2013 Spokane River Conference March 26, 2013
Shelley Lake Gravel Pit Spokane River
Staff Van Ness Feldman GordonDerr Special Legal Counsel URS, Corp. Technical Consultants
REVISED Public Review Draft Completed Legal Review Technical Advisory Group Review Preliminary Draft Developed Research and Review Law/Guidelines Inventory Report SAG Issues
Inventory and Characterization Report/Analysis Goals and Policies Shoreline Environment Designations Develop Regulations Address Cumulative Impacts Restoration Plan Administrative Procedures Local Adoption Public Review Process Public Access Plan
Urban Conservancy - High Quality Aquatic Urban Conservancy Upland Residential Waterfront Residential Residential Public Lands /Zoned for Developm’t High Quality Env. - Designated Conservat’n Land Below OHWM
Table of Restoration Opportunities Conceptual Restoration Approaches Riparian Plantings Streambank Stabilization Noxious Weed Control Maps and representative photos
Integration with other Community Plans Public Access and Public Uses Shoreline Conditions Public Access Plan Implementation Strategy
Buffers Land Uses Allowed Docks Public Access Restoration Balancing Private Property Rights Vegetation management (public and private) Shoreline Modification
Planning and Zoning Long Range Planning Shoreline Master Program