2013 Northwest Hydro Operators Forum Hydro Reporting to NERC GADS Steve Wenke Avista May 7, 2013.

Slides:



Advertisements
Similar presentations
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Advertisements

NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Technical Conference Avoided Cost Modeling January 6, 2015.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
1 Low Load Process Jarreau Cycle Objectives l Review applicable NERC Standards that apply l Review CDP 2.6 Low Load Condition Procedure l Describe.
Lesson 6.2 Keeping Banks Safe February 28, 2011Copyright © … REMTECH, inc … All Rights Reserved1 Introduction There were more bank failures in.
Farm Business Planning Dr. Laurence M. Crane
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
Pumped-storage hydroelectricity By: Dana Nissan Talal Ashqar Gerrit Kottke.
EE 590 Reliability (LOLE) Evaluation for Generation & Transmission Adequacy Brandon Heath October 27 th 2008.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Network Analysis - Introduction Transmission Planning Code Workshop 2 1 st May 2008.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Introduction to Electricity PART 1
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
ORAP ® New User Orientation March 4, 2007 Carlos Garcia Strategic Power Systems, Inc.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Sixth Northwest Conservation & Electric Power Plan Proposed Heavy-duty Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.
Renewables and System Services Ann Scully.
Presented By Dr. Mohsen Alardhi College of Technological Studies, Kuwait April 19 th,2009.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
M.E.F. Mechanical Energy Factory Mechanical Power Converter & Re-Generator System.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
EG2200 Power Generation Operation and Planning - L5 Lennart Söder Professor in Electric Power Systems.
Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4,
PCWA MFP Operations Model All Models are Wrong But Some Models are Useful.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Using Institutional Data: Policies & Best Practices Institutional Research & Reporting.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
CEC/CPUC Energy Storage Workshop LADWP Pumped Hydro John R. Dennis LADWP Director Power Planning & Development November 20,
Setting Payment Amounts for Output of OPG’s Prescribed Assets: The Regulated Contract for Differences Concept IESO Presentation to OEB September 15, 2006.
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
Kaeser Compressors, Inc.
6. PLANNING OF POWER SYSTEM RESERVES
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Long-Term Planning Presented by: APP Site Visit Don Untch
Transmission Planning in ERCOT- Overview
Measurable parameters Unit 10
Fundamental Supply Factors Driving Current Market Prices
Kaeser Compressors, Inc.
GROUP BOOKINGS.
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Energy Aware & Energy Efficient Production for Enhancing Commercial Value of Electric Power produced from a Renewable Energy Power Production Facility.
Experiences with Wind Plants and Stability Studies in Isolated Systems
Division of Energy Resources
Coordinate Operations Standard
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Power Generation: Natural Gas Role
Presentation transcript:

2013 Northwest Hydro Operators Forum Hydro Reporting to NERC GADS Steve Wenke Avista May 7, 2013

GADS Benefits Generator Availability Data System (GADS) To Reliability Organizations:  Data to provide information to help set policies  Data to research systemic problems  Data to find trends with generating resources To Generator Owners  Performance statistics to measure your operation  Benchmark information to help improve your operation

Mandatory GADS Reporting GADS Reporting became Mandatory for 50 MW and Larger in 2012 for 20 MW and Larger in 2013 As you begin to provide the data requested in the report, it becomes quickly apparent that the system is not developed around hydro generating assets.

GADS Reporting Requirements Design Data – nameplate and other rating information Performance Data – unit performance statistics such as MWh’s, Forced Outages, etc. Event Data – descriptions of outages and other details

GADS Reporting Design Data This data included:  GADS Utility Code- GADS Unit Code  Unit Name- Commercial Date  Type of Unit- Size (in MW)  State Located In

GADS Reporting Performance Data  Generation (MWh’s)  On Line hours  Off Line hours  Unit Service Hours (synchronized to grid)  Reserve Shutdown Hours  Synchronous Condense Hours (Motored)  Planned Outage Hours  Unplanned (Forced) Outage Hours  Maintenance Outage Hours  Outage Extension Hours  Unit De-Ratings

GADS Reporting Performance Data Net Maximum Capacity - This is the maximum output of the plant less any station service consumption Gross Maximum Capacity - This is the maximum output of the generator Net Dependable Capacity – This is plant capacity that is available due to outside restrictions. This is net any station service Gross Dependable Capacity - This is the maximum output of the generator due to outside restrictions Reserve Shutdown – unit available but not synchronized for economic reasons.

GADS Reporting Event Data Events are either an outage of some type or a de-rating of some type These are broken down further into planned outages, unplanned outages, planned de-ratings, and unplanned de-ratings

GADS Reporting Event Data Each time a generator breaker operates, an event must be recorded For each event, the operator must report:  The Cause Code of the event – There are several hundred codes to select, depending on the type of unit  The Amplification Code – There are dozens of these codes, depending on the original cause code  Times and Durations  Any Time Extensions

Hydro Specific Issues When there is less than full plant capacity in river flow, should you: a)Report the operating hours? b)Track the times the units are shut down as Reserve Shutdown? c)Report that the unit is down due to lack of fuel? Most seem to report lack of full plant water as a Reserve Shutdown (RS) event. This creates a lot of data for those projects that may be able to peak multiple times each day. Some owners report as “lack of fuel – outside management control”. Some owners don’t report these events at all.

Dependable Capacity Should dependable capacity be defined at minimum head? At maximum head? Does it depend on the time of day? The time of year?

Other Questions being Considered What if you are saving the water to push through the machines for peaking power? What if you are a “run of river” project that can’t regulate water levels? What if you can swap units? How are ramp rate restrictions handled? If your operation is restricted by fish, wildlife, or recreational requirements, do you identify these as “forced de-rates” or “forced outages”. Are they outside management control? Should these be reported at all?

What are we doing to resolve this? It is important, that if we must report this information that the industry get some benefit from this data in terms of benchmarking, performance information, etc. To accomplish this objective, we need to develop either new descriptions or better definitions of existing terms for hydro owners to report.

What can you do? If interested, please provide input on these concepts through: CEATI – that has established a working group that has been recently engaged on this Provide input to me with your thoughts on how best to address these issues. Also, you can monitor NERC’s activities on GADS. However, this is not a standard and changes are not vetted as you might be familiar with.

Questions? Contact Information: Steve Wenke (509)