Unit 7 Assignment Project Progress Report Charles W. Jansen, II

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Chapter 3: Planning a Network Upgrade
District Information Technology Update Report Late August 2014 Complied By: Stephen Torrey
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Investigations Rick Finnegan April 22, 2008.
Project Changes Charles W. Jansen, II Kaplan University IT Bachelors Capstone in Information Technology Instructor: Allison Selby June 14, 2012.
Project Overview Fairfax Infrastructure Upgrades, Phase 2 John Hanks.
1 Configuring Internet- related services (April 22, 2015) © Abdou Illia, Spring 2015.
CS 325: Software Engineering April 7, 2015 Software Configuration Management Task Scheduling & Prioritization Reporting Project Progress Configuration.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
Voice Over IP Proposed by Tom Anderson, Craig Schurr, Heather Hapes, Anthony Lucas, and Mauro Gonzalez.
1 Chapter 8 Local Area Networks - Internetworking Data Communications and Computer Networks: A Business User’s Approach.
Planning. SDLC Planning Analysis Design Implementation.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
And how they are used. Hubs send data to all of the devices that are plugged into them. They have no ability to send packets to the correct ports. Cost~$35.
Virtual Company Group 8 Presentation Date: June /04/2017
ESubnet Enterprises Inc. Richard Danielli, eSubnet Higher sales volumes through high network availability INTIX 2010.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
DUE Voice over IP (VoIP) Linksys Ernie Friend- FSCJ.
Solutions for BDMHS  JF&C is a highly qualified company that performs a wide variety if technical services in the Chicago land area to business, government.
Information Technology Study Fiscal Crisis and Management Assistance Team (FCMAT) Las Virgenes Unified School District Presented By: Leslie Barnes Steve.
Natick Public Schools Technology Update April 23, 2007 Dennis Roche, CISA Director of Technology.
Identifying Main Concept on Capstone Project Charles W. Jansen, II Kaplan University IT Bachelors Capstone in Information Technology Instructor:
Computer Support for the Atlanta Day Shelter for Women and Children.
Staff Project Progress Report Charles W. Jansen, II Kaplan University IT Bachelors Capstone in Information Technology Instructor: Allison Selby July.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Business Data Communications, Fourth Edition Chapter 11: Network Management.
Cisco 3 - Switch Perrine. J Page 111/6/2015 Chapter 5 At which layer of the 3-layer design component would users with common interests be grouped? 1.Access.
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Module 1 Introduction to Designing a Microsoft® Exchange Server 2010 Deployment.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Summer Internship Tremaine A. Lewis FL Dept. of Financial Services (FLDFS) Tallahassee, FL May 1, 2005 – August 26, 2005.
Data Communications & Computer Networks, Second Edition1 Chapter 8 Local Area Networks: Internetworking.
Module 12: Implementing ISA Server 2004 Enterprise Edition: Back-to-Back Firewall Scenario.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
Educause Security 2006 © Baylor University Security Assessments for Information Technology Bob Hartland Director of IT Servers and Network Services.
T4L – NSW DET SOE NSW DET SOE SOE was developed in open consultation with TAFE, Schools, Other personnel Developed to provide single BASE image.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Project Information. Contact Information Project Being Developed.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Investigations Rick Finnegan April 22, 2008.
Technology and User Support Breakout Session SVRS Conference for Wisconsin County Clerks May 4, 2005 – May 5, 2005.
Supply and installation the phone (wire's phone) and the system.
Business Project Plan Post Implementation Evaluation Report (PIER) Richard M Wells | Pilgrim’s Pride.
«My future profession»
CMGT 410 aid Education Begins/cmgt410aid.com

Information Technology (IT) Department
Implementing TMG Server Publishing
CIS 332 Competitive Success-- snaptutorial.com
CMGT 410 Education for Service-- snaptutorial.com.
NTC 320 Competitive Success-- snaptutorial.com
NTC 320Competitive Success/snaptutorial.com
CIS 332 Education for Service-- snaptutorial.com
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
NTC 320 Education for Service-- snaptutorial.com
NTC 320 RANK Knowledge is divine-- ntc320rank.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
CIS 332 Teaching Effectively-- snaptutorial.com
NTC 320 Teaching Effectively-- snaptutorial.com
NTC 320 Education for Service-- snaptutorial.com
CIS 332 Inspiring Innovation-- snaptutorial.com
Public Employees Retirement Association Infrastructure Upgrade
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … Presented by Robert Freeman (
Planning a Network Upgrade
Net 412 (Practical Part) Networks and Communication Department LAB 1.
Xoserve IX Refresh Customer Update 03/01/2019.
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

Unit 7 Assignment Project Progress Report Charles W. Jansen, II Kaplan University IT499-01 Bachelors Capstone in Information Technology Instructor: Allison Selby June 27, 2012

(Fictitious network consultant) 6838 Old Banyan Way Naples, FL 34109 (239) 273-8604 chuckamania@chuckamania.net

Project Client (fictitious) Current company profile Company Produces: Video Games Commercials Documentaries Video Restoration & Transfer Service 70mm 35mm 16mm 8mm Patch Productions 1066 Big Picture Blvd Naples, FL 34104 (239) 555-1066 Currently employs several hundred people Will add over one hundred new hires

Project Progress Report As of June 27, 2012 The progress report for the Patch Production Network Upgrade will show how the project is proceeding. Progress will show: What changes have been made. What tasks have been completed. What milestones have been met. What tasks remain. The original timeline and an updated timeline.

Project Goal Add new department for developing theatrical film production offices. Chuckamania Productions will install network equipment in the building. Equipment will include: Routers Switches Wiring Closet New IP addressing scheme Servers, computers and printers will be provided by separate firms. IPS and Firewall services will be provided by Corero Network Security

Project Impact The project is progressing and when finished will provide Patch Productions personnel a secure environment for developing a motion picture division. The network will have the necessary bandwidth to carry the high volume of network traffic. The router and switch configuration will automatically manage the network traffic providing priority ratings to different types of traffic. Congestion at peak operation will be avoided because of the bandwidth available.

Tasks Completed Key SD is Start Date ECD is Estimated Completion Date Milestone Status SD ECD AFD Create Project Charter Complete 5/21/2012 5/25/2012 Deliver Project Charter u 5/28/2012 Perform Network Inspection 5/29/2012 5/30/2012 Gather Information Network Analysis 6/4/2012 6/5/2012 Deliver Network Analysyis Report 6/7/2012 6/6/2012 Create Specifications 6/8/2012 6/14/2012 Deliver Implementation Plan 6/12/2012 Deliver Specification Report 6/15/2012 Order Equipment Create Configuration 6/18/2012 6/21/2012 Deliver Configuration 6/22/2012 Receive Equipment Lab Configuration and Testing 80% Complete 6/25/2012 6/29/2012 Deliver Lab Certification To be completed 7/2/2012 Configuration Adjustments 7/5/2012 7/6/2012 Installation and Testing 7/9/2012 7/12/2012 Deliver (handover) Installed Network 7/13/2012 Assemble and Edit Documentation 7/16/2012 7/20/2012 Deliver Documentation 7/23/2012 Closeout Project 7/24/2012 As of EOD 6/28/2012 Key SD is Start Date ECD is Estimated Completion Date AFD is Actual Completion Date

Changes Implemented Change Order One Change Order Two Reduced meeting times Reassigned project team member Gloria Howard Brought in new project team member Raiko Nakamura at less hours net Change Order Two Eliminated 4 Cisco Catalyst WS-C3750X-48T-L switches Replaced with 4 Cisco Catalyst C2960 S-48TS-L switches

Milestones Met Delivered the Project Charter on time Delivered the Network Analysis report on time Delivered the Implementation Plan Delivered the Specification report on time Delivered the Configuration report on time

Old Timeline

Updated Timeline

Review of Progress The project is on schedule for completion by the planned date. Changes have been made and spelled out in previous MS PowerPoint presentation and those changes will not affect the success of the project. Milestones have been met as scheduled. The network will meet or exceed network users needs.

Outstanding Items to Complete Lab configuration 20% remaining Deliver lab certification u Configuration adjustments Installation of network equipment and testing Handover installed network upgrade u Assemble and edit documentation Deliver documentation u Closeout project

Questions Address questions to Chuck Jansen II chuckamania@chuckamania.net