NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES006177-14 Safety Awareness for responders to Hurricane Katrina Operations: Demolition Safety.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
§ – Subpart L Oklahoma State University2.
Subpart R Steel Erection
SCAFFOLD SAFETY.
Ladders and Stairs. Hazards of ladders Falls Slips Reaching too far Weather 1a.
5/1/2015OSHA Office of Training & Education 1. 5/1/2015OSHA Office of Training & Education 2 Subpart Q - Concrete & Masonry Construction ( )
OSHA Office of Training and Education1 Excavations – Subpart P.
Subpart T Demolition These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Walking-Working Surfaces
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
OSHA Subpart Q Concrete and Masonry Construction.
GA Tech Safety and Health Consultation Program FALL PROTECTION.
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
Walking-Working Surfaces
Walking-Working Surfaces: Preventing Falls.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Most Frequently Cited Serious Violations Construction – FY 2006.
Scaffold User Training
Walking-Working Surfaces. Housekeeping is more than being tidy All areas are clean, orderly, and sanitary Floors are clean and dry Areas free of protruding.
Most Frequently Cited Serious Violations Construction – FY 2008.
Fall Protection in the Roofing Industry
Safety for Working in High Places
FALL PROTECTION. WHY? –BECAUSE: Falls accounted for 10% of fatal work injuries in 1994 & Serious hazards can be present while above ground. –Examples:
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
Fall Hazards.
Most Frequently Cited Serious Violations Construction – FY 2011 OSHA Federal Standards October 1, 2010 – September 30, 2011.
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Blasting Regulations Regulatory Requirements for Blasting Operations.
Georgia Tech Safety and Health Consultation Program
Most Frequently Cited Serious Violations Construction – FY 2009 OSHA Federal Standards October 1, 2008 – September 30, 2009.
FALL PROTECTION. Duty To Have Fall Protection Protection at or above 6’ level Walking/working surfaces inspected before work begins Employees can only.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
Most Frequently Cited Serious Violations Construction – FY 2007.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Focus Four Fall Protection in Construction Focus Four Fall Protection.
OSHA Office of Training and Education 1 Walking-Working Surfaces.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Fall Protection Training. - Falls remain the number one cause of fatalities in the construction industry. FALL PROTECTION FACT!!!
Most Frequently Cited Serious Violations Construction 2000.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
OSHA Office of Training and Education
Demolition Operations Preparatory operations Stairs, passageways, ladders Chutes Floor openings Walls, masonry.
Excavation & Trench Safety
Hot Work Permit Osan AB Fire Emergency Services.
OSHA Office of Training & Education
Fall Protection for Construction
Walking and Working Surfaces
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Demolition 29 CFR 1926, Subpart T
Most Frequently Cited Serious Violations
Regulatory Requirements for Blasting Operations
Personal Protective Equipment
Blasting Regulations Regulatory Requirements for
Ladders and Stairs in Construction
Most Frequently Cited Serious Violations
§ SUBPART L SCAFFOLDS 1.
Regulatory Requirements for Blasting Operations
Most Frequently Cited Serious Violations
Most Frequently Cited Serious Violations
Presentation transcript:

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Safety Awareness for responders to Hurricane Katrina Operations: Demolition Safety

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Overview Introduction to Demolition Regulations

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Objectives of this training - At the end of this short session, you should be able to: 1.Identify the hazards 2.Explain how to protect yourself from these hazards 3.Increase safety and health awareness

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES OSHA Demolition Standards Preparatory operations Stairs, passageways, ladders Chutes Floor openings Walls, masonry & chimneys Manual removal of floors Removal of walls, floors w/ equip Storage Removal of steel construction Mechanical demolition Demolition by explosives

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Engineering survey, competent person, written record Framing, floors, walls Unplanned collapse Worker exposure to adjacent structures

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Damaged structures where employees must enter shall be shored or braced Utilities shutoff or capped before starting

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Relocate & protect any needed utilities Test or purge pipes containing HazMat

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Remove fragmented glass prior to demolition if a hazard to workers

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Protect wall openings to height of 42 inches 42"

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Debris through floor holes - no chute: –Barricade six feet back from hole –42 inch guard rail –Warning signs each level –Cease above operations before removing below

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Floor openings not for material drops: –Covered –Strong enough for any imposed loads –Secured Preparatory Operations

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Preparatory Operations Except for prep work (cutting holes for chutes, etc..) demolish top down Uppermost ext. walls & floors removed to storage prior to removing from floor below

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Employee entrances - Multi-story structures –Sidewalk shed or canopy –8 feet out from building –2 feet wider than entrance Sustain a load of 150 pounds per square foot Preparatory Operations

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Stairs, passageways... Only designated stairs used, close all others Inspect to ensure all maintained in clean, safe conditions

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Stairs, passageways... Multistory buildings, stairwells illuminated Access through properly lighted, protected, and separate passageway.

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Chutes No material dropped outside exterior walls unless area is protected Material chutes STEEPER than 45 degrees, fully enclosed

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Chutes Chute opening > 48 inches, with closures Substantial gate at discharge, controlled by competent employee

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES !! 48" Max Openings kept closed when not in use

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES !! 48" Max Guardrails installed where men drop debris Space between chute and edge of floor solidly covered

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES !! 48" Max Toeboard or bumper 4” thick X 6” high Securely attached

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Removal of material through floor openings Floor openings no larger than 25% aggregate total floor area, unless lateral supports remain Floors weakened or unsafe through demolition must be shored to carry intended loads for demolition

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Removal of walls, masonry sections, and chimneys Falling masonry sections shall not exceed safe carrying capacities of floors No walls higher than one story shall stand alone All walls in stable condition at end of shift No employees on top of walls if weather is a hazard

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Removal of walls, masonry sections, and chimneys Load supporting members on any floor shall not be removed until floors above are gone Floor openings < 10 feet from any wall to be demolished, fully planked unless no one below Skeleton-steel can remain in place as long as loose masonry removed as demolished

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Structural or load-supporting members on any floor shall not be cut or removed until all stories above such a floor have been demolished and removed. This provision shall not prohibit the cutting of floor beams for the disposal of materials or for the installation of equipment, provided that the requirements of and are met.

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Removal of walls, masonry sections, and chimneys Walkways or ladders, to safely reach or leave, scaffolds or walls Retaining walls supporting earth or adjoining structures, braced or undrepinned before demolition Walls used to retain piled debris must safely support imposed load

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Manual removal of floors Openings cut in floor, extend full span of arch between supports remove debris from any floor arch or adjacent area first Provide min, full size 2 x 10’s for standing while breaking arches between beams 2 x 10’s must support if arch collapses 16 inch max between planks

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Manual removal of floors Min 18 x 2 wood walkways or eq. to avoid walking on exposed beams Sufficient strength stringers to support planks Ends of stringers supported by floor beams or girders not arches alone Planks over solid bearing and min 1 ft overlap

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Manual removal of floors Removing floor arches no employees below and must barricade Clear debris within twenty ft. before removing floor arches

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Removal of walls, floors, materials and equipment No mechanical equipment on floors unless sufficient strength Floor openings: curbs or stop logs Mechanical equipment meets Subparts N and O (cranes and motor vehicles)

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Storage Storage of debris on any floor, within floor load Wooden floor building, can remove one floor above grade to store debris Do not remove wood floor beams bracing int. or free-standing ext. walls until shored

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Storage Remove floor arches up to 25 ft above grade to store debris, structure must remain stable Block off storage space for dumped material Opening only for removal Kept closed all other times

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Removal of steel construction When arches have been removed, planks provided before razing the steel framing Cranes, derricks, hoists meet subpart N Steel dismantled column length x c. l. & tier by tier (two story columns OK) No over-stressing dismembered members

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Mechanical Demolition No workers in areas adversely affected by balling or clamming operations Only necessary workers allowed any other time Demolition ball < 50% of craned rated load or 25% of breaking strength of line from which it is suspended (whichever is less)

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Mechanical Demolition Crane boom, load line as short as possible Swivel type connection ball & load line Positive attachment, no accidental disconnect

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Mechanical Demolition When pulling over walls all steel members previously cut free Remove cornices etc..., before pulling over wall During demolition, continuing inspections by competent person, detect & eliminate hazards

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES General provisions Only authorized & qualified handle explosives Smoking, firearms, matches, open flames prohibited while explosives are handled, transported or used No drugs or alcohol while handling or using Account for all explosives at all times Unused explosives locked in magazine

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES General provisions Owner keeps record, notifies authority if lost, stolen, unauthorized magazine entry Fight no fires near explosives If blasting near structures confine throw of fragments w/ mats, protect employees

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES General provisions Authorized employees must use precautions: visible & audible warning signals, flags, barricades etc... to ensure employee safety Conduct blasting between sunup and sundown Due precautions prevent accidental discharge of electric blasting caps: radar, lightning, radio transmitters, powerlines, dust storms & any other extraneous source of electricity

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES General provisions Suspend operations & remove personnel at the approach of an electric storm Warning signs: no radio transmitters w/in 1000 ft, if R.T’s used competent person documents Ensure mobile transmitters < 100 ft are off & locked

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Blasting Zone 1000Feet About 48” x 48” Turn Off Two Way Radio About 42” x 36”

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES General provisions Do not use deteriorated or damaged explosives Notify utility & take precautions if blasting near power lines Use of Black Powder is prohibited

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES General provisions Buildings non-combustible, or sheet metal on wood studs Floors in mixing plant concrete or non-adsorbent Fuel oil storage separate & drain away Mixing plant must be well ventilated Direct sources of heat from outside building only

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Blaster qualifications Can understand & give written and oral orders In good physical condition & not an addict Qualified by knowledge, training experience in transporting, handling, use of explosives & laws Blasters furnish evidence of competency Knowledge and competent in each type of blasting used

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Surface transportation of explosives Meet DOT 46CFR & listed regulations Driver is fit and knows laws for transporting No smoking, no matches, or ammo in vehicle No other items transported Blasting caps & explosives travel separately Strong good vehicles only Securely mounted on cargo bed

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Loading explosives Establish safe procedures before starting Drill holes large enough for free insertion Tamping only with wood rods or plastic rods Never tamp primer Load only holes to be fired in next round No drilling until butts of old holes are examined Shall not deepen holes that have contained Exp. No unattended explosives at blasting site

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Loading explosives Unnecessary machines removed from hole area before explosives are delivered No operation of equipment within 50 feet No other activity in area allowed Powerlines safe distance, cables deenergized & locked out by the blaster Holes checked prior to loading for depth & cond. No drilling < 50 ft from undetonated holes

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Initiation of explosive charges- electric blasting No initiation of E.B. where extraneous electricity B.C. leg wires shunted till connected for blast Blaster must conduct survey for E.E. & eliminate Single E.B. all caps same style & manufacture All E.B. blasting, follow mnfr’s recommendations

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Initiation of explosive charges-electric blasting Keep blasting wires too short to hit power lines or anchor Only t/ man making lead wires fires the shot Immediately after firing, wires are disconnected from the machine and shunted

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES Use of safety fuse Use of detonating cord Firing the blast Inspection after blasting Misfires Underwater blasting Blasting in excavation work under compressed air Definitions

NIEHS – HMTRI Katrina Response Initiative 10/17/20052 U45 ES