GENIUS kick-off - November 2013 GENIUS kick-off meeting WP100 - management X. Luri.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Advertisements

November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
Anthea Fabri Horizon 2020 National NCP Coordinator
IRINA KUKLINA, RICHARD BURGER BRUSSELS, 25 NOVEMBER 2014 CO-FUNDING MECHANISMS OF RUSSIAN-EUROPEAN S&T COOPERATION.
Session 321 An Implementation Strategy: Identifies who is responsible for which actions Identifies what funding mechanisms and other resources are available.
Research Contracts and IP Services TRAINING WORKSHOPS ON HORIZON 2020 – 27 NOV 2014 The Grant Agreement Roger Wallace – Research Contracts & IP Services.
Bonn 04/10/2004 ERA-MORE The European Network of Mobility Centres and ERACAREERS the European Researcher’s Mobility Portal.
Marie Curie Actions Initial Training Networks (ITN) 2013 Contractual Rules Financial Managemet Reporting and Monitoring ITN Best Practices.
Management Structure and Responsibilities SUST-RUS
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
Towards Regional Independent Operators – a main driver for successful market integration.
Horizontal Research Activities involving SMEs Joachim Ball, European Commission, DG RTD B3 n Co-operative Research n Collective Research General Introduction.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
Implementation and Execution of Successful Research Projects with Industry Partners Keith R. Davis, Ph.D. Director.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
COST (European Cooperation in Science & Technology) An Introduction to the COST Grant System Dr. Mafalda Quintas (TD Science Officer) Ms. Andrea Tortajada.
Project:“Support to the Internationalization of Kosova Higher Education System through establishment of the Kosova Students’ Union” Status Quo on Student.
The Preparatory Phase Proposal a first draft to be discussed.
QUALITY IN MOBILITY Management of International Mobility Programme Triple I Elina Tulla, University of Turku 3 February 2011.
Bush School Diversity Report January 29, A General Comparison of Student Data.
ERASMUS MUNDUS ACTION 1B – Joint Doctorate Programme Marine Ecosystem Health & Conservation Dr Ian O’Connor GMIT
Project:“Support to the Internationalization of Kosova Higher Education System through establishment of the Kosova Students’ Union” Status Quo on Student.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
EPOCA – 11. June EPOCAConsortiumOrganisation.
GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University.
> February 2010 Kick-Off meeting - Lilongwe WP: Build-up of Cooperative Network – EU and Africa Kenneth Matengu and Pempelani Mufune.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
CLARIN work packages. Conference Place yyyy-mm-dd
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Leader subcommittee meeting- 26/11/ THE CONTACT POINT OF THE EUROPEAN NETWORK FOR RURAL DEVELOPMENT Main tasks of the Contact Point in relation to.
Contracts FP6. PRESENTATION OUTLINE è Legal Framework è Participation è Contract Structure è Collective Approach l signature and entry into force l collective.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
NOV-3733-SL-9316 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Consortium building PHOENIX Training Course Laulasmaa, Estonia
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
The partnership principle and the European Code of Conduct on Partnership.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
Erasmus Mundus Action 2 - Strand 1 Lot 1: Algeria, Morocco, Tunisia Erasmus Mundus - Al Idrisi: A scholarship scheme for exchange and cooperation between.
1 EuroCRIS Seminar Brussels, 13 September 2010 Dr. Peter Fisch European Commission Evaluation of the Framework Programme Tools and Challenges.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
DG RTD as a policy DG: what changes? 'IGLO Open' 6 October 2015 Ms Maive Rute, Director, DG RTD.R.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Key Functions & Responsibilities (from the old governance document) – Coordinates the program-level adaptive management system and assists the GITs in.
FAO/WHO Codex Training Package Module 3.1 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.1 Functions of national.
Science, research and developmentEuropean Commission HUMAN FACTOR, MOBILITY AND MARIE CURIE ACTIONS Page 1 Marie Curie Schemes - Proposal for FP6 10/09/2002.
SWAFS NCP Info Day Brussels, 2 February 2016 RTD B7 - Science with and for Society RTD-7.1 Gender Sector HORIZON 2020.
1 Customized NCP services for Euratom projects This presentation is based on materials from EC and/or Ministries and Agendas of RP 8 April,
Towards Gendered Science and Research: Gender Mainstreaming in the EU Science Policies Alexandra Bitusikova 7 September 2005 Bratislava, Slovakia.
Building Strong Library Associations | Regional Convenings DAY 2 Session 6 How will I get support for my proposal? External relationships.
EVALUATION OF SCHOOL LEADERSHIP AND TEACHING PRACTICE BASQUE COUNTRY INSPECTORATE OF EDUCATION. DEPARTMENT OF EDUCATION, LINGÜISTIC POLICY AND CULTURE.
European Life Sciences Infrastructure for Biological Information ELIXIR Collaboration Agreement Template ELIXIR/2014/10 Vera Herkommer.
The Eurostars Programme is powered by EUREKA and the European Community Prague, 10 October 2011 EUR EKA B2B for R &D Cooperation Josef Martinec EUREKA.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
WP1 - Consortium coordination and management
Universitat de Barcelona / FBG
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
Project Management M I S S I O N WP1:
CEPMC Executive Board and General Assembly EC standardisation package
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Presentation transcript:

GENIUS kick-off - November 2013 GENIUS kick-off meeting WP100 - management X. Luri

GENIUS kick-off - November 2013 This work package includes the administrative tasks to fulfill the EC requirements and rules as well as the global administrative and coordination tasks inside the consortium, including financial management, intellectual property management and project documentation. It also includes the coordination with institutions and bodies relevant for the development of the Gaia archive like ESA, DPAC and GREAT, as well as the representation of GENIUS in meetings or committees related to this coordination. These tasks will be carried out by: The GENIUS coordinator, assisted by a hired project manager (to be devoted part time to the GENIUS tasks) The coordinators of the four main partners through the GENIUS executive board. In addition the coordinator of the UCAM (IoA) node will provide the interface to the wider GREAT community.

GENIUS kick-off - November 2013 UBCNRSULUED Core development CESCA Simulations & portal UBRULBUGCSICFFCULINAF Specialised development UCAM Cooperation with nanoJasmine and Jasmine KU

GENIUS kick-off - November 2013

Partnership agreement In order to formalise in detail the internal workings of GENIUS and the roles and responsibilities of the partners (described in this section) a Partnership Agreement (PA) will be drawn up and agreed at the start of the programme. It will define the decision taking procedures in GENIUS and the mechanisms for conflict resolution, that will be channelled through the Executive Board, as well as the management of Intellectual Property Rights as described in 3.2. To be discussed in tomorrow’s session

GENIUS kick-off - November 2013 Gender issues: recruitment We propose to generate one/two research applications to be filled by young female researchers. In order to achieve this, we propose to have flexible funding be made available for a short period of time in order to stimulate young female researchers to apply for the GENIUS positions. As long as the gender bias exists, such funding should be open specifically to female applicants, because experience shows that otherwise male applicants may obtain a disproportionate share of such funding. In GENIUS we also propose a transparent access to positions, because insufficient transparency often coincides with downgrading of female candidates. Criteria for open positions and promotion in this GENIUS project is proposed to be transparent and made public (  GENIUS portal & wiki).

GENIUS kick-off - November 2013 Gender issues: work-life balance One of the causes for the present distribution is the relatively more limited availability of women, many of who for whatever reason end up siding with their families and are less mobile, both nationally and internationally. In order to counter this, we propose to allow for more but shorter trips and virtual international contacts. Working conditions are favourable to work-life balance if meetings and extracurricular obligations outside of regular working hours are kept to a minimum and the option of flexible working hours and working spaces is offered under fully transparent conditions.

GENIUS kick-off - November 2013 Gender issues: conferences To help increase the pool of female faculty members in computing science, GENIUS proposes an initiative to promote some conferences at the faculties about our project, locating woman as speakers to illustrate that successful women do exist in computing.

GENIUS kick-off - November 2013 Coordinator WP100 X. Luri Executive Board Main WP managers & coordinator WP200 A. Brown WP300 N. Hambly WP400 X. Luri WP500 F. Arenou INAF UGUBRCSICULBFFCUL Advisory board European Commission Administrative management Global project management Core tasks management at host nodes Management of specialised tasks WP600 J. Torra Support activities Tracking of objectives UCAMKU Jasmine cooperation To be discussed tomorrow

GENIUS kick-off - November 2013 Schedule: to be discussed tomorrow