Www.NAEPnet.org. Facilities Institute July 9 - 12, 2012 Houston, Texas Methods of Construction.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Session 8 Implementing PPPs
P ROJECT M ANAGEMENT The FORE SIGHT Partners. The FORE SIGHT Partners 2 Owner Support Professional Services The FORE SIGHT Partners.
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Facilities Excellence Project Delivery Methods Board of Trustees April 12, 2005.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Facilities Institute July , 2012 Houston, Texas Professional Services: How do you get them? Gregory A. (Greg) Pratt, VCO, VCCO.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Selection of Contractor – Step 5 June 2015 Final PD Training FMD WUSM 6/15/15 1.
Construction Engineering 221 Cost Estimating and Bidding.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Construction Contracts and Project Delivery Methods
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Kurt Krause. Topics of Discussion 1.Project Delivery Method Definition 2.Brief History 3.Alternative Project Delivery Trends 4.Key Drivers of APDM 5.Risk.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
CAPITAL PROJECT DELIVERY METHODS APRIL 20, 2015 – SACUBO Annual Conference By Al Stoverink, AVC for Facilities Arkansas State University.
Construction Management At Risk Process
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
Procurement Management
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
PROJECT DELIVERY METHODS
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Request for Proposal - Best Value
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery Systems
Request for Proposal - Best Value
PROJECT DELIVERY METHODS
Presentation transcript:

Facilities Institute July , 2012 Houston, Texas Methods of Construction

Facilities Institute July , 2012 Houston, Texas Gregory A. (Greg) Pratt, VCO, VCCO Assistant Director of Purchasing for Facilities Support Virginia Polytechnic Institute and State University (Virginia Tech)

Facilities Institute July , 2012 Houston, Texas TOPICS: Definitions of the types of construction and the methods which fall under each type. Basic description of the various methods of construction to include some advantages/disadvantages of each. Takeaways: What is of key importance?

Facilities Institute July , 2012 Houston, Texas Capital Versus Non-Capital Construction The type of construction can determine what procurement method is required. Capital Construction: New construction or an expansion, renovation, or replacement project for an existing facility or facilities with a prescribed dollar threshold (Virginia Tech limit >$2 million). Non-Capital Construction: An expansion, renovation or replacement project for an existing facility or facilities with a prescribed dollar threshold (Virginia Tech limit <$2 million).

Facilities Institute July , 2012 Houston, Texas Capital Construction Methods Design-Bid-Build: Design–bid–build also known as the traditional method, is a project delivery method in which the agency or owner contracts with separate entities for each the design and construction of a project. As the name implies there are three main sequential phases to the design–bid–build delivery method: o Design Phase o Bidding Phase o Construction Phase

Facilities Institute July , 2012 Houston, Texas Design-Bid-Build Some of the advantages of design–bid–build: The design team is impartial and looks out for the interests of the owner. The design team prepares documents on which all general contractors place bids. Incomplete, incorrect or missed items are usually discovered and addressed during the bid process (pre-bid meetings). Ensures fairness to potential bidders and it also identifies new potential contractors. Uses competition to improve the efficiency and quality for owners.

Facilities Institute July , 2012 Houston, Texas Design-Bid-Build Some of the disadvantages of design–bid–build: Slowest method due to the fact that design must be completed before you can move to the Bidding phase. Development of a tendency to seek out the lowest cost sub-contractors in a given market. As the general contractor is brought to the team post design, there is little opportunity for input on effective alternates being presented by the general contractor. Pressures may be exerted on the design and construction teams, which may lead to disputes between the architect and the general contractor.

Facilities Institute July , 2012 Houston, Texas Design Build Design-Build (D/B) is a project delivery method used to deliver a project in which the design and construction services are contracted by a single entity known as the design-build contractor. Design-build relies on a single point of responsibility and is used to minimize risks for the project owner and to reduce the delivery schedule by overlapping the design phase and construction phase of a project.

Facilities Institute July , 2012 Houston, Texas Design-Build Design-build is sometimes compared to the "master builder" approach, one of the oldest forms of construction procedures. Historical Note: Comparing design-build to the traditional method of procurement, the authors of "Design-Build Contracting Handbook" noted that: “from a historical perspective the so-called traditional approach is actually a very recent concept, only being in use approximately 150 years. In contrast, the design-build concept–also known as the "master builder" concept—as been reported as being in use for over four millennia."

Facilities Institute July , 2012 Houston, Texas Design-Build Some of the advantages of Design-Build: Single point of Responsibility – D-B is responsible for the success of the entire project. Firm Price Early on – price estimating continually updated through design, reach a firm price estimate before drafting of final construction documents. Value Engineering – Design expert and construction experts are from the same team and working together. Time – Some design phase activities and construction activities can overlap. Also long lead time items can be purchased early in the design phase. Improved Quality – no finger pointing between A/E and Contractor

Facilities Institute July , 2012 Houston, Texas Design-Build Some of the disadvantages with Design-Build: The contractor is deciding design issues as well as issues related to cost, profits and time exigencies. While the traditional method of construction procurement dissociates the designers from the contractors’ interests, design–build does not. Projects that require a complex and elaborated design for aesthetical or technical purposes may be poorly suited to this method. Design–build does not make use of competitive bidding where prospective builders bid on the same design. Criteria to select contractor is subjective and difficult to evaluate and to justify later.

Facilities Institute July , 2012 Houston, Texas CM at-risk CM at-risk is a delivery method which entails a commitment by the construction manager to deliver the project within a Guaranteed Maximum Price(GMP). The construction manager acts as consultant to the owner in the development and design phases, (often referred to as "Preconstruction Services"), but as the equivalent of a general contractor during the construction phase. When a construction manager is bound to a GMP, the most fundamental character of the relationship is changed. In addition to acting in the owner's interest, the construction manager must manage and control construction costs to not exceed the GMP, which would be a financial hit to the CM company. This is the method used predominantly by Virginia Tech.

Facilities Institute July , 2012 Houston, Texas CM at-risk Some advantages of CM at-risk: Increased project speed, initiate portions of the work before final design is achieved. CM chosen based upon qualifications. Guaranteed maximum price. CM is chosen before design is finalized, allows for collaboration. Transparency as all costs and fees are in the open.

Facilities Institute July , 2012 Houston, Texas CM at-risk Some disadvantages of CM at-risk: If you receive your GMP before design is complete you could face some cost overruns If bid packets come in higher than expected, we face pressure to reduce the scope of work to “fit” within the guarantee.

Facilities Institute July , 2012 Houston, Texas Non-Capital Construction Job Order Contracting Job order contracting (JOC) is a way to get numerous, commonly encountered construction projects done quickly and easily through multi-year contracts. JOC reduces unnecessary levels of contract procurement time by awarding term contracts for a wide variety of renovation, repair and construction projects. JOC contractors are selected on qualifications and performance at a best value or low price or low bid depending on local, state or federal statutes. JOC is about performance, reliability, dependability and quality. At the same time, JOC is about results and working within budget and time constraints. The JOC contractor provides “on call” construction services from concept to close-out.

Facilities Institute July , 2012 Houston, Texas Job Order Contracting (JOC) Some advantages of job order contracting: Fast and timely delivery of projects. Development of a partner relationship based on work performance. Simplified design documents and acquisition processes negate the need for complicated and repetitive contract documents and reduce contract administrative costs. Employment of smaller subcontractors in the area to perform the work, allowing for the majority of the project funds to be spent locally. This method may contain Diversity components as well. A win–win attitude or motivation for both the contractor and the facility owner produced by and through the long-term relationship.

Facilities Institute July , 2012 Houston, Texas Job Order Contracting (JOC) Some disadvantages of Job Order Contracting: Limited capacity. May be more expensive than “open” competitive bidding. Contractor may become too familiar.

Facilities Institute July , 2012 Houston, Texas Competitive Bidding Competitive Bidding, also known as Commercial Bidding is a common process for completing individual projects. The process involves either a Sealed or Unsealed bid (determined by the estimated value of the project) and is built around a completed design. The A/E firm who completed the design typically also assists with the bidding process; performing such roles as assisting with project advertisement, identifying bidders,

Facilities Institute July , 2012 Houston, Texas Competitive Bidding co-conducting pre-bid meetings, assisting or issuing bid addenda, verifying bid prices and contractor qualifications, etc. Typically utilized for projects over a pre-set threshold up to the limit for Capital construction. In Virginia Tech’s case, we typically perform these bids over $300k up to $2 million. We tend to commercially bid all roof projects.

Facilities Institute July , 2012 Houston, Texas Competitive Bidding Some of the advantages of Competitive Bids: Better pricing - given enough time, pricing tends to improve (if we initiate bidding process early enough to allow contractors adequate time to complete the project). Identify new contractors whom you have not dealt with before (double edged sword!). Can help with Diversity efforts. Avoids Scope creep (firm design plan).

Facilities Institute July , 2012 Houston, Texas Competitive Bidding Some disadvantages of Competitive Bids: Slow process…design has to be complete prior to bidding. Bonding process adds additional steps/cost. Tendency to get low price as well as low quality if specifications are not well written. Bidding is open to ALL properly licensed, properly insured, responsible and responsive bidders; may attach contractors with no experience in working on/with Higher Ed.

Facilities Institute July , 2012 Houston, Texas Term Contracts for Services Term contracts for services, also known as “Time & Materials” can be a tool in completing non-capital construction projects. Term contracts for such services as Mechanical, Electrical, Carpentry, Drywall, Ceiling Tile and Flooring, etc., can be great methods to accomplish our construction needs. Acquisition of these services can follow either the Invitation for Bid or Request for Proposal process and utilized pre- established hourly rates. Historically Virginia Tech has utilized the RFP process to allow us to consider qualifications other than just price.

Facilities Institute July , 2012 Houston, Texas Term Contracts for Services Some of the advantages of Term Contracts: Project speed, able to initiate the project quickly. Confidence in the Term Contractor. Familiarity with your campus. Price of the project, reduced number of Change Orders. Qualifications of Contractors considered in the selection process.

Facilities Institute July , 2012 Houston, Texas Term Contracts for Services Some of the disadvantages of Term Contracts: Capacity of the contractor. Pricing may be higher than a competitive bid. Aspects of the project outside a given Term Contract scope. Coordination of the various disciplines. Who gets the blame on projects which involve multiple term contractors. Who coordinates/supervises the project? Scope creep.

Facilities Institute July , 2012 Houston, Texas Methods of Construction: Summary: Key Takeaways: o What procurement options exist? o Project particulars will determine the best method. o Having multiple options is essential.