ACT – Fourth months later… Prepared by: Martin Gastal Jim Cook 22/03/20111Jim Cook & Martin Gastal.

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

ESafe Reporter V3.0 eSafe Learning and Certification Program February 2007.
Integrating The Datacenter OpalisRobot MOM Operator.
© 2008 RightNow Technologies, Inc. Title Best Practices for Maintaining Your RightNow Knowledge Base Penni Kolpin Knowledge Engineer.
Introduction Testing is examining the project performance according to the specifications that have been agreed. This will include the robustness of the.
Wireless LAN Topology Visualiser Project Supervisor: Dr Arkady Zaslavsky Project Team Members: Jignesh Rambhia Robert Mark Bram Tejas Magia.
The Best Zoo Web Programming money can't buy. That's right. You can't buy web programming like this. That's why we're giving it away for free!!!
Nu Project Management Office A web based tool to Manage Projects.
Introduction <Header Title> Last saved: YYYY-MM-DD
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Hands-On Microsoft Windows Server 2008 Chapter 11 Server and Network Monitoring.
CH 13 Server and Network Monitoring. Hands-On Microsoft Windows Server Objectives Understand the importance of server monitoring Monitor server.
Windows Server 2008 Chapter 11 Last Update
Microsoft SharePoint 2010 Upgrade Preview FSU SharePoint Users Group Presents: Thursday, December 1 st, 2011.
Final Year Project Presentation E-PM: A N O NLINE P ROJECT M ANAGER By: Pankaj Goel.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
This chapter is extracted from Sommerville’s slides. Text book chapter
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Trimble Connected Community
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Information Architecture Linden Daniels. Steps of a Successful Information Architecture Discovery Education Design Migration Monitor.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Creating a common understanding on Adverse events information requirements CCC-TI Isabelle Laugier Nov 2 nd 2012.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Lead Management Tool Partner User Guide March 15, 2013
1 Tradedoubler & Mobile Mobile web & app tracking technical overview.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
1 3. Computing System Fundamentals 3.1 Language Translators.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
1 Session Number Presentation_ID © 2002, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for Security and Virtual Private Network.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
CH 13 Server and Network Monitoring. Hands-On Microsoft Windows Server Objectives Understand the importance of server monitoring Monitor server.
MODULE 3 Internet Basics © Paradigm Publishing, Inc.1.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … PRESENTED BY ROBERT FREEMAN (
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
State of Georgia Release Management Training
MND review. Main directions of work  Development and support of the Experiment Dashboard Applications - Data management monitoring - Job processing monitoring.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Schedule Sub-Working group K. Foraz 27/03/2012. Aim & members Specify the schedule feature inside IMPACT – From preparation of worksites to closure –
Metric Studio Cognos 8 BI. Objectives  In this module, we will examine:  Concepts and Overview  An Introduction to Metric Studio  Cognos 8 BI Integration.
Mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
Windows Vista Configuration MCTS : Internet Explorer 7.0.
Architecture Review 10/11/2004
LHC intervention scheduling with the Work Acceptance Tool
To the ETS – Accounts Setup and Preferences Online Training Course
Building Regression Tests With PeopleSoft Test Framework
Project Center Use Cases Revision 2
Safety in Construction and Upgrade Phases
ShareTheTraining TRR ARB Presentation Team 11
Project Center Use Cases Revision 3
Project Center Use Cases Revision 3
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
PSS0 Configuration Management,
Presentation transcript:

ACT – Fourth months later… Prepared by: Martin Gastal Jim Cook 22/03/20111Jim Cook & Martin Gastal

Agenda →Activity Coordination Tool - Introduction →Project Status →Operational statistics & incidents →Use cases →1. Shutdowns & Extended Technical Stops →2. Operation, Machine development periods, Technical Stops, Short accesses →Next steps 22/03/2011Jim Cook & Martin Gastal2

ACT Introduction Project started in 2009 Goals: – Provide a web based application to manage Work Packages in the CMS Experimental Area – Build up the memory of the experiment Application to handle data exchange with various CERN/CMS databases Continuous improvement process driven by user feedback 22/03/2011Jim Cook & Martin Gastal3

ACT Introduction Database created to fill all long term needs Fourth version of the ACT is now available Specs – Locate on “CMS on-line” server – Back-end: Oracle – Front end: JavaScript – Development environment: JDeveloper – Portability: Optimised for Internet Explorer, Safari (mac & iPhone), Opera, Google Chrome and FireFox Core team: – Software Engineer: Jim Cook – DB Administrator: Frank Glege – Application Developer: Stephane Bally 22/03/2011Jim Cook & Martin Gastal4

22/03/20115 ACT Core module ACT Core module Equipment Traceability module Equipment Traceability module Notification module Engineering Integration module Engineering Integration module Tooling module Tooling module Risk Asses. module Risk Asses. module Short Access module Short Access module Document library module Document library module Incident Management module Incident Management module Advanced planning module Advanced planning module Access Control module Access Control module Survey module Survey module RP Survey module RP Survey module ✔ ✚ Complete On-going Planned ✔ ✔ ✔ ✚ ✚ ✚ ✚ ✔ ✚ ✚ ✚ Visits Management module Visits Management module Jim Cook & Martin Gastal

3 key functionalities: 1. request a WP 2. modify/clone a submitted WP 3. browse the list of submitted WPs Connect to EMDb Retrieve equipment tree structures Monitor equipment moves in/out of RP designated areas Inventory management Buffer zone management (bar code) Radio Protection measurements ALARA analysis (Collective dose) RP measurement in buffer area Notify group of users by /SMS Typical messages: Your WP request has been accepted Your WP has been modified You are requested to provide more info on your WP Short access imminent… VIC organised… 22/03/20116 ACT Core module ACT Core module Equipment Traceability module Equipment Traceability module Notification module Engineering Integration module Engineering Integration module Tooling module Tooling module Risk Asses. module Risk Asses. module Short Access module Short Access module Document library module Document library module Incident Management module Incident Management module Advanced planning module Advanced planning module Access Control module Access Control module Survey module Survey module RP Survey module RP Survey module Program PADs for General Access Connect to Catia Display 3D geographic/ configuration views Track changes in integration models Connect to MTF Display tooling specs Check tooling certifications Gantt chart Day by day schedule Risk/location/configuration matrix List of preventive actions Pictures Work procedures Archive Survey reports Link to on-line alignment community Create and advertise new access Manage the use of operational dosimeters Manage the RP sweep Track incidents Follow up corrective actions Jim Cook & Martin Gastal

Operational Statistics Downtime ~2.5 days – ACT in operation 119 days, ~98% availability 534 Work Packages processed by ACT since 24 November people named on Work Packages – From 1 to 44 Work Packages per person, average of visits requested via ACT with at least 221 visitors – Since start of year, 121 visits plus 16 VIP visits (including visits not requested via ACT) Work Package requests – ~80% by PH/CMS personnel 22/03/2011Jim Cook & Martin Gastal7

Downtime and Incidents Database maintenance 14 and 15 December 2010 – Portal (CMS online) not available – No Work Packages could be viewed, requested or administered Offline Database maintenance 19 January 2011 – Access control system inoperable Issue with streaming 14 February 2011 – Access control information lagged by ~3 days Portal offline for ~1 hour 4 March 2011 – Though no complaints made ;0) Access control system slow to update 7 March 2011 – Reason not fully understood – Actions being taken to diagnose future issues – Problem solved for short accesses Hardware faults of offline database 11 and 15 March 2011 – Both main hardware and backup hardware (supervised by IT) failed 22/03/2011Jim Cook & Martin Gastal8

Use Case 1 Managing shutdown and extended technical stops – Flow 22/03/2011Jim Cook & Martin Gastal9 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion

Use Case 1 Managing shutdown and extended technical stops – Flow: WP declaration 22/03/2011Jim Cook & Martin Gastal10 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion Done by the Creator Can be modified at any time by both the Creator and the Work Supervisor

22/03/2011Jim Cook & Martin Gastal11 Cables to be installed between the UXC55 and the USC55 Example – PLT work declaration

22/03/2011Jim Cook & Martin Gastal12 Predefined accesses

22/03/2011Jim Cook & Martin Gastal13 List of personnel Partial information Enough at that stage WP number To keep track of the max number of keys To be used

22/03/2011Jim Cook & Martin Gastal14 State of CMS magnet All locations to be accessed during installation Location tree is experiment specific

22/03/2011Jim Cook & Martin Gastal15 Systems affected by WP System tree is experiment specific

22/03/2011Jim Cook & Martin Gastal16 Equipment needed to execute the WP

22/03/2011Jim Cook & Martin Gastal17 RP traceability inventory items are identified and assigned to a move type In, Out, Relocate Item ID Linked to EMDb using bar code

22/03/2011Jim Cook & Martin Gastal18 Most relevant for ALARA

22/03/2011Jim Cook & Martin Gastal19 Basic risk matrix in place Will get updated with configuration of detector

22/03/2011Jim Cook & Martin Gastal20 Most relevant when safety systems or subsystems are affected

22/03/2011Jim Cook & Martin Gastal21 Summary page All sections can be edited individually Option to forward to TIOC Notification sent to WP actors

Use Case 1 Managing shutdowns and extended technical stops – Flow: WP acceptance and insertion in long term plan 22/03/2011Jim Cook & Martin Gastal22 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion Through Technical Coordination meetings, decision made to schedule the work Status update take place through Super user interface

Use Case 1 Managing shutdowns and extended technical stops – Flow: Work package analysis meeting 22/03/2011Jim Cook & Martin Gastal23 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion Review of the method of work Risk assessment Update of relevant sections: Risk, Alarms, Personnel…

Use Case 1 Managing shutdowns and extended technical stops – Flow: Insert in short term Plan 22/03/2011Jim Cook & Martin Gastal24 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion Link to day by day schedule Made available on ACT Main page Hyperlinks to ACT to be available shortly

Use Case 1 Managing shutdowns and extended technical stops – Flow: Work package execution monitoring 22/03/2011Jim Cook & Martin Gastal25 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion Monitoring of WP by CMS shifters Daily list of active WPs and authorised personnel Link to access control system for UXC55 Access management

Use Case 1 Managing shutdowns and extended technical stops – Flow: Work package completion 22/03/2011Jim Cook & Martin Gastal26 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion WP supervisor to close WP upon completion and to add a comment eg 100% complete, reduced scope, will have to be restarted during next technical stop…

Use Case 2 Managing Operation, Technical Stops, Machine development periods, and short accesses – Flow: 22/03/2011Jim Cook & Martin Gastal27 Create and advertise access Risk Assessment ALARA VIC Work execution WP completion WP declarationSchedule WP

Use Case 2 Managing Technical Stops, Machine development periods, and short accesses – Flow: Create and advertise an access/MD period 22/03/2011Jim Cook & Martin Gastal28 Create and advertise access Risk Assessment ALARA VIC Work execution WP completion WP declarationSchedule WP Edit existing access/MDP Create access/MDP Magnet state is essential Lifting the Radiation Veto Max Dose measured during sweep

Use Case 2 Managing Technical Stops, Machine development periods, and short accesses – Flow: WP declaration 22/03/2011Jim Cook & Martin Gastal29 Create and advertise access Risk Assessment ALARA VIC Work execution WP completion WP declarationSchedule WP Time window: TStop, Next short access, MDP Duration and working hours Foreseen impact

Use Case 2 Managing Technical Stops, Machine development periods, and short accesses – Flow: WP scheduling 22/03/2011Jim Cook & Martin Gastal30 Create and advertise access Risk Assessment ALARA VIC Work execution WP completion WP declarationSchedule WP Specific access/MDP Swift editing functionalities Acceptance done during TC meetings and TECOPA

22/03/2011Jim Cook & Martin Gastal31

Next steps Complete EMDb module. – Designed by S bally – Based on existing EMDb (using APEX) – Developed independently from other modules – Fully integrated into ACT Start working on Incident Management module – To be done by German Technical Student Complete RP Survey module – To be done by Jim based on requirements from RPEs – To handle operational dosimeters plus material in the buffer zone Design the Visits module – To be done by Jim based on requirements from Dawn – To include management of key cabinet 22/03/2011Jim Cook & Martin Gastal32