3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.

Slides:



Advertisements
Similar presentations
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Advertisements

Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
Department of Energy Office of Science HEP FY08 Budget Status and Issues Robin Staffin preCRB Discussion April
SUPERCONDUCTING PARTICLE ACCELERATOR FORUM OF AMERICA (SPAFOA) Update and Planned 2013 Activities April 3, 2013 MSU FRIB Ken Olsen
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
This is the last message in this gathering of North American PI’s with an interest in the INFN hosted SuperB project. I will try to deal with issues on.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
June 12, 2007DOE Program Review1 Emergency Information Be aware of exits in your building Be aware of exits in your building –Speaker will indicate locations.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
Budget Briefing with OHEP Staff: March 3, 2009 Page 1 SLAC HEP Budget Meeting Summary Discussion Charts S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Rev.
Performance Evaluations: PPA InterpretationsPage 1 Interpretations on Performance Evaluation Process D. MacFarlane June 4 th, 2009.
September 26, 2005SLUO Meeting1 The State of the Laboratory Persis S. Drell Deputy Director, SLAC.
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Long Range Planning Pier Oddone September 24, 2007.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
DOE Annual Review of SLAC HEP Research Program June 14-16, 2005 SLAC Charge to Committee Issues Procedures.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
P5 Meeting - Jan , US LHC The Role of the LHC in US HEP Dan Green US CMS Program Manager January 28, 2003.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
1 FY09 PPA Budget Kick Off Rafael Alva Charlotte Chang Oct 22, 2008.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Round Table discussion Norbert Holtkamp SNS Oak Ridge National Laboratory August 11, 2004.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
SLAC All Hands Briefing: FY2008 Budget Persis S. Drell SLAC Director 1/7/08.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Key figures ,86 M€ Details ● 40 PhDs (8,64 M€) ● 13 Postdocs (2,73 M€) ● 1,77 M€ travel ● 0,99 M€ ‘per diem’ ● 2,74 M€ fees ATLAS:LHCb:ALICE=5:3:2.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Yet Another Report from DOE Office of High Energy Physics
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Introduction to Jefferson Lab
Stan Whitcomb LSC meeting Livingston 21 March 2005
Andrei Seryi Materials for discussion TILC-08
Introduction FY09 Linac Ops Review
Presentation transcript:

3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC

3/6/2006FY07/08 DOE Budget Briefing2 Outline  Status of FY06  Opportunities for FY07  FY07 Budget Discussion  Scenarios for FY07  FY08 Budget Discussion  Scenarios for FY08

3/6/2006FY07/08 DOE Budget Briefing3 Status of FY06  FY06  Funding--HEP$145.8M  Funding—BES 29.4M  TOTAL $175.2M  Impact/Opportunities of FY06 budget Full funding to B-factory operations  B-factory AIP reduced $0.5M Strong ILC Program funded at $12.3M Some investment in future opportunities  EXO 200  Accelerator R&D  LSST R&D

3/6/2006FY07/08 DOE Budget Briefing4 Status of FY06 (cont.)  Program Elements B-factory  Technical problem currently limiting luminosity Subject of weekly discussions with program office Impact at ~5% level on long-term luminosity goals  40 running weeks Integrated luminosity projected for FY06: 91/fb  IFR upgrade starts summer 06  Machine upgrades summer 06 GLAST  DOE project complete  Build-up of ISOC Instrument operations support capped at $5M/yr Getting ready for science

3/6/2006FY07/08 DOE Budget Briefing5 Status of FY06 (cont.) ILC R&D  SLAC R&D focus—GDE supported e+e- sources Beam Delivery system Rf power sources Availability and operation Instrumentation  Operations support for L-band klystron development  Leadership positions in many subsystems  Small increase in detector R&D Continued test beam experiments  E166 e+ polarization run completed ATLAS: SLAC has applied to join ATLAS and will submit proposal to become a Tier 2 site for ATLAS

3/6/2006FY07/08 DOE Budget Briefing6 Status of FY06 (cont.) Advanced Accelerator R&D  Plasma wake field acceleration E164/E164X/E167 Optimize program for final FFTB runs Spectacular results, very successful  Laser acceleration experiment progressing in ESB Some slow down due to funding shortfall  SABER white paper developed Workshop March 15/16 Working on operating costs and schedule Possibility of SABER commissioning in FY08

3/6/2006FY07/08 DOE Budget Briefing7 Status of FY06 (cont.)  New Initiatives EXO  EXO200 under construction All resources focused on getting to WIPP 12/06  Barium tagging R&D on hold LSST  Redirected some of resources from GLAST roll off  Build up of collaboration  Resources focused on upcoming competition/ P5 process Director’s review of cost and schedule this week SNAP  Growing into major role in electronics  Natural evolution of expertise developed on GLAST  Small investment from base, growth to come through LBNL

3/6/2006FY07/08 DOE Budget Briefing8 FY07 Budget Discussion  Changes from FY06 to FY07 (Summary) FY06 Funding: $175.2M Program Changes 06-> M (see slide 9) FY07 Funding Needed:$186.3M FY07 President’s Budget$186.3M  2007 is a year of opportunity! With careful management and close coordination with the national priority setting process, SLAC can help grow programs central to the future of the field.

3/6/2006FY07/08 DOE Budget Briefing9 Program Changes FY06 to FY07 Program Changes in FY07 from FY06M$ Staff Retention 5.0 Power (40 weeks) 4.2 $4M, klystron production and detector upgrade complete (3.2) ILC 2.5 Infrastructure 2.0 Additional offset from LCLS and other programs (3.0) Unallocated resources for other new opportunities 3.6 Total Program Changes11.1

3/6/2006FY07/08 DOE Budget Briefing10 Additional Resources Available in FY07  We will continue to manage the staff size down through attrition and targeted programmatic layoffs In all scenarios anticipate an addition ~$1M will be liberated in this fashion  We will continue to manage the transfer of staff from GLAST and B-factory programs to LCLS, ILC and new initiatives Klystron department manpower Electronics engineering Mechanical engineering

3/6/2006FY07/08 DOE Budget Briefing11 Additional FY07 Priority Program Opportunities  LSST We will compete for additional funds to develop ground based dark energy telescope  ILC We will compete for additional funds to develop the RF sources for the ILC  LCD We will compete for additional funds to grow the Linear Collider Detector effort

3/6/2006FY07/08 DOE Budget Briefing12 FY07 Scenario A$195.3M  B-Factory 40 weeks $4M AIP Int L (Run 6)= 180/fb  ILC $21M ILC program focused on GDE priorities  Assumes successfully compete for additional $6M Increase LCD by $1M after successful competition for additional resources  GLAST Instrument operations preparation, support for I&T, preparation for science  EXO 200 operating Invest in Barium tagging R&D for big EXO  Accelerator R&D Start construction of SABER Support HG program from base resources  LSST Increase by $2.1M assuming successful competition for dark energy resources and encouragement from P5  ATLAS Development of Tier 2 assuming successful proposal FY07 President’s Budget + 5%

3/6/2006FY07/08 DOE Budget Briefing13 FY07 Scenario A$ 195.3M  Opportunities B-factory program focused on maximum luminosity before end of FY08 ILC—focused on RF source development taking advantage of unique SLAC resources (klystron dept) EXO—R&D for ultimate double beta decay expt. Go forward with LSST Go forward with SABER  Healthy running program and growth of new opportunities for field Well aligned with HEP roadmap from P5 FY07 President’s Budget + 5%

3/6/2006FY07/08 DOE Budget Briefing14 FY07 Scenario B$186M  B-Factory 40 weeks $4M AIP Int L (Run 6)= 180/fb  ILC $14.8M program focused on GDE priorities  Assumes unsuccessfully compete for additional resources  May lose opportunity to contribute to ILC power source  GLAST Instrument operations preparation, support for I&T, preparation for science  EXO 200 operating Invest in Barium tagging R&D for big EXO  Accelerator R&D Start construction of SABER Support HG program from base resources  LSST Assume unsuccessful competition for dark energy resources Investment from base program depends on P5 recommendation Would be balanced with investment in EXO R&D  ATLAS Development of Tier 2 assuming successful proposal FY07 President’s Budget

3/6/2006FY07/08 DOE Budget Briefing15 FY07 Scenario B$186M  Opportunities B-factory program focused on maximum luminosity before end of FY08 ILC—target modulator development. Cannot engage in klystron development No increase in LCD R&D above small FY06 base level, risking US leadership on detector development Will be guided by P5 recommendations in determining investments in EXO—R&D vs LSST Go forward with SABER  Healthy running program and limited growth of new opportunities for field Will bring headcount down by additional ~15 to allow for new opportunities FY07 President’s Budget

3/6/2006FY07/08 DOE Budget Briefing16 FY07 Scenario C$176.7M  B-Factory 40 weeks $4M AIP Int L (Run 6)= 153/fb  ILC $12.8M program flat from FY06  Lose opportunities to contribute to power source, Cannot grow modulator program Minimal investment in LCD  GLAST Instrument operations preparation, support for I&T, preparation for science. Lay off all staff coming off instrument integration support  EXO 200 operating R&D unfunded  Accelerator R&D SABER unfunded HG program unfunded  LSST Flat or down depending on P5  Staff measures RIF approximately 60 people, impact B-factory performance FY07 President’s Budget – 5%

3/6/2006FY07/08 DOE Budget Briefing17 FY07 Scenario C$176.7M  IMPACTS(Relative to Scenario B) B-factory integrated luminosity hurt by loss of people due to layoffs Compromise SLAC role in ILC Reduction in staff cripples ability to foster new program initiatives for the field.  No new initiatives supported  What HEP physics will we be doing in 2012? FY07 President’s Budget – 5%

3/6/2006FY07/08 DOE Budget Briefing18 FY08 Budget Discussion  Scenarios for FY08 depend on budget in FY07  Talent lost in FY07 cannot be recaptured in FY08  Will assume Scenario A(+5%) in FY07 for Scenario D(+10%) in FY08  Will assume Scenario B(PB) in FY07 for Scenario E(PB)&F(-5%) in FY08

3/6/2006FY07/08 DOE Budget Briefing19 Changes FY07 to FY08 Changes from FY07 from FY08M$ Staff Retention 5.0 Power (+4 weeks operations) 3.3 Total Changes8.3

3/6/2006FY07/08 DOE Budget Briefing20 FY08 Scenario D$204.6M  B-Factory 44 weeks $3.5M AIP Int L (Run 7)= 366/fb  ILC $24M ILC program focused on GDE priorities (Increase $2M over FY07) LCD held flat at FY07 level  GLAST On orbit operations and beginning of science  EXO 200 operating Continued investment in Barium tagging R&D  Accelerator R&D Complete SABER Phase I (no bypass) Support HG program from base resources  LSST Flat assuming encouragement from P5  SNAP Flat or increase with LBNL support  ATLAS Continued development of Tier 2 Scenario A + 5%

3/6/2006FY07/08 DOE Budget Briefing21 FY08 Scenario D$204.6M  Opportunities Final year of B-factory program focused on maximum luminosity before end of run ILC—continued growth in focused areas EXO—R&D for ultimate double beta decay expt. Continued LSST pre-engineering Completion of SABER Phase I (no bypass) and possible operations of plasma program  Healthy running program and growth of new opportunities for field Well aligned with HEP roadmap from P5 Scenario A + 5%

3/6/2006FY07/08 DOE Budget Briefing22 FY08 Scenario E$186M  B-Factory 44 weeks $3.5M AIP Int L (Run 7)=366/fb  ILC $14.8M program flat from FY07. No LCD growth (continued flat from FY06)  GLAST On orbit operations and beginning of science  EXO 200 operating  Accelerator R&D Unable to complete SABER Phase I (no bypass) No support for HG program  LSST & Big EXO R&D FY06 levels or down depending on P5 recommendations  Staff Measures Approximately 35 layoffs FY08 = FY07 President’s Budget

3/6/2006FY07/08 DOE Budget Briefing23 FY08 Scenario E$186M  Opportunities (Relative to scenario B) Final year of B-factory program focused on maximum luminosity before end of run ILC—no growth, SLAC not in leadership role Operations for EXO 200 Very limited resources for LSST camera construction and/or Big EXO R&D Completion of SABER Phase I (no bypass) not possible  Limited possibilities to future program development or ILC contributions Would narrow program (SABER, EXO, LSST, SNAP, ILC) to focus and make one or two successful FY08 = FY07 President’s Budget

3/6/2006FY07/08 DOE Budget Briefing24 FY08 Scenario F$176.7M  B-Factory 44 weeks $3.5M AIP Int L (Run 7)=311/fb  ILC $8.8M program (reduction of $6M vs FY07) No LCD growth (continued flat from FY06)  GLAST On orbit operations and beginning of science  EXO 200 operating  Accelerator R&D Unable to complete SABER Phase I (no bypass) No support for HG program  LSST & Big EXO R&D, Research Programs Would need to eliminate several efforts to recover $3.5M in resources  Staff Measures Approximately 120 layoffs – or limit B-factory running in FY08  Impact on B-factory performance  Impact on research productivity of lab FY08 = FY07 President’s Budget – 5%

3/6/2006FY07/08 DOE Budget Briefing25 FY08 Scenario F$176.7M  IMPACTS (relative to scenario B) B-factory program reduced  Diminished efficiency due to layoffs of technical staff ILC  SLAC minor role in ILC development, jeopardizing international ILC program GLAST  Cut in operations threatens science productivity of the mission EXO and new initiatives not supported No support to Advanced Accelerator Program  No FFTB replacement Approximately 120 additional staff layoffs needed;  Impacts efficiency of B-factory operations FY08 = FY07 President’s Budget – 5%

3/6/2006FY07/08 DOE Budget Briefing26 Conclusions  SLAC program offers tremendous physics opportunities to national HEP community Program is tight and aggressively managed  FY07 budget and future Office of Science growth offers significant opportunities for SLAC to serve the national program Investments will be aligned with national roadmap for the field