Requirements for the Establishment of Mercury Monitors in Mexico as a Pilot Project Identification of the Technical Design of the Monitoring Pilot Project.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

A forum for coordinating state, federal, and tribal watershed and salmon monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring.
The Roadmap to Successful Xpert Implementation - 37 steps -
International Course on Development and Disasters with Special Focus on Health February 10 – 21, 2003: St Anns, Jamaica CDERA Experience in Institutional.
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Actual groups of customers The determination of heavy metals related to monitoring of the environment has gained increasing interest. Our new method enables.
Chapter 13 Survey Designs
1 Assessment: Audits. Assessment: Audits - Module 9 2 Learning Objectives At the end of this activity, you will be able to: Develop a process to prepare.
Oman Energy & Water Conference Exhibition May 19-21, 2015
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Documents and Records-Writing a Quality Manual-Module 16 1 Quality Manual Structure and Contents Quality Manual Structure and Contents - optional.
1 Module PLANNING AND ORGANIZING EXTERNAL QUALITY ASSESSMENT.
Survey Designs EDUC 640- Dr. William M. Bauer
Mercury in Fish. Where Does Mercury Come From? Natural Sources: Soils and rocks Wildfires Man-Made Sources: Burning coal and medical waste Manufacturing.
The Quality Management System
Preliminary Assessment Tribal Emergency Response Preparedness Dean S. Seneca, MPH, MCURP Agency for Toxic Substances and Disease Registry Centers for Disease.
Census Census of Population, Housing,Buildings,Establishments and Agriculture Huda Ebrahim Al Shrooqi Central Informatics Organization.
Power Point Slides by Ronald J. Shope in collaboration with John W. Creswell Chapter 13 Survey Designs.
Visit us at E mail: Tele: www.globalmanagergroup.com.
Roger Miller, Arkansas Department of Environmental Quality Barry Jackson, USGS Arkansas Water Science Center ARKANSAS EXCHANGE NETWORK FOR GROUNDWATER-QUALITY.
OPERATIONAL PROGRAMME Information Society 3rd Community Support Framework for Greece June 2001.
Project Implementation Plan and Principal Activities
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Institutional Evaluation of medical faculties Prof. A. Сheminat Arkhangelsk 2012.
Malé Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Presentation on the Bangladesh National.
ICP Waters International Cooperative Programme Assessment and Monitoring Effects of Air Pollution on Rivers and Lakes Activities and plans 2014 Gunnar.
Workshop on Interaction between Air-Quality Monitoring and Air-protection Strategies in EECCA Countries UN ECE WGEMA, June 11, 2007 Draft Strategy for.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Malé Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Presentation on the Bangladesh National.
WMO Blue Peace - Water Security in the Middle East: Strategic Management of Hydrological and Meteorological Data and Information Product Generation Al-Hamndou.
International Centre for Integrated Mountain Development Kathmandu, Nepal Malé Declaration Implementation in NEPAL Pradeep Dangol.
North American Commission For Environmental Cooperation Chemicals Management in Mexico Chemicals Management in Mexico M AURICIO LIMÓN AGUIRRE Under Secretary.
Infrastructure Projects Facility Regional meeting for Senior Officials from SEE and Donor’s Community Brussels 28 November 2008 Rachele Gianfranchi.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
NATIONAL METEOROLOGICAL SERVICE PARTICIPATION IN NAME Fifth Meeting of the NAME Science Working Group Puerto Vallarta, Mexico Miguel Cortez-Vázquez.
Why Participate in the WLA? Utility Perspective Preparation Emergency Response Plan Resources.
The Health District Learning objectives What is a health district Why do we focus on the health district What are the tasks of a health district What.
Towards Green ICT strategies: Government paving the way - Ghana Environmental Protection Agency and VODAFONE (Ghana) Collaboration At: Fifth ITU Symposium.
Technical Track Work Group Report Out August 22, 2012.
A Framework for Monitoring March 26, Mission: Provide a national forum to coordinate consistent and scientifically defensible methods and strategies.
NWQMC July 26, 2005 Developing A National Water Quality Monitoring Network Design.
Laboratory Results and Operations in WHO Phase 6 Dr. Attaporn Taweetungtragoon CYBELES Phnom Penh, Cambodia October 12-15, 2009.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
Malé Declaration Joint Training on Regional Refresher Course and Soil Acidification Asian Institute of Technology (AIT), Bangkok, Thailand from
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
INDOFLUX NETWORK POSSIBLE CONTRIBUTION OF RRL BHUBANESWAR DR. G. ROY CHAUDHURY SCIENTIST REGIONAL RESEARCH LABORATORY, BHUBANESWAR.
National and regional activities for environment observations Natalya Shulgina Uzhydromet World Environmental Day Round Table GEO CBC7 Meeting 5 June,
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
D. Gay, Schmeltz, Sharac, Nat. Tribal Conf. for Env. Management, Billings, MT, June 26, 2008, Slide 1 Current Mercury Monitoring Approaches in Tribal Country.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
Annual Network Meeting:2004 Male Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Project.
Strategies For Linking Atmospheric Deposition Networks to the National Water Quality Monitoring Network Mark Nilles Office of Water Quality U.S. Geological.
Recommendations for Applying the Critical Elements Methodology.
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
Integrating a Continuous Water Quality Monitoring Network into Texas’ Surface Water Quality Monitoring Program Jill D. Csekitz, Aquatic Scientist Texas.
HEALTH IMPACT ASSESSMENT: WHAT WE SHOULD DO IN MEXICO JULIETA PISANTY-LEVY.
Update on the NADP Atmospheric Mercury Initiative Developing a new coordinated and collaborative approach to atmospheric mercury monitoring A Briefing.
Air Quality and Seney National Wildlife Refuge Jill Webster June 14, 2007.
Power Point Slides by Ronald J. Shope in collaboration with John W. Creswell Chapter 13 Survey Designs.
Meeting to Strengthen the Capacity of Chemical Risk Assessment in LAC PAHO, December th, 2013 PAHO’s ANTECEDENTS ON TDS & INFORMATION ON LABORATORY.
Preliminary Assessment Tribal Emergency Response Preparedness
National Workshop on Planning for the GEOHealth Hub for Interdisciplinary Research and Training Policy, Regulatory and Organizational Frameworks Getnet.
UNEP Global Partnership for Mercury Air Transport and Fate Research: U
(Public Sector Linkage Programme)
Mercury in Fish.
Status and Plan of Regional WIGOS Center (West Asia) in
Country Experiences in Mitigation Assessment : Republic of Korea
Presentation transcript:

Requirements for the Establishment of Mercury Monitors in Mexico as a Pilot Project Identification of the Technical Design of the Monitoring Pilot Project for Wet Deposition of Mercury in Mexico ANNE M. HANSEN, MANFRED VAN AFFERDEN

General Project Objective Identify the requirements for the establishment of mercury monitors in Mexico as a pilot project in collaboration with key agencies in Mexico and liaising with appropriate Canadian and US authorities as well as private sector contractors.

What is the big idea?

Extension of Mercury Deposition Network Integration of Mexican sampling stations into the existing network Intensification of future collaboration in prevention of exposure

Installation of two wet-deposition monitors MDN requires two different instruments for the collection and measurement of precipitation: An electrically powered collector that automatically collects precipitation samples for mercury analysis A raingage that mechanically measures and records the amount of precipitation An electrically powered collector that automatically collects precipitation samples for mercury analysis A raingage that mechanically measures and records the amount of precipitation Raingage Collector

Sample and data handling Weekly precipitation samples should be collected every Tuesday and mailed to the Mercury Analytical Laboratory at Frontier Geosciences (USA) for analysis by cold vapor atomic fluorescence spectrometry. The MDN provides data for total mercury, but will include methylmercury if desired by a site sponsor. Field bucketEvent recorder trace

Why install mercury monitors in Mexico?

Deposition of Mercury

General NADP Monitoring Objectives To characterize geographic patterns and temporal trends in biologically important chemical deposition. To support research activities related to: The productivity of managed and natural systems; The chemistry of surface and ground waters, including estuaries; The health of domestic animals, wildlife, and fish; Human health. (Dossett and Bowersox, 1999)

General Mexican Objectives General Mexican Objectives Assess mercury exposure rates to ecosystems and human populations through mercury wet deposition in Mexico; Evaluate the effects of emissions reduction and control on a long term basis; Identify main mercury transport routes; Fulfill international commitments; Increase Mexican capacity in the assessment of mercury deposition and effects.

Who will be responsible?

Responsibilities in Mexico

The responsibilities of monitoring mercury in wet deposition is not clearly defined Potential future responsible institutions: Semarnat: Has the principal responsibility Semarnat: Has the principal responsibility CNA: National Water Commission National Meteorological Service (SMN) INE: National Institute of Ecology CENICA

Where to install the monitors?

Automatic Hydro- meteorological Stations (AHSs)(60) Automatic Hydro- meteorological Stations (AHSs)(60) Meteorological Observatories (82) Meteorological Observatories (82) Strategy of site selection Far from Mercury point sources in order to measure Far from Mercury point sources in order to measure background levels background levels On or close to the site of already existing meteorological stations or observatories On or close to the site of already existing meteorological stations or observatories

(modified according to Bigelow et al. 2001) NADP/NTN site selection criteria Regional Regional Local Local On-site On-site

Specific Mexican Site selection criteria Accessibility and infrastructure (courier mail service, electricity, telephone, laboratory) Accessibility and infrastructure (courier mail service, electricity, telephone, laboratory) An operator lives on or very close to the site An operator lives on or very close to the site

Site selection procedure 1 st step: Application of regional requirements (20 and 50 km) From the 142 sites (AHS, MO) 108 stations were excluded From the 142 sites (AHS, MO) 108 stations were excluded 2 nd step: Application of Mexican requirements (operator) From the AHSs only 16 fulfill the condition of potential operators living close to the site From the AHSs only 16 fulfill the condition of potential operators living close to the site 3 rd step: Application of local and on-site requirements (telephone) From these 16 sites only 6 do not fulfill these requirements From these 16 sites only 6 do not fulfill these requirements 4 th step: Presence of chemical lab for major ions Among the final 10 stations, only 4 have a chemical laboratory close by Among the final 10 stations, only 4 have a chemical laboratory close by 5 th step: On-site verification and evaluation of 2 sites On-site verification and evaluation of 2 sites

Cd. Constitución Huejutla Tecamachalco Puerto Ángel Location of the preselected sites

On-site evaluation of Huejutla-site

On-site evaluation of Puerto Ángel-site

Who will participate?

Project Coordination Steering Committee Steering Committee NADP, INE, NACEC (Mercury, M&A Task Forces) Technical Project Management Technical Project ManagementIMTA Equipment and Analysis Equipment and Analysis NADP, Frontier Geosciences among others

On-site Institutions Huejutla: SMN-CNA, Instituto Tecnológico Agropecuario (operator Biol. Alejandra López Mancilla) Cd. Huejutla: SMN-CNA, Instituto Tecnológico Agropecuario (operator Biol. Alejandra López Mancilla) Cd. Puerto Angel: SMN-CNA (operator Ing. Ulises López Rodríguez) Puerto Angel: SMN-CNA (operator Ing. Ulises López Rodríguez) Constitución: SMN-CNA (operator Javier Martínez Arreola) Constitución: SMN-CNA (operator Javier Martínez Arreola) Tecamachalco: SMN-CNA, Universidad Tecnológica (operator M.C. Ofelia Araceli López Mejía) Tecamachalco: SMN-CNA, Universidad Tecnológica (operator M.C. Ofelia Araceli López Mejía)

Capacity building US / Canadian Institutions Training courses: On-site: Installation, initial sampling phase, maintenance US/Canada: Wet deposition, sampling and maintenance, interpretation of results US/Canada: Clean - Lab analysis On-site supervision: Routine operation and quality control

How much will it cost?

Costs for an extended, subsidized pilot project (US$) Equipment 9,100 Balance, conductance meter and electrode, pH meter and electrodes, lab-material Installation 12,000 Site preparation and modification, platform, shipping, custom liberation Installation 12,000 Site preparation and modification, platform, shipping, custom liberation Operation 38,220 Shipping, personnel, communication, office supply, maintenance and materials Operation 38,220 Shipping, personnel, communication, office supply, maintenance and materials Capacity building 16,100 Training courses, on-site supervision Capacity building 16,100 Training courses, on-site supervision Analysis 43,680 Mercury (free), methylmercury, major ions Analysis 43,680 Mercury (free), methylmercury, major ions Technical project management 67,300 Personnel, per diem, transportation, telephone Technical project management 67,300 Personnel, per diem, transportation, telephone Total186,400 Total186,400

When may it start?

Steering committee Ing. José Luis Razo Quvedo Ing. Gloria Herrera Ing. Ulises LópezRodríguez Javier Martínez Arreola M.C. Ofelia Araceli López Mejía Ing. Ángel Barrera Morteo Ing. Orlando Quintero Martínez Biol. Alejandra LópezMancilla Right now? Heavy rain