,095,000 Total $4,350,000$3,845,000