Doc.: VC1_10072005_LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Advertisements

Doc.: ec EC Submission 2 nd VC Slides for EC Workshop Discussion Topics Date: November 12 th, 2011 Author: Matthew Sherman Vice Chair, IEEE.
July 2010 Notes on IEEE 802 Rules Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE 802 EC-12/0008r0 Agenda February 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE 802 EC-11/0007r0 Submission March 2011 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items March 2011 Date: Authors:
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer
Doc.: IEEE /1060r1 Submission Sept 2008 Jon Rosdahl, CSRSlide 1 P&P Status and Updates Sept08 Date: Authors:
Doc.: IEEE /1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 1 P&P Status and Updates Sept08 Date: Authors:
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Doc.: IEEE /0545r0 Submission May 2009 Jon Rosdahl, CSR WG Patent Slides and P&P Status Date: Authors:
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
Doc.: IEEE /0559r0 Submission May 2008 Terry L Cole, AMDSlide 1 WG Technical Editors Opening Report (May) Date: Authors:
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2007 Slide 1 EC LMSC Policy and Procedures Update Date: July 16 th, 2007 Author: Matthew.
Doc.: VC1_ _r2_EC_Closing_Motions.ppt Submission 1 st Vice Chair Closing Motions Date: November 20 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author:
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs & Stuart J. Kerry, Philips Slide 1 SEC Motion For the Chair of IEEE 802 LMSC.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 Keep 802 Together Proposal Date: March 15, 2003 Point of Contact:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs Slide 1 Issues with P&P Review Requirments Date: March 18 th, 2003 Authors:
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
The Policies and Procedures of the IEEE 802 LMSC 15-March-2004.
The Policies and Procedures of the IEEE 802 LMSC 17-March-2008.
Doc.: IEEE /1438r0 Submission November 2008 Jon Rosdahl, CSRSlide EC Material Date: Authors:
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0085r0 Submission Nov 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report Jan 2014 Date: Authors:
Doc.: IEEE /0227r0 Submission March 2010 Adrian Stephens, Intel CorporationSlide 1 Adrian Stephens nominee statement for Working Group.
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
March 2010 Plenary Session Notes on IEEE 802 Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date.
Doc.: IEEE /0976r0 Submission September 2015 D. Stanley HP-Aruba Networks 2 nd Vice Chair Report September 2015 Date: Authors: Slide.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: November 14 th, 2005 Author:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 Motions Internal for LMSC 1 st Vice Chair (And supporting slides)
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission November, 2007 Slide 1 EC Update on LMSC Policy and Procedures Date: November 12 th, 2007 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
Month Year IEEE Motions in July, 2017 Plenary
LMSC Policies and Procedures Subcommittee Inputs
Proposal for P&P Change - #2009-1
IEEE P Motions at the July Plenary EC Meeting
LMSC P&P Issues for Closing Plenary
EC LMSC Policy and Procedures Update
IEEE Motions at the November Plenary EC Meeting
IEEE Motion at the February EC Telecon
1St Vice Chair Update Date: Authors: July 2009 July 2009
IEEE Motion at the July EC Closing Meeting
<month year> doc.: IEEE < e> <September 2018
<month year> doc.: IEEE < e> <March 2016>
IEEE Motion at the February EC Telecon
LMSC Policy and Procedures Update
EC Update on LMSC Policy and Procedures
LMSC Policy and Procedures Update
Policies and Procedures Status and Plans
EC Opening Meeting Update on IEEE 802 LMSC Rules
EC LMSC Policy and Procedures Update
IEEE P Motions at the July Plenary EC Meeting
Motions Internal for LMSC 1st Vice Chair (And supporting slides)
Avoiding unnecessary delays in the WG Letter Ballot process
1st Vice Chair Closing Motions
IEEE P Motions at the July Plenary EC Meeting
EC Closing Report on Rules
EC Update on LMSC Policy and Procedures
Month 2000 doc.: IEEE /xxx November, 2005 Open season on the P&P
Presentation transcript:

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew Sherman 1 st Vice Chair, IEEE 802 BAE Systems - CINR

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 2 What are the LMSC P&P? P&P is short hand for Policies and Procedures LMSC P&P are the rules that govern the IEEE 802 LMSC LMSC P&P can be found at – Working groups also have P&P Other Governance documents from –IEEE Standards Association –IEEE Computer Society

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 3 Status on P&P Restructuring

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 4 Rationale for Restructuring P&P Current P&P has been patched for 20 years –Inconsistencies have crept in P&P viewed as Broken by many Executive Committee (EC) members –Identified as single most critical issue during 802 restructuring discussions Unable to keep up with number of revisions required –Was doing 3+ revisions per plenary cycle Did not keep up with revisions required SA Rules have changed over time –Need through review to check compliance CS SAB recently completed complete rewrite of their rules –Requirements impact our rules AUDCOM has model Sponsor P&P and now reviews our P&P –Complying with AUDCOM model should ease approval our our P&P Restructuring of Rules required to accommodate these issues

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 5 Restructuring Process Reformat to match Sponsor Model (1 Cycle) –Editorial in Nature Modify for conformance (1 Cycle) –Identify where requirements of SA and CS SAB not met –Introduce changes to bring into conformance Streamline (12 Cycles) –Implement Less is More –Fix any deficiencies specific to 802 –Reduce backlog of P&P revisions Entire process to take roughly 16 months –Extend 4 months for streamlining YOU ARE HERE IN 2 ND CYCLE

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 6 Current LMSC P&P Revision Ballots P&P are updated via EC letter ballots and votes –Process defined in the LMSC P&P –Can be monitored via EC Archieve In Process streamlining ballots (Vote for balloting Friday) –WG Membership & Meetings (Matthew Sherman) –LMSC Procedures & Process (Matthew Sherman) –LMSC Organization (Matthew Sherman) –Miscellaneous (Matthew Sherman) Other Ballots –Procedure for PARs (Tony Jeffree)

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 7 All P&P Revs Must be Approved by Vote of EC Current Revisions will all be voted at Closing EC meeting Friday 7/22/05 Open to IEEE 802 Attendees

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 8 Next Steps Continued restructuring at a slower pace –WG Model P&P Improvements –Task Group membership? Ability to opt out of ballots not of direct interest Others? –As brought forward by EC members or WG

doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 9 Questions? Contact Matthew Sherman