1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.

Slides:



Advertisements
Similar presentations
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Advertisements

Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Financial Model.
2015/16 changes to the winter time-of-use peak periods and tariff charge name changes.
Portfolio Committee on Energy Securing financial sustainability (in response to lower tariff decision) May 2013.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
TARIFF REGULATION IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY
The big picture in the EU Managing conflicting objectives in tariff design Tom Maes, Vice-Chair CEER Gas Working Group Understanding the impact of regulatory.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Pasadena Water and Power Electric Rates Workshop: Cost of Service Analysis and Rate Proposals.
Incentive Regulation Topics Scott A. Struck, CPA Financial Analysis Division Public Utilities Bureau Illinois Commerce Commission.
How To Value Your Business Presented to the 43rd Annual Business Administration Conference NRMCA October 24,2001 New Orleans.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
An Overview of Our Regulatory Proposal
Incorporating an Affordability Rate Cap Into a Florida RPS Florida Public Service Commission July 26, 2007 Kim Owens, P.E. JEA Clean Power Coordinator.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
DATE: 21 August 2012 Determining the Regulatory Asset Base Anthony Felet – Regulatory Finance Specialist 1.
Electricity Pricing: Presented by: AT Audat (Acting CD: Electricity) 06 August
Board Staff Presentation Stakeholder Conference – August 5-8, 2008 INCREMENTAL CAPITAL MODULE July 28, 2008.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
Draft decisions Access Arrangements for APT Allgas and Envestra (Qld) Warwick Anderson General Manager, Network Regulation 1 March 2011 Public.
NARUC Joint Session, Committees on Electricity and Gas Ellen Lapson, CFA February 19, 2008.
Australian Energy Regulator AER Preliminary decision for SA Power Networks 2015−20 Conference 13 May 2015.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
1 Cost of Service A Tariff Overview A presentation by Eskom April 2010.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
Briefing on Eskom Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
National Electricity Regulator Tariff Approval Process Presentation to: Parliamentary Portfolio Committee on Minerals and Energy Prof Anthon Eberhard –
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Construction of Coal-Fired Generation: Evaluating the Utility Credit Implications Ellen Lapson, Managing Director Fitch Ratings, Utilities, Power & Gas.
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
Chapter 02 Financial Statements. 2 Value = FCF 1 FCF 2 FCF ∞ (1 + WACC) 1 (1 + WACC) ∞ (1 + WACC) 2 Free cash flow (FCF) Market interest rates Firm’s.
1 PRESENTATION TO PPC ON ENERGY 24 MAY 2013 MUNICIPAL TARIFF DETERMINATION PROCESS.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Portfolio Committee on Trade and Industry Electricity Pricing 16 November 2012.
Presentation to Select Committee on Economic Development
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
1 RORB Return on Rate Base. Legal Basis  Section 43, (f) of Republic Act No Section 43. Functions of the ERC – x x x (a) x x x (f) x x x “The rates.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
ENERGY, PERFORMANCE & VALUE Dr Neil Blake, Head of EMEA Research & Rebecca Pearce, EMEA Head of Sustainability 30 th June 2015.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
MYPD2 APPLICATION 15 OCTOBER 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
1 The Eskom price adjustment Effective 1 July 2009.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
The agenda Eskom Tariffs – a regulated environment
NERSA presentation at the PPC meeting held on 24 May 2006
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
ELECTRICITY PRICING POLICY AND IMPACT ON THE MULTI YEAR PRICE DETERMINATION BY NERSA Matthews Bantsijang 7/6/2018.
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 2 NOVEMBER 2012 IPAP 2012/10.
City of Lebanon, Missouri Electric Department
FFC Briefing to the Portfolio Committee on Energy
Public Hearing on Municipal Tariff Guideline Increase for 2007/08 Financial Year
Parameters used on revenue aproval for period
Minerals & Energy Parliamentary Portfolio Committee
OUTLINE Legislative context, NERSA vision and NERSA mission
Presentation transcript:

1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy

2 ESKOM MYPD3 Application in Summary

3 MYPD3 Decision in Summary

4 Approved Regulatory Asset Base Adjustments to align with the MYPD2 phasing in of the RAB Assets commissioning dates adjusted to cater for the delays Depreciation rate not adjusted (Depreciation amount will change due to changes in asset base costs)

Actual Return Approved 5 The allowed returns were calculated to allow Eskom to meet its debt obligation – see next slide These returns were also considered to allow for affordable and gradually increasing pricings and to avoid price spikes

6 Primary Energy (R’m) including Environmental Levy MYPD 3 Total Applied for Adjustment s(60 441) Allowed Primary Energy Coal Prices escalated at 10% over the MYPD3 period Base price for 2013/14 adjusted to reflect actual history IPP Commissioning dates and associated costs re-adjusted to reflect delays Efficiencies on the burn rate and load factors Renewable IPP adjusted to reflect revised dates Electricity purchases & SBP procurement costs disallowed

7 Depreciation

Integrated Demand Management (IDM) 8 IDM R'mIDMDMPBuy Back Applied for Adjusted(7 906)(688)(8 513) Approved Operational DMP maintained Supplemental limited to 800 MW Power Buy Back allocation not approved SWH & Heat pumps not approved Compressed air, process optimisation removed or limited

9 OPEX R'MMYPD3 TOTAL APPLIED ADJUSTED (45 258) APPROVED Operating expenditure (excl Primary Energy)  Manpower costs were adjusted in line with inflation plus a salary negotiating margin (1.4%) Additional staff compliment for new power plants included 1.24/MW)  Debt arrears reduced from 0.6% from 0.5%  “Other costs” limited to increase by inflation  Double counted items removed

10 Capex (R'm)MYPD3 Capex Applied Adjusted( ) Capex Approved Capital Expenditure Transmission adjustment based on detailed scope assessment and benchmarked costs/km or MVA. Distribution capex was adjusted from Eskom unit cost of R2.18/km to R1.74/km over the MYPD3 period – projects not altered Generation adjusted to remove excessive contingency fees and Owners Development Costs,

Weighted Average Cost of Capital 12 Months Average25 Years Average CAPM Real risk free rate2.29%4.51% Real cost of equity6.75%8.96% Real cost of debt2.86%5.07% Pre-tax real WACC5.14%7.65% Post-tax real WACC3.70%5.51% 11 The current methodology prescribes the use of 25 years average to calculate the real risk free rate The 12 months average reflect the current market conditions

Eskom’s Financial sustainability Goals 2 12 Source: NERSA Rfd

Eskom’s Financial Sustainability: Cash Flow 13 Source: NERSA Rfd

The Tariffs – issues considered and approved Increase to Homelight 20A customers consuming up to 350 kWh/month limited to inflationary increase of 5.6 %. Above this consumption level customers will see an increase of 7.6 % All residential customers will see an increase of 8 % p.a. Eskom to ensure: –T-O-U off-peak to peak demand adjusted from a ration of 1:9 to 1:8 –Tariff cross-subsidies to be shown transparently –The use-of-system charges to be based on cost per voltage level for all large power customers –The reliability and service charge to be unbundled from the energy charge –The environmental levy to be included in the energy charge and not shown separately Eskom to ensure alternate tariff options are made available to municipalities with a predominantly residential load mix 14

THANK YOU 15