doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project –Normal route for outputs to ITU-R –Has experience with developing joint views First meeting held during Londonium interim –Well attended, definite interest in moving forward Work was done F2F and by conference calls –IMT-Advanced Requirements input to ITU-R WP8F submitted 15 May to IEEE-SA ITU-R liaison
doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks 17 July Meeting Agenda Updated work done at most recent WP8F meeting –Provided by Adam Pollard – chair of the WP8F drafting group Discussion/decision on further requirements input to WP8F –Same work method as previously used –Interested WGs develop inputs, harmonize in –Completion date Q –Work to start in September
doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks Proposed Timeline - Requirements July IEEE 802 plenary –Decision on IMT-Advanced Requirement made – requirements correspondence group continues September wireless interim –Work begins and continues with conference calls if needed November 2007 IEEE 802 Plenary –Contribution completed and approved –Submitted to ITU-R
doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks 17 July Meeting Agenda cont Discussion/decision on submission of a joint IEEE 802 technology input to ITU-R WP8F –Same work method as used for requirements –Tentative completion date Q –No decision taken Some expressed the view that it would be too difficult to achieve a joint IEEE 802 input Will be considered again at the November plenary
doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks Proposed Timeline - Technology July IEEE 802 plenary –Decision on IMT-Advanced Technology made September wireless interim – technology correspondence group established and scope of work defined November 2008 IEEE 802 Plenary –Contribution completed and approved –Submitted to ITU-R