Emergency Services EC SG Report to 802 EC Geoff Thompson/Interdigital Study Group Chair (as appointed by 802 chair) 802 Executive Committee Friday Session.

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Advertisements

Doc.: IEEE /0012r0 Submission January 2011 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGmb Nov 2010 Agenda Date: Authors:
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Page 1Version 1.0 IEEE closing report – November 2009 Plenary IEEE Ethernet Working Group November Plenary Report 20 November 2009 David J.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs Slide 1 Issues with P&P Review Requirments Date: March 18 th, 2003 Authors:
Doc.: IEEE /0009r1 Submission March 2006 Steve Shellhammer, QualcommSlide 1 March 2006 Opening Report Notice: This document has been prepared.
Submissions November 2007 Stephen McCann, NSNSlide 1 IEEE 802 Emergency Services (ES) Call for Interest (CFI) Date: Stephen McCann
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE xxx-00 Submission July 2006 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE Working Group for.
Vivek Gupta, Chair WG Joint Opening Plenary IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
Page 1 Agenda and General Information IEEE > >, >
Doc.: IEEE /0144r3 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Doc.: IEEE /0144r2 Submission January 2014 Adrian Stephens, Intel CorporationSlide January 2014 WG Motions Date: Authors:
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG March 2014 Opening Report Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG Report and Motion for the Mar 2014 closing EC meeting OmniRAN EC SG Chair: Max Riegel (NSN)
Omniran ecsg 1 OmniRAN EC SG March 2013 Closing Report Chair: Max Riegel, NSN.
May 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE /342r0 Submission 1 Slide Publicity Committee.
Doc.: IEEE 802 EC-12/0008r1 Agenda March 2012 Jon Rosdahl, CSRSlide 1 More Proposed Changes to P&P and OM Date: Authors:
Doc.: IEEE /0217r2 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Doc.: IEEE /01552r1 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Closing Report IEEE Media Independent Handover Services Session #25 Orlando, Florida Vivek Gupta
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
1 Proposal for an IEEE 802 EC OmniRAN Study Group 15 November 2012 Harry Bims (HetNet Study Group Chair)
Doc.: IEEE /01552r5 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Agenda Date: Authors:
Session#49-Closing_Plenary_Notes.ppt IEEE Session #49 Big island, Hawaii Closing Plenary Subir Das, Chair WG March 2012.
Omniran ecsg 1 OmniRAN EC SG Agenda May 2013, Waikoloa, HI Max Riegel (OmniRAN SG Chair)
IEEE Emergency Services Working Group Report to: Emergency Services Workshop #7 Geoff Thompson/GraCaSI (supported by Interdigital) Working Group.
Doc.: IEEE /0087r01 Submission July 2011 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the July Plenary EC Meeting IEEE P Wireless.
Omniran ecsg 1 OmniRAN EC SG Agenda March 2013, Orlando, FL Max Riegel (OmniRAN SG Chair)
IEEE 802Emergency Services Exec. Committee Study Group Report to IETF ECRIT Geoff Thompson/GraCaSI (supported by Interdigital) Study Group/WG Chair IETF.
Closing Report IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
Doc.: IEEE /0186r3 Submission March 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE r0 Submission November 2002 Matthew B. Shoemake, TGg Chairperson IEEE TGg Chairs Status Update Matthew B. Shoemake TGg Chairperson.
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
China MM-Wave (CMMW) Study Group May 2012 Closing Report
NG60 SG March 2015 Agenda Date: Authors: March 2015
Vivek Gupta Closing Report IEEE Media Independent Handover Services Session #35 Atlanta, Georgia Vivek Gupta
Stephen McCann, Siemens Roke Manor
Sub-1 GHz Study Group Closing Report Sept 2018
PAR Review - Meeting Agenda and Comment slides - Nov Orlando
November 2001 doc.: IEEE /468r0 November
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
WG11 response to Proposed 802 PAR - March Orlando Plenary
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
IEEE MEDIA INDEPENDENT HANDOVER
July Plenary Opening Report
IEEE MEDIA INDEPENDENT HANDOVER
November Plenary Opening Report
IEEE 802 EC Privacy Recommendation SG November, 2014, Report to 802 EC
Comments on PAR and 5C Date: Authors: March 2010
March Plenary Opening Report
OmniRAN EC SG Agenda April11th, 2013 Conference Call
November Plenary Opening Report
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Working Group for Wireless Personal Area Networks
Stephen McCann, Siemens Roke Manor
IEEE MEDIA INDEPENDENT SERVICES DCN:
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
S1G Closing Report – May 2010 Date: Authors: May 2010
IEEE P Motions at the July Plenary EC Meeting
IEEE MEDIA INDEPENDENT SERVICES DCN:
doc.: IEEE /xxxr0 Subir Das sdas at appcomsci dot com
IEEE MEDIA INDEPENDENT HANDOVER
EC Closing Report on Rules
Presentation transcript:

Emergency Services EC SG Report to 802 EC Geoff Thompson/Interdigital Study Group Chair (as appointed by 802 chair) 802 Executive Committee Friday Session Orlando, FL USA Friday, March 18, 2010

Emergency Services EC SG Report to 802 EC, March 18, 2010 This study group created at July '09 Plenary by 802 Executive Committee as an ECSG Successor to Emergency Services Study Group PAR attempt, w/d in the face of significant criticism, July '09 (LMSC OM Clause 12, Procedure for PARs) 12.1 IEEE-SA Standards Board Approval Any standards activity whose aim is to produce a Standard, Recommended Practice, or Guide shall submit a PAR to the IEEE-SA Standards Board within six months of beginning work.

ES-ECSG Report to 802 EC, 3/18/10 Meetings since SG creation Waikailoa, HI USA (Wireless Interim), Sept., '09 Atlanta, GA USA (802 Plenary), Nov., '09 La Jolla, CA USA (co-loc ), Jan., '10 Orlando, FL USA (802 Plenary), Mar., '10 Next planned meeting Geneva, Switzerland (co-loc.1/.3), May, '10

ES-ECSG Report to 802 EC, 3/18/10 PAR and Five Criteria Finalized and voted at January meeting Distributed to 802 EC on Feb., 11, 2010 Pre-submitted to NESCOM, Feb., nn, 2010 (Per P. Niklolich authorization) Feedback meeting and PAR/5C changes generated Wednesday of this week. Updates posted to document server, pointers sent to EC. Tutorial given Monday, 7:30 – 9:00 Estimated attendance 80 – 100 people Vigorous Q & A cut off by time constraint

ES-ECSG Report to 802 EC, 3/18/10 PAR Minor tweaks in response to comments Heavily reworked Scope (See next slide) Meetings this week Total attendance: 9 Peak attendance Monday: 7 Peak attendance Wednesday: 5

ES-ECSG Report to 802 EC, 3/18/10 New (reviised) Scope This standard defines a media independent framework within IEEE 802 to provide consistent access and data that facilitate compliance to applicable civil authority requirements for communications systems that include IEEE 802 networks. This includes a network layer interface for a consistent view of IEEE 802 networks by IP (Internet Protocol) based citizen-to-authority emergency services capabilities from the Internet Engineering Task Force (IETF) Emergency Context Resolution with Internet Technologies (ECRIT). This standard specifies a layer 2 entity and associated behaviors with a uniform structure of management information for transferring data required by an emergency services request.

ES-ECSG Report to 802 EC, 3/18/10 MOTION: (Fwd'd by SG, 4/0/0) That the 802 EC approve the PAR as presubmitted (with the changes as presented 3/18/2010) for consideration as an approval item by NESCOM and the SASB at the March 2010 SASB Meeting Series. Moved by:Mat Sherman Second:Name Vote:App___Neg___Abs____ 3/19/20102:?? PMPASS/FAIL