SCC Report Out C. Tilton. Workplan PriorityWork ItemLead 1Use CasesS. Shorter 2Standards Adoption PolicyJ. Clark 3aStandards InventoryS. Shorter 3bCatalog.

Slides:



Advertisements
Similar presentations
Longitudinal Coordination of Care LCP SWG Thursday, May 2, 2013.
Advertisements

Longitudinal Coordination of Care LCP SWG Thursday, April 18, 2013.
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Convene Planning Workshop with Key Stakeholders to Develop TMM Educate Stakeholders Select Exercise Planning Team from Stakeholders Conduct Facilitator.
Training for OCAN Users Day 2
Privacy Evaluation Methodology (PEM) v1.0 Overview IDESG Privacy Committee James R. Elste Dr. Stuart Shapiro February 2013.
IDESG Goals & Work-plans for 2013 and beyond Brett McDowell IDESG Management Council Chair
Regular process for global reporting and assessment of the state of the marine environment, including socio-economic aspects Taking forward Global Oceans.
STANDARDS COORDINATION COMMITTEE C. TILTON 26 JULY 2013 SCC Update.
Framework Planning Draft 1 Jack Suess Ian Glazer Peter Alterman Andrew Hughes Michael Garcia.
CAP 252 Lecture Topic: Requirement Analysis Class Exercise: Use Cases.
WEEK 4 Material Lecture 4a (Wed.). Use Cases/Actors o What is a use case ? l A sequence of actions performed by a system that yields an observable result.
Delivery Methodology.
IS&T Project Management: Project Management 101 June, 2006.
® VisualPlex Exchange Project Definition Phase June 23, 2000 Prepared James M. Dutcher Oracle Consulting Services.
SCC Activities C. Tilton. Standards Are applied to SOMETHING Within some CONTEXT Something = ID Ecosystem Context = Use Cases 2.
Design Patterns Discussion of pages: xi-11 Sections: Preface, Forward, Chapter
Functional Model Workstream 1: Functional Element Development.
Identifying the Baseline IDESG Security Committee Discussion 10/23/
Using Information Technologies to Empower and Transform Peter F Brown Independent Consultant Proposals regarding methodology and process.
Eric Antwi Ofosu (PhD) Smart Sanitation & Washtech - KNUST.
EPA’s Environmental Indicators Gateway Guy Tomassoni, Chief Analytical Products Branch Ecoinformatics Technical.
HIT Policy Committee Nationwide Health Information Network Governance Workgroup Recommendations Accepted by the HITPC on 12/13/10 Nationwide Health Information.
SCC Workplan C. Tilton. Press Releases The IDESG announces the availability of the IDESG knowledge base which provides access to a repository of information.
TFTM Interim Trust Mark/Listing Approach Paper Analysis of Current Industry Trustmark Programs and GTRI PILOT Approach Discussion Deck TFTM Committee.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
MC Sub-Committee for Workplanning: Recommendations Report Chair/presenter: Paul Laurent.
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research.
OVERVIEW SCC Charter. Content 1.Title – Standards Coordination Committee (SCC) 2.Statement of Purpose 3.Scope 4.List of Deliverables 5.IPR Mode (IDESG.
CTI STIX SC Monthly Meeting August 19, 2015.
STANDARDS COORDINATION COMMITTEE PLENARY BREAKOUT 18 SEPTEMBER 2014 Interoperability Requirements.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
DNSSEC Deployment Initiative: Roadmap Version 2.0 Suresh Krishnaswamy, SPARTA Steve Crocker, Shinkuro, Inc.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Progress on Identity Management: A Canadian Perspective on GSC Resolution 14/4 Colman Ho ISACC DOCUMENT #:GSC15-PLEN-28 FOR:Presentation SOURCE:ISACC AGENDA.
Evaluating and Enhancing Lake Michigan Nearshore Monitoring John Hummer and Guan Wang Great Lakes Commission Summer Webinar July 24, 2013.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Kelsey RAL/STFC,
Use Case Development Cathy Tilton, Daon Scott Shorter, Electrosoft Services 7 February 2013.
Weekly Discussion Guide Functional Model Planning October 31, 2013 Adam Madlin Security Committee.
Using the FRP to Enhance Georgia’s Leadership Program May 9, 2006 Stephanie Busch P 2 AD.
Service Definitions A Framework For Standard Interface Development.
GOS Economic Model (GEM) Overview Uses the same underlying simulation software (Stella) which was used in developing TNM Economic Model (NB-Sim) Provides.
Proposed Privacy Taxonomy for IOT Scott Shorter, Electrosoft, These slides are based on work contributed to the IDESG Use Case AHG in January.
1 Standards Harmonization Readiness Criteria TIER 1 March 2, 2006 HITSP Standards Harmonization Criteria Committee.
ORGANIZATIONAL CULTURE AND CHANGE
Use Case Model Use case description.
Longitudinal Coordination of Care LTPAC SWG Monday, April 22, 2013.
COMET Working Group Progress Report. Purpose of Report Provide Team Updates Potential Future Voting Items Draft Competitive Meter Ownership Timeline.
Longitudinal Coordination of Care LCP SWG Thursday, May 23, 2013.
The Value of Creating the Identity Ecosystem. The Identity Ecosystem Steering Group (IDESG) is the source of expertise, guidance, best practices and tools.
Public Health Reporting Initiative July 25, 2012.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
Review of the UNECE Glossary of Terms on Statistical Data Editing Paper by Statistics New Zealand’s Editing and Imputation Methodology Network Presented.
Evaluation of State Oral Health Plans Paul W. Mattessich, Ph.D.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
Progress Report on the U.S. NSTIC Efforts Jack Suess – Delegate for Research, Development, Education & Innovation
Financial Services Sector Coordinating Council (FSSCC) 2011 KEY FSSCC INITIATIVES 2011 Key FSSCC Initiatives Project Name: Project Description: All-Hazards.
IoT R&I on IoT integration and platforms INTERNET OF THINGS
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Longitudinal Coordination of Care LCP SWG Thursday, April 25, 2013.
Welcome to the Revolution – Day Two
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
Implementation Guide for Linking Adults to Opportunity
ESS Vision 2020: ESS.VIP Validation
SUDAN Group 3 - Coordination.
Standards Harmonization Readiness Criteria
Requirements “Content Guide”
Joint ITU-WHO Workshop on e-Health Standards and Interoperability (Geneva, Switzerland, April 2012) Session 7 chair’s notes from session 7 open.
Presentation transcript:

SCC Report Out C. Tilton

Workplan PriorityWork ItemLead 1Use CasesS. Shorter 2Standards Adoption PolicyJ. Clark 3aStandards InventoryS. Shorter 3bCatalog of Terms and DefinitionsS. Shorter 4Inputs to the Identity Ecosystem Functional Model G. Whitehead & P. Brown 5IDESG Accepted Terms and DefinitionsP. Brown 6Standards Gap AnalysisTBD 7IDEF Standards RegistryTBD

SCC Role in Use Cases Recognized need & stepped forward as coordinator Like all SCC activities/workproducts, IDESG is the consumer – SCC is the enabler – IDESG must be an active participant (contribute, comment, approve) – Collaborative process must be defined We have provided a starting point

Use Cases Levels/categories Process for development/approval Template/format Criteria

Level/Categories Purpose of use cases – create a baseline set of use cases to guide our collective efforts Original intent – define “high level” (functional) use cases to be used across IDESG Other groups define “lower levels” (overlays) for their particular areas of interest, e.g. – Security overlay – User experience overlay – Etc. All use case contributions accepted – Leveling to be performed later

Use Case Process Detailed, end-to-end process to be defined First phase – collection – Intent is to leverage a Wiki – AHG may create some to jumpstart – Solicit contributions from plenary

Template/Format Strawman template in draft Use Case Plan – Use Case Name/Description – Category – Actors – Goals – Assumptions – Requirements – Process Flow – Success Scenario – Error Conditions

Vocabulary Key element of IDEF 2 steps – – Catalog existing – IDESG glossary Parallel development track Wiki planned AHG formed Vocabulary rapporteurs from other groups sought

Collaboration Participation needed from IDESG groups and plenary