Doc.: IEEE 802. 18-07-0065-00-0000 Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project.

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on ITU-R Activities In October/November ITU-R held two.
Advertisements

Submission January 2011 Michael Lynch, MJ Lynch & Associates RR-TAG ITU-R Update ITU-R WP1A is developing a report on SMART GRID.
IEEE Submission Sept 2008 Michael Lynch, Nortel Networks Slide 1 ITU-R Regulatory Background Date: Authors:
IEEE Submission Sept 2008 Michael Lynch, Nortel Networks Slide 1 ITU-R Regulatory Background Date: Authors:
Doc.: IEEE /0044r0 Submission July 2010 John R. Barr, JRBarr, Ltd.Slide 1 IEEE 802 Submission to ITU-R on 60 GHz Notice: This document has been.
Doc.: IEEE /1184r0 Submission September 2008 Peter Ecclesine, Cisco SystemsSlide 1 M.1801 ad hoc Waikoloa report Date: Authors:
Doc.: _SEC_Motions_Jul06 Submission July Motion to SEC Motion by: LynchSeconded by: Agenda: 9.02 Date: 07/21/2006 Time: 3:20.
Doc.: IEEE Submission March 2006 Michael Lynch, Nortel RR-TAG Opening Report Report on January 06 Interim Meeting Work to.
Doc.: IEEE Submission March 2006 Michael Lynch, Nortel RR-TAG Opening Report Report on March 06 Plenary Meeting Work accomplished.
Doc.: 18-14/0021 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-13/0107 Submission November, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: 18-12/0111 Submission November, 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared.
Doc.: Submission November 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: IEEE OmniRAN-13/0092r0 Submission November 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
Omniran ecsg 1 OmniRAN EC SG November 2013 EC Opening Report Chair: Max Riegel (NSN)
Doc.: IEEE OmniRAN-13/0069r0 Submission September 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE OmniRAN-13/0053r0 Submission July 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
Doc.: IEEE Submission March 2008 Michael Lynch, Nortel Networks Update on ITU-R and IMT-Advanced At the November meeting IEEE 802:
11 ITU-R Liaison Group Report to Session #83 Closing Plenary Roger Marks Acting Chair, ITU-R Liaison Group IEEE WG Session #83 Vancouver,
Doc.: IEEE /0989r /0045r1 Submission July 2006 Denis Kuwahara, BoeingSlide 1 RR-TAG Liaison Report IEEE Notice: This document.
Doc.: 18-14/0055 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared to.
Doc.: 18-14/0014 Submission March, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: 18-13/0093r1 Submission July, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-12/0058 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: 18-12/0076 Submission July 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
Doc.: IEEE rfid RFID-IG November 2007 Mike McInnis, The Boeing Company Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the May 2009 interim.
Doc.: _SEC_Motions_Mar08 Submission March 2008 Michael Lynch, Nortel Networksh Motion to SEC Motion by: LynchSeconded by: Heile.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on January 2007 interim meeting Work.
Doc.: IEEE Submission May 2007 Michael Lynch, Nortel RR-TAG Opening Report Report on March 2007 plenary meeting Work planned.
Doc.: IEEE /0943r0 Submission July Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates RR-TAG Closing Report Report of the July 2009 plenary.
Doc.: IEEE r Submission April 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission July 2009 Michael Lynch, MJ Lynch & Associates IEEE IMT Advanced Update IEEE 802 has continued active.
Doc.: 18-14/0078 Submission November, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-15/0043 Submission July 17 th, 2015 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE Submission May 2008 Michael Lynch, Nortel Networks RR-TAG Opening Report Report on March 2008 plenary meeting.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
RR-TAG (802.18) Liaison Report
22 March Agenda Opening comments and attendance
RR-TAG Opening Report Report of the March 2009 plenary meeting
RR-TAG Opening Report Report on November 06 Interim Meeting
[RR-TAG Liaison Report to ]
IMT-Advanced Opening Report
RR-TAG (802.18) to Liaison Report
RR-TAG Opening Report Report on May 2008 interim meeting
Liaison Report from Date: September 20, 2012 September 2012
RR-TAG Liaison Report July 2008 IEEE
IMT-Advanced Closing Report
RR-TAG Closing Report Report on May 2008 interim meeting
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE – Liaison Report] Date.
IEEE (RR-TAG) Liaison Report
Planned Objectives for This Meeting
IEEE IMT-Advanced Review Process
RR-TAG Opening Report Report on November 2007 plenary meeting
IEEE IMT-Advanced Review Process
RR-TAG Closing Report Report of the March 2011 Plenary meeting
RR-TAG Closing Report Report of September 2008 plenary meeting
18 March Agenda Opening comments and attendance
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
March 2011 RR-TAG Opening Report
RR-TAG (802.18) Liaison Report
<month year> doc.: IEEE < e> <July 2019>
<month year> doc.: IEEE < e> <July 2019>
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks EC IMT-Advanced Update RR-TAG was directed to take this project –Normal route for outputs to ITU-R –Has experience with developing joint views First meeting held during Londonium interim –Well attended, definite interest in moving forward Work was done F2F and by conference calls –IMT-Advanced Requirements input to ITU-R WP8F submitted 15 May to IEEE-SA ITU-R liaison

doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks 17 July Meeting Agenda Updated work done at most recent WP8F meeting –Provided by Adam Pollard – chair of the WP8F drafting group Discussion/decision on further requirements input to WP8F –Same work method as previously used –Interested WGs develop inputs, harmonize in –Completion date Q –Work to start in September

doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks Proposed Timeline - Requirements July IEEE 802 plenary –Decision on IMT-Advanced Requirement made – requirements correspondence group continues September wireless interim –Work begins and continues with conference calls if needed November 2007 IEEE 802 Plenary –Contribution completed and approved –Submitted to ITU-R

doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks 17 July Meeting Agenda cont Discussion/decision on submission of a joint IEEE 802 technology input to ITU-R WP8F –Same work method as used for requirements –Tentative completion date Q –No decision taken Some expressed the view that it would be too difficult to achieve a joint IEEE 802 input Will be considered again at the November plenary

doc.: IEEE Submission July 2007 Michael Lynch, Nortel Networks Proposed Timeline - Technology July IEEE 802 plenary –Decision on IMT-Advanced Technology made September wireless interim – technology correspondence group established and scope of work defined November 2008 IEEE 802 Plenary –Contribution completed and approved –Submitted to ITU-R