20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.

Slides:



Advertisements
Similar presentations
24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
Advertisements

22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Abbreviated list of April Global Run (AGR) achievements All: clock frequency scan ECAL/RCT/L1: test (28 of 500) new oSLB  oRM links Strips: run with all.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Since last meeting, no collisions LHC has been working towards increasing the intensity in single bunches towards achieving the 2011 integrated luminosity.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Over the Last Couple of Weeks Gave talk at CMS Run Coordination Workshop –See Jay’s talk Two CSC Online computers have been replaced in the past two weeks…
Track Selection Performance of the CMS Cathode Strip Chamber Track Finder and Level 1 Trigger Kristin Beck Advisors: Dan Holmes, Darin Acosta 14 August,
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
US ALCT / AFEB Analog Test Results N.Bondar, T.Ferguson, N.Terentiev* EMU Meeting UCLA 01/10/2003.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Management hoo-hah Created short list for DPG coordinator ( ) – Talked with several people to converge on the list – Tiziano now has the list and.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
Update on “Muonic Timing” of CSC Electronics
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Timing/Synchronization Status
“Golden” Local Run: Trigger rate = 28Hz
CMS EMU TRIGGER ELECTRONICS
Overview: Introduction to LHC Overview of CMS
Darin Acosta University of Florida
CSC Trigger Primitives Test Beam Studies
CSC Turn ON Status Report by Fred B.
Plans for the 2004 CSC Beam Test
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs –All chambers HV = OK –ME  2, ME  3, ME  4 LV = OK Tomorrow: Continue powering on ME–1

20 Oct 2009G. Rakness (UCLA)2 Near term CMS Running 22 – 23 Oct.: Mid-Week Global Run –To include clock scan Mon. 26 Oct.: Begin 24/7 global running in preparation for beam –CSC shifts begin Monday 26 Oct. 09:00 –Plan is: start/stop runs as predicted for first collisions after stop perform calibration runs 2 shifts/week “playtime” Restricted change control

20 Oct 2009G. Rakness (UCLA)3 LHC Plans as of this Morning This weekend: Injection tests to sector 3-4 (LHCb, ALICE) 7 – 8 Nov.: Injection tests to sector 4-5 (CMS) –Injection tests = “beam splash” events….

20 Oct 2009G. Rakness (UCLA)4 Proposal for CSC to-do w.r.t. TMB Wednesday: –Continue powering on detector: ME–1 –Merge TMB software with online software version currently in CVS Currently ongoing… –After ME–1 on, change online software link to merged version and download TMB firmware (15 Oct 2009 version) to VMEm2_5 –Measure communication parameters alct_rx_clock_delay, alct_tx_clock_delay, alct_posneg, alct_tx_posneg, cfeb[0-4]delay –Synchronize BC0 –Take a long local run, i.e., enough data to get sensible “Dayong’s plots” –Roll back TMB firmware and software Weekend: –Assuming Dayong’s plots look OK Download TMB firmware to system Move to online software version EMULIB_7_12 (new TMB software) Measure communication and synchronize BC0 in system Monday: –Local run and make sure everything is OK… (if I somehow didn’t manage to get one on Sunday…)

20 Oct 2009G. Rakness (UCLA)5 Xml file created for VMEm2_5 (test chamber for muonic timing) Starting from VME_minus_ _pretrigger3.xml… Change the TMB Firmware dates –tmb_firmware_month="6“  “10” –tmb_firmware_day="4“  “15” Add communication parameter alct_tx_posneg=“XX“ –to be measured Add Time-of-flight offsets… –alct_tof_delay=“XX”  input values from Jay (next page) –tmb_to_alct_data_delay=“XX“  input values from Jay (next page) –cfeb_tof_delay="0“ –cfeb0_tof_delay="0“ –cfeb1_tof_delay="0“ –cfeb2_tof_delay="0“ –cfeb3_tof_delay="0“ –cfeb4_tof_delay="0" Make LCT0 BC0 from TMB, LCT1 BC0 from ALCT –Add mpc_sel_ttc_bx0="0“ –Change alct_bx0_enable="0" to alct_bx0_enable="1" Change tmb_bxn_offset=“XX”  “3540” –Variable: will affect absolute offset of RX (see next page) Change alct_bxn_offset=“XX”  “0” –With muonic timing, BXN should = BC0… (may need to change depending on ALCT latching of BC0 signal)

20 Oct 2009G. Rakness (UCLA)6 Muonic timing parameters from Jay to be used in the test xml Set mpc_tx_delay="0" Replace afeb_fine_delay values with FAST site values (to compensate for AFEB  ALCT cable lengths) Input values… TX == tmb_to_alct_data_delay tx == alct_tof_delay Chamber TX tx RX rx ME-2/1/ ME-2/1/ ME-2/1/ ME-2/2/ ME-2/2/ ME-2/2/ ME-2/2/ ME-2/2/ ME-2/2/ Values to be measured to compare with above predictions… RX = alct_bx0_delay (= match_trig_alct_delay) Rx = alct_rx_clock_delay