Commonwealth Incident Prioritization– ITSEC Endorsed: Defines Priority with which Incident will be managed URGENCY/ IMPACT High A service outage with broad.

Slides:



Advertisements
Similar presentations
Disaster Planning: The Basics TEAJF Statewide Grantee Meeting Houston July 20, 2006.
Advertisements

Chapter 4 Infrastructure as a Service (IaaS)
Join the conference call by dialing the conference number in your Invitation or Reminder s. Please put your phone on mute. Please stand by! The webinar.
Chapter 3 Internet. Physical Components of the Internet Servers Networks Routers.
6/3/20151 MARS... and the YEAR 2000 Management Administrative and Reporting System Commonwealth of Kentucky.
E-business Infrastructure
Group Presentation Design and Implementation of a company- wide networking & communication technologies strategy 9 th December 2003 Prepared By: …………
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
©Ian Sommerville 2006Critical Systems Slide 1 Critical Systems Engineering l Processes and techniques for developing critical systems.
Incident Management ISD Division Office of State Finance.
Network security policy: best practices
Services Tailored Around You® Business Contingency Planning Overview July 2013.
1 Networks, advantages & types of What is a network? Two or more computers that are interconnected so they can exchange data, information & resources.
Sign-Off on Commonwealth Incident Prioritization: Defines Priority with which Incident will be managed URGENCY/ IMPACT High A service outage with broad.
1. Agenda Service Utilization Service Level Metrics Service Performance Review Incident Review Current / Future Service Plan Service Improvement Plan.
Electronic Public Record What is it, and Where Can Agency Lawyers Find It?
Chapter 7: Using Windows Servers to Share Information.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
Administration and Finance Incident Prioritization Document
Corporate Information Systems Delivery of Infrastructure IT Services.
IT Service Excellence Committee (ITSEC) Jan. 20th Meeting
MAEDS 45 th Annual Conference October , 2009.
Health Information Technology Basics January 8, 2011 by Leola McNeill adapted from Information Technology Basics by June 2009, Kayla Calhoun & Dr. Frank.
 Information technology is defined as the use of computer hardware and software to manage information.  Six functions of data management: Convert.
Enterprise Computing With Aspects of Computer Architecture Jordan Harstad Technology Support Analyst Arizona State University.
©2013 Cengage Learning. All Rights Reserved. Business Management, 13e Technology and Information Management Electronic Technology Fundamentals.
Commonwealth IT Consolidation Background and Basic Talking Points (Update Title as Needed) Committee or Person Presenting Date MM/DD/YYYY.
 ITSEC Agreed upon initial set of Commonwealth-wide KPI’s* for Incident Management  Reporting is based upon ITSEC endorsed Incident Priority model as.
Co-location Sites for Business Continuity and Disaster Recovery Peter Lesser (212) Peter Lesser (212) Kraft.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
Preventing Common Causes of loss. Common Causes of Loss of Data Accidental Erasure – close a file and don’t save it, – write over the original file when.
Computer Networks. What are Networks? A computer network is a group of connected computers. Networks allow:  the sharing of information, such as files.
Computer and Information Science Ch1.3 Computer Networking Ch1.3 Computer Networking Chapter 1.
Supporting Services in Schools ICT Service Level Agreement Howard Lazarus - ICT Support Manager Martin Morgans - Datacentre Manager.
ERCOT Service Desk Upgrade May BMC Remedy Service Desk (PR60055) Scope: –Implement 5 of 6 pillars of ITIL Service Support framework Service Desk.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Dec. 23 rd Meeting Dec. 23, 2010.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee (ITSEC) Nov 10, 2010.
Information Technology Division Executive Office for Administration and Finance IT Service Excellence Committee Jan. 19, 2012.
Office of Emergency Management University of Houston-Clear Lake Business Continuity Planning.
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
April 28, A shared commitment to provide the most effective education to all students so they live successful lives. In order to accomplish the.
Windows Small Business Server 2003 R2 Powering Small Businesses.
Commonwealth IT Consolidation Background and Basic Talking Points Date MM/DD/YYYY.
Business Continuity Disaster Planning
The Internet Technological Background. Topic Objectives At the end of this topic, you should be able to do the following: Able to define the Internet.
Information Technology Division Customer Service Support Center.
Contingency Management Indiana University of Pennsylvania John P. Draganosky.
Network - definition A network is defined as a collection of computers and peripheral devices (such as printers) connected together. A local area network.
Properly Safeguarding Personally Identifiable Information (PII) Ticket Program Manager (TPM) Social Security’s Ticket to Work Program.
Mission Continuity Program Tabletop Exercise FY 2017.
April 23, A shared commitment to provide the most effective education to all students so they live successful lives. We envision using technology.
Review of IT General Controls
Chapter 7: Using Windows Servers
Service Delivery Dashboard: FY17 Overview
3.1 Types of Servers.
ICT II Unit 6 Networking.
Technology Department Annual Report
3.1 Types of Servers.
Chapter 2 Introduction to Computer User Support
3.1 Types of Servers.
Mission Continuity Program
Audit Plan Michelangelo Collura, Folake Stella Alabede, Felice Walden, Matthew Zimmerman.
Business Contingency Planning
Business Continuity Planning
Business Continuity Technology
1 2 Please stand by! The webinar will begin shortly.
The present Whether you are using paper and pen to currently gather and store information either clinical or administrative the transition into an Electronic.
The Service Portal What is the Self-Service Web Portal?
The Service Portal What is the Self-Service Web Portal?
Technology Department Annual Update
Presentation transcript:

Commonwealth Incident Prioritization– ITSEC Endorsed: Defines Priority with which Incident will be managed URGENCY/ IMPACT High A service outage with broad impact to the Commonwealth, across one or more services that are not functioning, or whole sites or agencies are impacted, or an agency specific critical severity (outage) has occurred causing complete service outage (as opposed to for example, a performance degradation). (see attached Critical Applic. List). May effect public safety, transportation, health, financial servicing, or ability to deliver other public services. Medium There is impact to a portion of an agency or office, with one or more services to the Commonwealth, either not functioning or seriously degraded so the effect is that the agency’s mission is impacted. Also may apply if one or more very high profile parties are impacted (I.e. Secretary or direct report). Low Impact is to an individual or a small workgroup or the service impacted is not of a mission critical nature. Immediate action is required to restore service (s) or prevent failure of a service. No work around exists. Priority 1 Priority 2 Priority 3 A service outage occurred & there is a work around but service degraded or work around not sufficiently timely, too costly or too much effort. Or service has not failed but potentially may do so. Priority 4 A service outage has occurred and a work around exists and/or the remediation and/or needed procurement is in process. Priority 4/5* *reflects the fact that some existing ticketing systems currently use a fifth priority level

Commonwealth Incident Prioritization: ITSEC member examples URGENCY/ IMPACT High A service outage with broad impact to the Commonwealth, across one or more services that are not functioning, or whole sites or agencies are impacted, or an agency specific critical severity (outage) has occurred causing complete service outage (as opposed to for example, a performance degradation). (see attached Critical Applic. List). May effect public safety, transportation, health, financial servicing, or ability to deliver other public services. Medium There is impact to a portion of an agency or office, with one or more services to the Commonwealth, either not functioning or seriously degraded so the effect is that the agency’s mission is impacted. Also may apply if one or more very high profile parties are impacted (I.e. Secretary or direct report). Low Impact is to an individual or a small workgroup or the service impacted is not of a mission critical nature. Immediate action is required to restore service (s) or prevent failure of a service. No work around exists. FastLane user accounts inaccessible; Unable to Log into Citrix; Network to Lowell office out. ESE Mail (Exchange) down effecting all 550 Secondary Ed. end users Complete loss of mission critical EHS application (ex. Beacon 3, Meditech, Family-net) Critical gateway loss (AD, VG, Mass.Gov) Complete Massmail outage at an EHS site -Complete loss of Commonwealth mission critical service (HRCMS, MMARS, etc.) DEP network down effecting 400 users; e-Permitting system down; EEA’s network down causing ELA (Environment Law Enforcement) outage and public safety impact LWD network ISP circuit failure all services impacted Registrar’s PC down; AutoCAD Licensing server down, Oracle Fin. Down ELAR -Educator Licensing applic. down preventing all admins & teachers from obtaining licensing records & certifications Severe degradation of service from critical gateway (AD, VG, Mass.Gov) Complete loss of MassMail at an EHS agency EEA’s Waste site Cleanup data unavailable to Lic. Site professionals due to server outage Bad network switch - Springfield LWD call center down ANF: Governors Network down or Agency critical applic. out/degraded MassDot Employee’s hard drive down A service outage occurred & there is a work around but service degraded or work around not sufficiently timely, too costly or too much effort. Or service has not failed but potentially may do so. Critical voice service components are not functional (ex. Voice Mail) MassMail service for the Commonwealth is degrading ANF: E-mail node down effecting some users Nutrition Applic. Performance is degraded – health educators have difficulty obtaining necessary info. IVR redundancy failover required causing degradation for Lawrence Call Center Single EEA user BB out ANF: EE keyboard broken A service outage has occurred and a work around exists and/or the remediation and/or needed procurement is in process. EEA’s HelpDesk HelpStar application unavailable but workaround via phones avail for short-term ANF: Phone system outage but redundant node processing calls EE PC down- temp. replacement not true image ANF: switch port out but other is avail. Local MASS.DOT printer outage – EE ability to do primary job no impacted ESE Corrupted outlook file on siwillngle user –w/a is: use OWA Printing for a group of users at An EHS site down, but alternative printing in the site available. P1 P2 P3 P2 P3 P4 P3 P4 P4/P5

Commonwealth Incident Prioritization: ITSEC member examples URGENCY/ IMPACT High A service outage with broad impact to the Commonwealth, across one or more services that are not functioning, or whole sites or agencies are impacted, or an agency specific critical severity (outage) has occurred causing complete service outage (as opposed to for example, a performance degradation). (see attached Critical Applic. List). May effect public safety, transportation, health, financial servicing, or ability to deliver other public services. Medium There is impact to a portion of an agency or office, with one or more services to the Commonwealth, either not functioning or seriously degraded so the effect is that the agency’s mission is impacted. Also may apply if one or more very high profile parties are impacted (I.e. Secretary or direct report). Low Impact is to an individual or a small workgroup or the service impacted is not of a mission critical nature. Immediate action is required to restore service (s) or prevent failure of a service. No work around exists. Complete Public Access infrastructure outage RMV Mainframe outage DCJIS Mainframe outage impacting state wide public safety access to critical resources (ex., warrants, restraining orders, CORI information) Circuit outage with the FBI or national partner Nlets impacting Commonwealth communications with the FBI and law enforcement in other states EPS core network hardware failure Blackberry outage impacting EPS senior staff and MEMA staff Mission critical application outage (ex. CJIS, CORI, Web Fusion) Electronic fingerprint system outage EPS VPN service outage Internet slowness Firearms licensing application responding slowly EPS VPN not working inside MAGNET VOIP service down at one MPTC facility Some wireless users reporting sporadic issues accessing CJIS from cruisers/laptops A service outage occurred & there is a work around but service degraded or work around not sufficiently timely, too costly or too much effort. Or service has not failed but potentially may do so. CJIS Extranet site down, staff can handle information requests via telephone EPS Help Desk application is unavailable, requests for service can be taken via telephone CJIS User Access application server failure, site is up on backup hardware but performance is degraded T1 circuit failure at a SIRS agency, using redundant T1 but experiencing network slowness CJIS Offline search application is responding slowly Visiting employee at EPS facility cannot gain access to the network Telephone issue with one DCJIS user A service outage has occurred and a work around exists and/or the remediation and/or needed procurement is in process. DOC core network device experienced routing issues, required reboot, service back to normal but code upgrade required to prevent further issues Some CORI users are not able to retrieve CORI results via ftp service Network switch down at MSP site, redundant switch assumed primary role and new hardware will be implemented P1 P2 P3 P2 P3 P4 P3 P4 P4/P5