Texas Maintenance Assessment Program (TxMAP). Background Developed by TxDOT’s Maintenance Division in 1999 to document the condition of the highway system.

Slides:



Advertisements
Similar presentations
Office of Traffic, Safety, and Operations Application Guidelines Miscellaneous Signs Signing Plan Design (At-Grade) June 20, 2012.
Advertisements

1Operations DivisionApril 29, Pavement Markings Policy, Measures, Targets Policy: Provide appropriate pavement markings to provide presence and.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
MONTANA Department of Labor & Industry Employment Relations Division Occupational Safety & Health Bureau P.O. Box 1786 Miles City, Montana Fax:
Managing a Statewide Network An overview of the CDOT Pavement Management Program Eric Chavez Stephen Henry
Maintenance Rating Program Training 2014 KYTC Division of Maintenance Tracy Nowaczyk, P.E.
DANIEL PETERSON Transportation Operations Supervisor II Alexandria Sub Area MN/DOT Performance Measures: Integrated Roadside Vegetation Management.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
TXDOT Asset Maintenance
Pavement Management Engineer
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Spencer, Massachusetts: ROAD MAINTENCANCE AND ACCOUNTING SYSTEM Project Advisors: Professor Fabio Carerra Professor Chickery J. Kasouf Project Group:
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
6 TH ANNUAL CONFERENCE. Footer Text Date PERFORMANCE-BASED MAINTENANCE APPROACH DB/P3 Edward P. Pensock, Jr. P.E. Strategic Project Division Director.
Steve Varnedoe Condition Assessment & Funding Needs for North Carolina’s Highway System North Carolina Department of Transportation Report to the Joint.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
LAND AREA: 688 SQ. MI. – 3RD LARGEST IN OHIO 421 C/L MILES 393 BRIDGES (275 NBIS) 1,800 CULVERTS 5,000+ SIGNS 10 RAILROAD CROSSINGS (at grade) CURRENT.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
MAINTENANCE RATING PROGRAM Allen Mattox District Five Technical Support Manager.
Regional and Short Line Railroads
CE577_Spring 2007 Pavement Management and Rehabilitation Dr. Fouad Bayomy, PE Professor of Civil Engineering
Highway Resurfacing Materials Cost Estimate Tool Richard D. Bellows Spring 2005.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Development of GIS integrated Pavement Management System (PMS) for small cities. Golam Mohammad Moinuddin.
Section 4 – Supplement Maintenance Management System (MMS) (WAC 136 – 11) Larry Pearson, Maintenance Programs Manager.
April 1, UPDATE Texas Business Leadership Council John A. Barton, P.E. – Deputy Executive Director.
MoDOT’s Inventory Systems and Measures for Pavement Marking and Roadway Signing Jim Carney State Maintenance Engineer October 2004.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Compass Large Scale View (BHO Scope of Influence) Teresa M. Adams Professor, Civil and Environmental Engineering University of Wisconsin-Madison March.
"The Use of Condition Assessments to Improve Maintenance Level of Service in Texas" Joe S. Graff, P.E. Texas Department of Transportation.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
Asset Management Maryland Department of Transportation State Highway Administration Joseph M. White.
2009 ROADWAY CONFERENCE 1R PROGRAM Cathy Nelson Steven Lindland.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
What’s The Cost? How much?  Refer to your home work :  What other costs are there?  How much does that come to per month?
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Asset Management Maintenance Management System
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
John Angiulli Interim Director PUBLIC WORKS DEPARTMENT Citizen Academy October 9 & 16, 2012.
1 Performance measurement data are displayed for 10 individual survey cycles, including 3 cycles for each of the fiscal years 2001 through 2003 and the.
MDT’s Pavement Marking Program Mike Bousliman Montana DOT MQA Peer Exchange October 12, 2004 Madison Wisconsin “Ensuring a consistent level of retro- reflectivity.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Prospective Rural Additions Meeting JULY 15, 2015.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
Michael Soto Program Resources Administrator Office of Maintenance.
Guide Signs Pavement Markings.  Guide signs provide information about intersecting roads, help direct you to cities and towns and show points of interest.
Future of Roadway Characteristics Inventory (RCI) Florida Department of TRANSPORTATION Kirk Hutchison Office of Maintenance.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
February 2012 State Board Ruling: School Grade Calculations
MISSISSIPPI ADEQUATE EDUCATION PROGRAM (MAEP)
Roadway Pavement Management Plan
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Maintenance Rating Program Training
Pavement Asset management section
Preschool Snapshot New Jersey Department of Education
TxDOt maintenance division update
Chapter 23 The Texas Legislature
TIBC Road Maintenance Sub-Committee Meeting
Presentation transcript:

Texas Maintenance Assessment Program (TxMAP)

Background Developed by TxDOT’s Maintenance Division in 1999 to document the condition of the highway system Satisfy legislative accounting mandate (Government Accounting Standards Board Requirement #34 or GASB 34) Performance measurement tool for Legislature’s Appropriations Bill Developed to provide documentation to districts on particular elements that need additional emphasis Used as budget allocation tool

For TxMAP the system generates one mile sections for rating Ratings are based on a 1-5 scale with 5 being the best and 1 the worst A zero indicates the element does not apply For each section observed, twenty three elements separated into three highway components are assessed We assess 10% of IH and 5% of all other roadways For FY 2007 over 4000 one mile sections were evaluated statewide from our roadway inventory of 79,897 miles of state maintained roadways

Components/Elements Pavement = 50% of total score  Rutting  Cracking  Failures  Ride  Edges  Shoulders

Components/Elements Traffic Operations = 25% of total score Raised Pavement Markers Large Roadside Signs Small Roadside Signs Striping, Pavement Graphics AttenuatorsDelineators Shoulder Texturing

Components/Elements Roadside= 25% of total score Vegetation Management LitterSweeping Trees and Brush DrainageEncroachments Guard Rail Guard Rail End Treatment Mail Boxes General Public Rating

Raters Three former maintenance supervisors with combined years of service of over 75 years in highway maintenance Utilize district personnel to assist with assessments District personnel are not allowed to assist with assessments in their own district With three raters we do our inspections at a cost of around $200,000 a year

While performing our inspections we take pictures of poor maintenance to show the districts, these pictures are sent along with the report. We also show some of these at our annual Maintenance Conference We also take pictures of good maintenance so we can share with the neighboring sections and districts Last year we drove around 37,500 miles while collecting our data for TxMAP, this is just below half of our roadways Along with meeting our government mandates we use this as a continuous improvement tool

Questions David Bennett 512/