Doc.: VC1_16112009_EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,

Slides:



Advertisements
Similar presentations
Doc.: IEEE EC-10/0016r1 Meeting Agenda Oct 2010 Jon Rosdahl, CSRSlide 1 EC Interim – 5 Oct 2010 Date: Authors:
Advertisements

Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Doc.: ec EC Submission 2 nd VC Slides for EC Workshop Discussion Topics Date: November 12 th, 2011 Author: Matthew Sherman Vice Chair, IEEE.
July 2010 Notes on IEEE 802 Rules Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE 802 EC-12/0008r0 Agenda February 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE nan Submission September 2008 Phil BeecherSlide SG-NAN closing report for Waikoloa, HI, Sept 2008 Date: 11-sept-2008.
Ec-12-0xyz EC Rules November 2012 James Gilb (Tensorcom) IEEE 802 Rules Update November 2012 meeting.
Doc.: IEEE 802 EC-11/0007r0 Submission March 2011 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items March 2011 Date: Authors:
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec Title: Security TG Closing Note Date Submitted: January 22, 2009 Presented at IEEE
Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: IEEE /1211r0 Submission November 2010 Stephen McCann, RIMSlide 1 TGu Agenda Date: Authors:
Doc.: IEEE /398-r0 Submission July 2001 Vic Hayes, Agere SystemsSlide 1 Closing Report of Radio Regulations to Plenary Working Group meetings.
Doc.: IEEE /1060r1 Submission Sept 2008 Jon Rosdahl, CSRSlide 1 P&P Status and Updates Sept08 Date: Authors:
Doc.: IEEE /1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 1 P&P Status and Updates Sept08 Date: Authors:
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
Doc.: IEEE /0545r0 Submission May 2009 Jon Rosdahl, CSR WG Patent Slides and P&P Status Date: Authors:
Doc.: IEEE /0953r0 Submission Sept 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Sept 2009 Date: Authors:
Doc.: IEEE /0953r1 Submission November 2009 Adrian Stephens, Intel CorporationSlide TGmb Editor Report - Nov 2009 Date: Authors:
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE /0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGn Editor Report May 2009 Date: Authors:
Doc.: IEEE /1184r0 Submission September 2008 Peter Ecclesine, Cisco SystemsSlide 1 M.1801 ad hoc Waikoloa report Date: Authors:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
Emergency Services EC SG Report to 802 EC Geoff Thompson/Interdigital Study Group Chair (as appointed by 802 chair) 802 Executive Committee Friday Session.
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2007 Slide 1 EC LMSC Policy and Procedures Update Date: July 16 th, 2007 Author: Matthew.
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
Doc.: VC1_ _r2_EC_Closing_Motions.ppt Submission 1 st Vice Chair Closing Motions Date: November 20 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author:
Doc.: IEEE /0943r0 Agenda September 2013 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmc September 2013 Agenda Date: Authors:
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 Keep 802 Together Proposal Date: March 15, 2003 Point of Contact:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs Slide 1 Issues with P&P Review Requirments Date: March 18 th, 2003 Authors:
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
Doc.: IEEE /1562r2 Submission Nov 2011 Adrian Stephens, Intel CorporationSlide Nov 2011 Closing Plenary Motions Date: Authors:
0 - 0.
WG Agenda and Opening Report Beijing Interim May 2014
Doc.: IEEE /1438r0 Submission November 2008 Jon Rosdahl, CSRSlide EC Material Date: Authors:
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
Omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report Chair: Max Riegel (NSN)
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0085r0 Submission Nov 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report Jan 2014 Date: Authors:
Doc.: IEEE /0227r0 Submission March 2010 Adrian Stephens, Intel CorporationSlide 1 Adrian Stephens nominee statement for Working Group.
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE /1167r0 Submission November 2009 Osama Aboul-Magd (Samsung)Slide 1 TGac Ad Hoc Group Operation and Chair Selection Procedure Date:
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Addition 1’s to 20.
Week 1.
Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
Doc.: IEEE /1586r0 Agenda January 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
March 2010 Plenary Session Notes on IEEE 802 Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date.
Doc.: IEEE /0011r00 Submission March 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the March EC Closing Meeting IEEE P Wireless.
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: November 14 th, 2005 Author:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 Motions Internal for LMSC 1 st Vice Chair (And supporting slides)
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission November, 2007 Slide 1 EC Update on LMSC Policy and Procedures Date: November 12 th, 2007 Author:
TGn Chair’s Status Update
EC LMSC Policy and Procedures Update
IEEE Motions at the November Plenary EC Meeting
1St Vice Chair Update Date: Authors: July 2009 July 2009
TGn Chair’s Status Update
EC Update on LMSC Policy and Procedures
EC LMSC Policy and Procedures Update
1st Vice Chair Closing Motions
EC Closing Report on Rules
EC Update on LMSC Policy and Procedures
Presentation transcript:

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair, IEEE 802 BAE Systems - ES

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission LMSC Governance Status Current IEEE 802 Sponsor (LMSC) P&P and OM can be found at – – 11/LMSC_OM_approved_ pdf AudCom is requiring Working Group (WG) P&P –Requirement effective March 31, 2009 –Checks starting March 2010 LMSC focus is to have an LMSC WG P&P in force by March 2010 –applicable to all LMSC WG –WG can supplement LMSC WG P&P with WG OM Current process will produce LMSC WG P&P by November 2009 –March 2010 is fall back if we miss November 2009 Latest drafts will be posted to EC Doc server today as (latest rev) –ec EC Draft revision of LMSC PandP –ec EC Draft revision of LMSC OM –ec EC Draft LMSC WG PandP February 14 Matthew Sherman, BAE SystemsSlide 2

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission February 14 Matthew Sherman, BAE SystemsSlide 3 WG P&P Development Process AudCom WG Baseline P&P WG Baseline + Relevant LMSC P&P Content LMSC P&P Extract material relating to WG operations WG Baseline + Relevant LMSC P&P+ OM Content LMSC OM Extract material relating to WG operations Approve OM Split into OM+ WG P&P Approve removal of LMSC P&P Material New LMSC WG P&P Updated LMSC OM Updated LMSC P&P

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission February 14 Matthew Sherman, BAE SystemsSlide 4 WG P&P Development –Key Dates 7/11/ :00 PM PDT 4.0 hours In Person 7/17/ :00 PM PDT Closing EC Vote to initiate OM Rev 7/17/ :30 PM PDT 2.5 hours In Person 8/21/ :00 PM ET 2.0 hours Teleconference 9/18/ :00 PM ET 2.0 hours Teleconference 10/16/ :00 PM ET 2.0 hours Teleconference 11/13/ :00 PM ET 2.0 hours Teleconference 11/15/ :00 PM ET 4.0 hours In Person 11/20/ :00 PM ET Closing EC Vote to approve OM Rev 11/20/ :00 PM ET Closing EC Vote to approve P&P Rev

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission Current Documents Current draft LMSC P&P is as posted for original ballot –Will be posted to EC Doc server today Current draft LMSC OM is posted on EC Doc server as ec EC (DCN 2 Rev 1) –Will be amended today based on P&P Review last night Current draft LMSC WG P&P is as posted for original ballot –Will be amended based on P&P Review last night and posted to EC Doc server February 14 Matthew Sherman, BAE SystemsSlide 5

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission Issues Productive P&P Review session last night –Minutes will be published today Need to update documents for latest consensus –Will be posted today One area of disagreement is reinstatement of certain EC voting rules in LMSC OM –Approval of PARs and DRAFTS for forwarding to IEEE SA shall require approval by a majority of EC Members present with voting rights. At closing EC meeting will stawpoll who would vote against the motion if this is added –If it will pass, will entertain an amendment to motion adding this to LMSC OM February 14 Matthew Sherman, BAE SystemsSlide 6

doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission February 14 Matthew Sherman, BAE SystemsSlide 7 Sunday P&P Review Meeting Ran about 3.5 hour discussed WG P&P development with focus on –The role of TAGs in IEEE 802 –Approach to WG voting rules Based on straw polls ballot documents will be edited to –Clarify that TAG are a special form of a Standing Committee using WG rules but allowed to be assigned a PAR –Update WG voting rules to reflect current LMSC voting practices in an AudCom format –Reduce chairs constraints on procedural votes concerning RRoO –Set approval threshold to change WG OMs to 75% IEEE SASB Chair will provide inputs for incorporation regarding WG member roster / list requirements