1 1 Sport Obermeyer Case John H. Vande Vate Spring, 2006.

Slides:



Advertisements
Similar presentations
Sport Obermeyer Case Prof Mellie Pullman.
Advertisements

Ind – Develop a foundational knowledge of pricing to understand its role in marketing. (Part II) Entrepreneurship I.
Determining the Optimal Level of Product Availability
Taking into Account Regulatory Risk Professor Joshua Gans University of Melbourne.
Case Study: Sport Obermeyer
Valuation and Rates of Return
4. Project Investment Decision-Making
Betting on Uncertain Demand: Newsvendor Model
Chapter 9b Price Setting in the Business World. How are prices set by business people? Costs provide a price floor. See what substitute products are priced.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
"SKIING IS A CELEBRATION OF LIFE" Company Background
Chapter 12 – Independent Demand Inventory Management
CHAPTER 7 Managing Inventories
QBook UNIT 2 Setting Goals. QBook INTRODUCTION  During a negotiation, most people have a general idea of what they want:  higher pay, lower price, higher.
Short Selling Objective: You’re bearish on a stock --- you think its price will be lower in the future. You want to Sell high now, and in the future Buy.
Copyright © 2003 McGraw Hill Ryerson Limited 4-1 prepared by: Carol Edwards BA, MBA, CFA Instructor, Finance British Columbia Institute of Technology Fundamentals.
MERCHANDISING Merchandising means the activities involved in acquiring particular goods and/or services and making them available at the places, times,
Contracts for Make-to-Stock/Make-to-Order Supply Chains
Operations Management
Chapter 5 The Law of Supply  When prices go up, quantity supplied goes up  When prices go down, quantity supplied goes down.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e Global Edition 1-1 Copyright ©2013 Pearson Education. 1-1 Copyright.
ISC/SCLC SPRING 2006 MEETING
Roman Keeney AGEC  In many situations, economic equations are not linear  We are usually relying on the fact that a linear equation.
Backup Contracts under Supply Risks and Stochastic Demand Jing Hou.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Newsvendor Models & the Sport Obermeyer Case
Managing Inventory Why do we have inventory?
1 1 Newsvendor Models & the Sport Obermeyer Case John H. Vande Vate Fall, 2011.
Chapter 18 Price Setting in the Business World. How are prices set by business people? Costs provide a price floor. See what substitute products are priced.
1 1 Revenue Management Dealing with Uncertainty John H. Vande Vate Spring 2006.
1 1 Managing Uncertainty with Inventory I John H. Vande Vate Spring, 2007.
Types of IP Models All-integer linear programs Mixed integer linear programs (MILP) Binary integer linear programs, mixed or all integer: some or all of.
Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil Spring 2010.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Different Types of Rate of Return
Chapter 21: The Costs of Production McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. 13e.
© South-Western Educational Publishing GOALS LESSON 3.4 PRICING MERCHANDISE  Describe the methods buyers use to calculate the cost of merchandise  Calculate.
1 Managing Flow Variability: Safety Inventory Operations Management Session 23: Newsvendor Model.
Pricing and Strategies
OMG Operations Management Spring 1997 CLASS 13: Introduction to Logistics Harry Groenevelt.
3 CHAPTER Demand and Supply © Pearson Education 2012 After studying this chapter you will be able to:  Describe a competitive market and think about.
1 Chapter 3 Cost-Volume-Profit Analysis Decisions between discrete alternatives under uncertainty.
11-1 Yes, But What Does It Cost? Price is the value that customers give up or exchange to obtain a desired product Payment may be in the form of money,
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
1 1 Forecasting and Logistics John H. Vande Vate Fall, 2002.
Demand, Supply, and Prices
Planning to Buy.
MICROECONOMICS Chapter 3 Demand and Supply
1 1 Wrap Up John H. Vande Vate Spring, Review of Topics Variability Basics –The big idea Forecasting –The 5 Laws of Forecasting –Actual/Forecast.
Productivity and Efficiency
Measuring and Increasing Profit. Unit 1 Reminder – What is Profit? Profit is the reward or return for taking risks & making investments.
Managing Uncertainty with Inventory I
John H. Vande Vate Spring, 2006
OUTLINE Questions, Comments? Quiz Results Target Strategy:
Resource Management Resource management is all about the making of the product or service and delivering it to the client Marketing creates demand for.
5.02 Calculating Prices.
Perfect Competition: Short Run and Long Run
KatherineSU154.
Determining Optimal Level of Product Availability
Sport Obermeyer.
Chapter 14 Sourcing Decisions in a Supply Chain
Start Small and Retire Early With Weekly Options
Speculative Production Capacity Reactive Production Capacity
Sport Obermeyer Case John H. Vande Vate Fall,
ISyE 6203 The HDT Case Vande Vate Fall,
Chapter 14 Sourcing Decisions in a Supply Chain
Overview of Working Capital Management
Supply Chain Contracts and their Impact on Profitability
Last year’s Final John Vande Vate Fall, 2009.
Chapter 8 Overview of Working Capital Management
Presentation transcript:

1 1 Sport Obermeyer Case John H. Vande Vate Spring, 2006

2 2 Issues Question: What are the issues driving this case? –How to measure demand uncertainty from disparate forecasts –How to allocate production between the factories in Hong Kong and China How much of each product to make in each factory

3 3 Describe the Challenge Long lead times: –It’s November ’92 and the company is starting to make firm commitments for it’s ‘93 – 94 season. Little or no feedback from market –First real signal at Vegas trade show in March Inaccurate forecasts –Deep discounts –Lost sales

4 4 Production Options Hong Kong –More expensive –Smaller lot sizes –Faster –More flexible Mainland (Guangdong, Lo Village) –Cheaper –Larger lot sizes –Slower –Less flexible

5 5 The Product 5 “Genders” –Price –Type of skier –Fashion quotient Example (Adult man) –Fred (conservative, basic) –Rex (rich, latest fabrics and technologies) –Beige (hard core mountaineer, no-nonsense) –Klausie (showy, latest fashions)

6 6 The Product Gender –Styles –Colors –Sizes Total Number of SKU’s: ~800

7 7 Service Deliver matching collections simultaneously Deliver early in the season

8 8 The Process –Design (February ’92) –Prototypes (July ’92) –Final Designs (September ’92) –Sample Production, Fabric & Component orders (50%) –Cut & Sew begins (February, ’93) –Las Vegas show (March, ’93 80% of orders) –SO places final orders with OL –OL places orders for components –Alpine & Subcons Cut & Sew –Transport to Seattle (June – July) –Retailers want full delivery prior to start of season (early September ‘93) –Replenishment orders from Retailers Quotas!

9 9 Quotas Force delivery earlier in the season Last man loses.

10 The Critical Path of the SC Contract for Greige Production Plans set Dying and printing YKK Zippers

11 Driving Issues Question: What are the issues driving this case? –How to measure demand uncertainty from disparate forecasts –How to allocate production between the factories in Hong Kong and China How much of each product to make in each factory How are these questions related?

12 Production Planning Example Rococo Parka Wholesale price $ Average profit 24%* = $27 Average loss 8%* = $9

13 Sample Problem

14 Recall the Newsvendor Ignoring all other constraints recommended target stock out probability is: 1-Profit/(Profit + Risk) =8% / (24%+8%) = 25%

15 Ignoring Constraints Everyone has a 25% chance of stockout Everyone orders Mean  P =.75 [from.24/( )] Probability of being less than Mean  is 0.75

16 Constraints Make at least 10,000 units in initial phase Minimum Order Quantities

17 Objective for the “first 10K” First Order criteria: –Return on Investment: Second Order criteria: –Standard Deviation in Return Worry about First Order first Expected Profit Invested Capital

18 First Order Objective Maximize  = Can we exceed return  *? Is L(  *) = Max Expected Profit -  *Invested Capital > 0? Expected Profit Invested Capital

19 First Order Objective Initially Ignore the prices we pay Treat every unit as though it costs Sport Obermeyer $1 Maximize = Can we achieve return ? L( ) = Max Expected Profit -  Q i > 0? Expected Profit Number of Units Produced

20 Solving for Q i For fixed, how to solve L( ) = Maximize  Expected Profit(Q i ) -  Q i s.t. Q i  0 Note it is separable (separate decision each Q) Exactly the same thinking! Last item: –Profit: Profit*Probability Demand exceeds Q –Risk: Loss * Probability Demand falls below Q –  Set P = (Profit – )/(Profit + Risk) = 0.75 – /(Profit + Risk) Error here: let p be the wholesale price, Profit = 0.24*p Risk = 0.08*p P = (0.24p – )/(0.24p p) = /(.32p)

21 Solving for Q i Last item: –Profit: Profit*Probability Demand exceeds Q –Risk:Risk * Probability Demand falls below Q – Also pay  for each item Balance the two sides: Profit*(1-P) – = Risk*P Profit – = (Profit + Risk)*P So P = (Profit – )/(Profit + Risk) In our case Profit = 24%, Risk = 8% so P =.75 – /(.32*Wholesale Price) How does the order quantity Q change with ? Error: This was omitted. It is not needed later when we calculate cost as, for example, 53.4%*Wholesale price, because it factors out of everything.

22 Q as a function of Q Doh! As we demand a higher return, we can accept less and less risk that the item won’t sell. So, We make less and less.

23 Let’s Try It Min Order Quantities! Adding the Wholesale price brings returns in line with expectations: if we can make $26.40 = 24% of $110 on a $1 investment, that’s a 2640% return

24 And Minimum Order Quantities Maximize  Expected Profit(Q i ) -  Q i M*z i  Q i  600*z i (M is a “big” number) z i binary (do we order this or not) If z i =1 we order at least 600 If z i =0 we order 0

25 Solving for Q’s L i ( ) = Maximize Expected Profit(Q i ) - Q i s.t. M*z i  Q i  600*z i z i binary Two answers to consider: z i = 0 then L i ( ) = 0 z i = 1 then Q i is easy to calculate It is just the larger of 600 and the Q that gives P = (profit - )/(profit + risk) (call it Q*) Which is larger Expected Profit(Q*) – Q* or 0? Find the largest  for which this is positive. For  greater than this, Q is 0.

26 Solving for Q’s L i ( ) = Maximize Expected Profit(Q i ) - Q i s.t. M*z i  Q i  600*z i z i binary Let’s first look at the problem with z i = 1 L i ( ) = Maximize Expected Profit(Q i ) - Q i s.t. Q i  600 How does Q i change with ?

27 Adding a Lower Bound Q

28 Objective Function How does Objective Function change with ? L i ( ) = Maximize Expected Profit(Q i ) – Q i We know Expected Profit(Q i ) is concave As increases, Q decreases and so does the Expected Profit When Q hits its lower bound, it remains there. After that L i ( ) decreases linearly

29 The Relationships  Q reaches minimum Capital Charge = Expected Profit Past here, Q = 0

30 Solving for z i L i ( ) = Maximize Expected Profit(Q i ) - Q i s.t. M*z i  Q i  600*z i z i binary If z i is 0, the objective is 0 If z i is 1, the objective is Expected Profit(Q i ) - Q i So, if Expected Profit(Q i ) – Q i > 0, z i is 1 Once Q reaches its lower bound, L i ( ) decreases, when it reaches 0, z i changes to 0 and remains 0

31 Answers China Hong Kong In China? Error: That resolves the question of why we got a higher return in China with no cost differences!

32 First Order Objective: With Prices It makes sense that  the desired rate of return on capital at risk, should get very high, e.g., 1240%, before we would drop a product completely. The $1 investment per unit we used is ridiculously low. For Seduced, that $1 promises 24%*$73 = $17.52 in profit (if it sells). That would be a 1752% return! Let’s use more realistic cost information.

33 First Order Objective: With Prices Maximize = Can we achieve return ? L( ) = Max Expected Profit -  c i Q i > 0? What goes into c i ? Consider Rococo example Cost is $60.08 on Wholesale Price of $ or 53.4% of Wholesale Price. For simplicity, let’s assume c i = 53.4% of Wholesale Price for everything from HK and 46.15% from PRC Expected Profit  c i Q i

34 Return on Capital Hong Kong China If everything is made in one place, where would you make it?

35 Gail Expected Profit above Target Rate of Return Target Rate of Return Make it in China Make it in Hong Kong Stop Making It.

36 What Conclusions? There is a point beyond which the smaller minimum quantities in Hong Kong yield a higher return even though the unit cost is higher. This is because we don’t have to pay for larger quantities required in China and those extra units are less likely to sell. Calculate the “return of indifference” (when there is one) style by style. Only produce in Hong Kong beyond this limit.

37 Where to Make What? That little cleverness was worth 2% Not a big deal. Make Gail in HK at minimum

38 What Else? Kai’s point about making an amount now that leaves less than the minimum order quantity for later Secondary measure of risk, e.g., the variance or std deviation in Profit.