1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014.

Slides:



Advertisements
Similar presentations
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Advertisements

Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Problems with Muon System N. Bondar O.Maev
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
Status of NA62 straw electronics Webs Covers Services Readout.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
RPC Upscope Meeting Jay Hauser 05 Feb 20101/11 Overview of the CSC Phase I Upgrade plans ME4/2 upgrade: 72 new large chambers for high-luminosity triggering.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Update on “Muonic Timing” of CSC Electronics
University of Wisconsin
LAV front-end and readout status
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
Electronics for RPC Upscope
University of California Los Angeles
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
RPC HV&LV status Introduction HV power supply tender
CSC Electronics Installation and Commissioning CSCE I&C
TMB and RAT Status Report
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
CSC Turn ON Status Report by Fred B.
Plans for the 2004 CSC Beam Test
CSC Status Report Status reports;
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

1 CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014

2 HV, LV and skew clear cables for ME-42 chambers installed RPC gas tubes prevented us from finishing cable installation The last VME-4/4 crate cabled with skew clear cables

3 ME+11 problems 1.ME+1/1/08 – swapped skew clear cables (fixed) 2.ME+1/1/20 - swapped PPIB cables (fixed) 3.ME+1/1/35 - LV terminal block problem (fixed) 4.ME+1/1/26 – bad skew clear cables (replaced) 5.ME+1/1/04 – missing 5.5 V for DCFEB 5 (not confirm on the surface). 1.ME+1/1/22 – no ALCTtx/rx working area 2.ME+1/1/33 – no ALCTtx/rx working area, no data from DCFEB7 (some ALCT problems seen on the surface, but DCFEB7 problem has not been confirm)

4 Near operation tasks 1.Time in the readout of ME+42 chambers with PC config. 2.Take a long CR run (or a few runs) with 4 stations of +Z endcap (without ME+11). 3.Repeat test of all installed ME Start ME+11 LTT (6 chambers). 5.New MPC test (CR local runs). 6.As soon as LV and HV are ready on –Z endcap start operating station -2 and -3 (include these station in the local runs).

DOC volunteers 1.Amithabh Shrinivas UC Riverside experienced shifters 2.Pieter Everaerts UCLA 3.Senka Duric UW 4.Jesse Heilman UC Riverside 5.Indara Suarez TAMU 6.Jessica Brinson OSU 7.Kennedy Elizabeth UC Riverside 8.Devin Taylor UW 9.David Morse NU 10. Xiaofeng Yang UCLA 11. Jay Hauser UCLA 12. Eric Takasugi UCLA (yes before August, ? after)

6