1 Argentine Power Sector Market operation - facing stress situations CAMMESA Compañía Administradora del Mercado Mayorista Eléctrico APEX Conference October.

Slides:



Advertisements
Similar presentations
Argentine Power Sector
Advertisements

The Single Electricity Market in Ireland
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Project Discovery Transmission Workstream, 4 March 2010 Ben Woodside.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
Mexican Financial Markets. Mexico’s Economic: Highlights GDP: $621 B GDP: $621 B  Largest in Latin America  12 th largest of the World 8 th Largest.
The Brazilian Energy Market ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005 ANEEL/FERC/MoPSC/UtahPSC Workshop Brasília, August 9 th, 2005.
Introduction to Macroeconomics
5 Introduction to Macroeconomics PART II CONCEPTS AND PROBLEMS IN MACROECONOMICS Introduction to Macroeconomics 5 C H A P T E R O U T L I N.
Luis A. Camargo S. Wholesale Electricity Market Manager Colombia The Andean Electricity Market -TIE- Cartagena de Indias, October 14&15th
Measuring GDP and Economic Growth Chapter 1 Instructor: MELTEM INCE
Introduction to Macroeconomics
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
The Kazakh Operator of Electric Power and Capacity Market
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Gent Summer School: Electricity Markets & Trading Gregory Michiels 27 August 2013.
World Forum on Energy Regulation IV Athens, Greece October , 2009 Regulatory challenge of Russian energy sector reform Dominique Fache, General.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
NATIONAL BANK OF AZERBAIJAN KHAGANI ABDULLAYEV, EXECUTIVE DIRECTOR.
Growth of the Economy And Cyclical Instability
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Introduction to Macroeconomics
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
 400 new jobs  300% >90% ROI Greener  40MW SSE Ireland Better Energy Supply 600,000 gas and electricity customers Sustainability Making energy better.
THE CHALLENGES OF EUROPEAN ENERGY SECURITY Jiří Feist, CEZ Group.
An Overview of the Australian National Electricity Market Brian Spalding Chief Operating Officer.
Strategies for the security of electricity supply.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
The Southern Cone of South America Experiences and Recent evolution Juan Luchilo – CAMMESA APEx Conference October 2004 Leipzig - Germany.
Power Exchanges in the extended EU The experience in Czech Republic APEx Conference 2004 October 11 th, Leipzig Miroslav Marvan Operator trhu s.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
Impact of Liberalization of the Electricity Market on Energy Efficiency, Quality of Supply and Environmental Performance Eric BONNEVILLE ECI Webconference.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
A Tour of the World Chapter 1. © 2013 Pearson Education, Inc. All rights reserved The Crisis Table 1-1 World Output Growth since 2000.
CHAPTER 5 Introduction to Macroeconomics © 2009 Pearson Education, Inc. Publishing as Prentice Hall Principles of Macroeconomics 9e by Case, Fair and Oster.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
„Impact of the financial crisis on BH economy“ by Kemal Kozarić Governor of the Central Bank of Bosnia and Herzegovina January 16, 2012.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
PRESENTATION FOR INVESTORS Unified Energy System of Russia.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
NS4054 Fall Term 2015 North America Energy Trilemma.
Market Integration The Southern Cone of South America Experiences Juan Luchilo – CAMMESA APEx 2003 Conference Cartagena, Colombia.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Illinois Wholesale Market Update December 10, 2003.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Introduction to the UK Economy. What are the key objectives of macroeconomic policy? Price Stability (CPI Inflation of 2%) Growth of Real GDP (National.
INVESTMENT IN GENERATION CAPACITY PAYMENTS IN COLOMBIAN MARKET Luis A. Camargo S. Wholesale Electricity Market Manager Colombia APEx Orlando. October.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
Energy in Transition: Embracing Disruption Dr Liam Wagner Economics, Griffith Business School 5th IAEE Asian Conference, February 2016 Department of Account,
Updated Energy Year 2011 Electricity Finnish Energy Industries
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
California Power Deregulation in 1996 Provider selection Fossil fuel (gas, oil, coal) Waste products Renewables (wind, hydro, solar, geothermal) Pricing.
AS Economics PowerPoint Briefings Introduction to Macroeconomics AS Economics.
© 2009 Pearson Education, Inc. Publishing as Prentice Hall Principles of Economics 9e by Case, Fair and Oster 20 PART IV CONCEPTS AND PROBLEMS IN MACROECONOMICS.
Overview of the Korean Economy September 2009 Joong Shik Lee Research Department The Bank of Korea.
Argentine Power Market Fuel Oil Use & Opportunities for the Future Central Puerto S.A. Fuel Oil / Energy Buyer’s Conference Miami, September 2000.
BULGARIA – ECONOMIC PERSPECTIVES
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Energy transition in Uruguay
Presentation transcript:

1 Argentine Power Sector Market operation - facing stress situations CAMMESA Compañía Administradora del Mercado Mayorista Eléctrico APEX Conference October 2006 Seoul, Korea

 WEM – Basic Rules - Global Figures – Key Indicators  Macroeconomic changes - Impacts  Fuel Supply  Pre financing Maintenance  Expectations - Concerns Outline

 Market established in 1992  Spot Market (80%) SHORT-TERM MARGINAL-COST BASED STABILISED SEASONAL PRICES FOR DISTRIBUTORS (regulated) HOURLY PRICES IN SPOT MARKET (capped to gas prices) ADDITIONAL PAYMENT FOR CAPACITY (12 $/Mwh; 90 hours per week) REMUNERATION FOR ANCILLIARY SERVICES  Contract Market (20%) CONDITIONS AGREED BETWEEN PARTIES Basic Market Operating Rules

Installed Capacity 24 GW Peak LOAD 18 GW Generation TWh 500 kV km 220/132 kV km WEM - Participants Generators 53 Distributors 63 Large Consumers Ma302 Large Consumers Mi 2006 Transmission COs 10 Traders 4 Wholesale Electrical Market

 Dic 2001 => political crisis with deep recession in economy led to the fall of the government; social instability  Austral summer 2002  New transition government  Debt default; end of the fixed exchange rate (1$=1u$S) and devaluation  economic emergency law => pesification of economy  Profound economic crisis; inflation Macroeconomic Changes

 Since July 2002 => conditions begin to stabilize; relative normalization of the behaviour of economy  May 2003 => new elected government Macroeconomic Changes Evolution of exchange rate=> Increase of industrial demand due to greater competitiveness to export and import substitution Exchange rate => 200% Inflation => about 80%

 Tariffs to end consumers => social impossibility to increase tariffs due to economic crisis and people impoverishment  Pesification of natural gas, energy and capacity prices on the WEM  Increase of imported fuel and maintenance costs  Uncertainty related with exchange rate evolution and expected performance of the generation units Electricity Sector Scenario - Transition

% GDP vs Demand exchange rate 1$/u$s about 3 $/u$s

% GDP vs Demand

 Strong recovery – four years in a row (03/06) with GDP rates above 8%  Fiscal Surplus due to the increase of economic activity and a high exchange rate  Meaningful decrease of unemployment rate (from 20% to 11%)  Gain of political power and support Economics

 Political => less confidence in markets; energy as an strategic sector => more state participation  WEM Energy Prices => Maintain short term marginal cost system, with a cap price related with gas cost (less than 100 $/MWh (30 u$s/MWh). Differences recovered through uplift costs.  WEM tariffs => average below cost; residential and small consumers subsidised; industrial consumers adjusted partially Electricity Sector – Scenario - Decisions

Spot Price Evolution Definanciation of stabilization fund

 GDP - Strong recovery => demand increase  Focus => security of supply  Usage of thermal reserves => fuel supply (liquid) and maintenance (older plants)  Short term => cover the increasing demand => extensive use of thermal plants – increase of liquid fuel consumption  Additional problem => dramatic change in oil cost (from 30 to 60 U$S/bbl) and uncertainty Electricity Sector – Situation

Fuel Consumption

Thermal Dispatch – older plants  After three years without dispatch, need to use older plants extensively => increase of maintenance requirements and fuel supply

 Marginal signals smoothed & uncertainty related with evolution of oil price  Main problem => financing => fuel supply & maintenance  Mechanisms adopted – Fuel Supply  direct fuel oil supply (agreement with Venezuela +contracts) through CAMMESA. Centralised coordination of fuel supply  anticipation of money to the generators  Total consumption Fuel Oil =>  2003 => 0,1 M ton; 2006 => 1,6 Mton => more than 60 shipment Electricity Sector Scenario

Annual - Fuel Oil Consumption - Mton

 Mechanisms adopted – Maintenance  Anticipation of money to the generators to finance major maintenances  Generators require the amount of money related with the maintenance cost  CAMMESA evaluates the cost – benefit relation (impact in operation costs of losing the group during a year) and informs to the Energy Secretariat  In case the amount required is authorised, CAMMESA anticipates the money to Genco  Genco gives it back in 12/24 months, beginning 1 year after the finishing of the maintenance Electricity Sector Scenario

 Short term => cover the increasing demand => ensure availability of thermal capacity and fuel; optimise the use of hydro plants to minimise the risk of supply  new generation => an agreement was reached where the Treasure ensures payments of variable costs (including capacity) and 35 % of marginal rent; rest of it => derived to a Fund (FONINVEMEM) created to finance the installation of new generation. Recent tender=> Siemens will provide 2 x 800 MW CC plants (2008). Gencos will own shares of them.  diversification => increase of fossil fuels costs make hydro/alternative generation more competitive, but require a kick off from national government. The completion of Atucha II (750 MW nuclear) and of the level of Yacyretá reservoir (+700 MW hydro) to be available by 2009/11  Demand side management, energy savings and emergency imports as resources to diminish supply risks. Expectations – Concerns

¡Thanks for your attention! Seoul, November 2006 Doubts => More info => Quality, Technology & Transparency