Module 3B How to Apply for an Individual APDES Permit.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.
Session 7 Outline What needs to be tracked or collected? Whats available to aid with program tracking/reporting? Does data collection format make a difference?
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Improving Water Quality: Controlling Point and Nonpoint Sources Chapter 15 © 2004 Thomson Learning/South-Western.
Indiana Department of Environmental Management
Module 6 Effluent Monitoring and Receiving Water Monitoring.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Module 4B Grinder & Waste Conveyance Inspections/Sampling.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
National Pollutant Discharge Elimination System -NPDES Permit Process-
North Carolina Child Care Licensing 2.01 Notes. Critical Questions Journal Question: Why does NC require licensing of child care centers?
Module 4A Permitting Requirement for GP Post Authorization or IP Issuance.
Division of Housing & Community Development
56TH ANNUAL WATER AND WASTEWATER OPERATORS' CONFERENCE April 17, 2013 NetDMR Update Shawn Hokanson SWPB Permit Support Supervisor Cheryl Edwards SWPB NetDMR.
Create an eReimbursement From the Ariba home page, click Create  Reimbursement.
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
Module 7 Compliance Inspections and Other Issues.
Sustained Compliance Workshop - Anchorage, AK September 23-24, 2010 Eric Burg Kenai Peninsula & Southeast Alaska – Compliance & Monitoring Section DEC.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
1 Module 6 Effluent Monitoring and Receiving Water Monitoring Seattle, Washington April 24-25, 2012.
CENTRALIZED WASTE TREATMENT 40 CFR 437 Lessons Learned.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Certification & Engineering Bureau CB notification Inquiries & Issues Nicolas DesMarais Certification Officer Agent d’Homologation TCB Workshop – February.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Module 3C How to Apply for Coverage Under an APDES General Permit.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Blue Skies Delaware; Clean Air for Life Confidentiality Delaware Department of Natural Resources and Environmental Control Air Quality Management Section.
Module Review 1 & 2. According to the CWA, by what year where all pollutant discharges to navigable waters to cease? Module 1 Review 2.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
1 Leah Walker California Department of Health Services Division of Drinking Water and Environmental Management October 2001 DHS TurboSWAP Welcome to TurboSWAP,
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Non-Storm Water Discharge (NSD) (Dry Condition) Observation Inspection and Reporting.
Instructions and Reporting Requirements Module 7 Electronic Reporting For Facilities March 2014 North Carolina Central Cancer Registry State Center for.
Construction Site Best Management Practices and the Project Design Process.
Module 4C Sea Surface and Shoreline Monitoring. Module 4C – Sea Surface & Shoreline Monitoring Stephanie Mann Environmental Program Specialist III 2.
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Paul Novak, Ohio EPA. Committee Meetings/Agenda  March call of full committee  April meeting with IDEM, OEPA, ORSANCO on streamlined variance.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
NEW FOR 2009 Faster, Easier, Friendlier. Before you start Any student, staff, or faculty member can file an accident/incident report. Accident reporting.
Introduction to the Clean Water Act And Water Quality Regulation Tracy Hester Environmental Law Fall 2015 September 15, 2015.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
Test Your Storm Water Knowledge!
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Enforcement What to Expect From the Water Boards, and What to Look for Locally ENTS Workshop August Mark Bradley Office of Enforcement CA State.
1 US EPA Straw Proposals for Modifying the 12/2005 draft Policy Statement Jim Hanlon, Director Office of Wastewater Management, OW Expanded Steering Committee.
San Antonio Unified Development Code Group 17. Numbering and Referencing The numbering system is consistent with the system used throughout the City's.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Section Corner Identification in Madison County Presented by: Erin Dyer.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Review of Mixing Zone Studies Ben Cope EPA Region 10.
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
David Kurz, P.E. Lead Wastewater Engineer
Clinicaltrials.gov Update
Basic Web-based Emissions Inventory Reporting (Web-EI)
NC DPPEA Compliance Assistance - Water
Compliance Monitoring Activities State Inspections
EPA Region 10 Alternate Test Procedures and Method Update Rule
Residential Placement Application 2011
Sludge Removal Requirements
Multijurisdictional Agreements
Spencer Bohaboy Policy Development Specialist Water Quality Policy
Multi-Sector General Permit: MSGP
Module 1b – ICIS Permitted Features
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Presentation transcript:

Module 3B How to Apply for an Individual APDES Permit

Wes Harvey Environmental Program Specialist III Module 3B – Applying for an Individual APDES Permit 2

Identify DEC Seafood Processing Waste Web Page Resources Review the Individual Permit Applications Required Identify Common Errors and Omissions in Permit Applications Module 3B – OBJECTIVES 3

Where are Application Forms Located 4 DEC Seafood Application Portal

All Non-POTW Individual Permit Applications Require a Completed Form 1 Which Forms are Required? 5

Applications for an existing facility: An existing facility includes Existing Manufacturing, Commercial, Mining, and Silvicultural Operations APDES IP Form 2C- Existing Industrial Facilities Which Forms are Required? 6

Applications for a new source and new discharge: “New manufacturing, commercial, mining, or silvicultural discharge” APDES IP Form 2D- New Source New Industrial Discharge Which Forms are Required? 7

If your discharges do not meet State WQS at the End of Pipe: Complete an APDES Form 2M- Mixing Zone Application Which Forms are Required? 8

Application Forms and Data are subject to public review and can be provided to the public Business Confidential Information must be specified for special handling by the DEC. Status of Information Provided 9

Specified information will be treated confidential if it satisfies 40 CFR § and is not otherwise required to be public by state law. Two test for compliance: A.No statute specifically requires disclosure, and: B.Disclosure will cause substantial harm to the business competitive position Each page must be stamped business confidential Business Confidential Information 10

Name and address of permit application or facility Permit Application Permit effluent data Information required by an APDES or NPDES form on the form itself or any attachment to satisfy a form requirement Not limited to this list Examples of Information Not Business Confidential 11

Every line needs to be completed Use NA if appropriate Use attachments if there is not enough room and refer to the attachment Attach copies of previous submittals that answer application APDES Form Requirements 12

Section 1 - Basic Facility Information Form 1 General Application Form 13

Location Information Page 1 is Facility Information not discharge/outfall information Coordinates Decimal Degree preferred Provide referenced point-facility front door, middle of parcel, NW corner of property line Key Points of Form 1-Page 1 14

Accuracy of Latitude and Longitude must be to the 5 th decimal place at a minimum State uses North American Datum 1983 or NAD 83. Most GPS devices default to WGS 84. Location data submitted without datum will cause delays in processing the application Accuracy and Datum-Page

and are common codes for Seafood Processors NAICS Codes - Page 1 16

Alaska Coastal Zone and District Program was terminated last year. The following are true about the future of the program: – Future is uncertain at this point – Coastal Questionnaire Not required at this time – May change in the future Coastal Zone Boundary-Coastal District - Page 1 17

Section 3 18

Responsible party is the person who has authority to sign the application and signs the application. 18 AAC requires specific authority to sign an application. A president, secretary, treasurer, or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation Section 3 19

Authorized individual is a duly authorized individual who has authority to sign reports for the responsible party. Can be delegated to a title instead of a specific person: Operation Manager, QA manager Section 3 20

Enter in Permit numbers or whether application has been submitted Section 5 Existing Permits - Page 2 21

Section 6 – Pollutant Characteristics 22 If existing processor, normally check Yes for question B

A.Zone of Deposit (ZOD) information No separate ZOD application at this time is required. Provide ZOD information on a supplemental attachment Section 9 23

B.Thermal Discharge Noncontact cooling water and other non-process wastewaters may have a thermal discharge. Apply for a mixing zone if the State WQS cannot be met at the end of the discharge pipe. Section 9 24

C. Site Specific Criteria In naturally mineralized area that often occur in a mining region, site specific information must be submitted to allow a change in the designated specific uses. This is often a lengthy process involves the permittee providing data indicating that a site-specific criterion may be required to alleviate an unnecessary restrictive general criterion. Section 9 25

D.Mixing Zone-If yes require a mixing zone, complete Form 2M Section 9 26

Signature. Must be person identified in Section 3 with adequate authority All forms must be signed Section 10 27

Form 2C 28 Existing Manufacturing, Commercial, Mining, and Silvicultural Operations Seafood Processor who discharge ‘process wastewater’ - Wastewater exposed to a raw product All lines need to be complete or marked NA

Common for Seafood Processors (Page 32) Table 2C-1 Physical Treatment Processes 1-L Grinding 1-T Screening Section 3: Treatment 29

Basis for Rainfall Event Method of Estimation Storm Water Flows 30

Part B: Line Drawing 31

Common Issues Water input location are not identified Water input structure not provided if water is pump from waters of US. Water input and output are not balanced Part B: Line Drawing 32

Question A - Yes Question B - Yes Complete C Section 4 33

Section 6 34

Section 6 35

At least one analysis for each parameter in effluent. If pollutant from source water, an analysis should also be conducted Required even if last permit did not require the analysis One table for each outfall Table 6 - A (Page 19) 36

Mark Believed Present or Believed Absent. If believed Present, at least 1 analysis required One table for each outfall Table 6 - B (Page ) 37

Table 6 - C (Page ) 38

There are no Tests Required for the Seafood Processing Primary Industry Category Review remaining table to determine if “believed present” or “believed absent” If believed present, conduct at least 1 analysis of the effluent discharge Source water analysis recommended, but optional if believed present Table 6 - C (Page ) 39

Metals-Pollutant of Interest in Seafood Processing wastewater Use “clean” sampling techniques Work with lab to ensure appropriate sample containers and preservation Indicate in Section 9 the laboratory and analysis performed by the lab Table 6 - C Continued 40

Signed by the same responsible party as form 1 Must be signed Section 10 41

Required for every Individual Permit application that has a current mixing zone or seeks to continue with a mixing zone. Form 2M 42

In-depth review of the application beyond the scope of the workshop Work with DEC staff on specific issues Consultant are often required to satisfy the mixing zone application requirements Form 2M 43

Many similarities to Form 2C, but Section 6 is not as structured as an existing facility application Still have to determine which parameters are likely in effluent discharge but estimates are used (since it is not discharging yet) Form 2D New Discharger/New Source 44

No form at this time Work with DEC if a zone of deposit is needed Zone of Deposit Application 45

End of Module 3B 46