Beamline Workshop 14 June 2011EtherCAT Driver for Remote I/O1.

Slides:



Advertisements
Similar presentations
Students writing their own feedback; self-assessment mediated by video mark schemes David Read and Paul Duckmanton.
Advertisements

© Quality Solutions for Healthcare Team Leadership Programme Betsi Cadwaladr University Health Board Workshop evaluation from 25 th January 2012 Debbie.
FLINDERS INSTITUTE OF PUBLIC POLICY AND MANAGEMENT Peer Support Grant Writing Workshop Why Apply for Funding? Developing your Research Ideas Gerry Redmond.
What are the different types of work?
USER INVOLVEMENT 2012/13 “It’s good to talk” Deborah Mosdall User Involvement Lead.
It’s my Life Group They have been working on: Health and Safety – what to do if there is a fire Health – food, drink, drugs, weight, exercise, mental,
LiveHelp over the web: a Local Collaborative Approach Rachel Cheng University Librarian Eastern Michigan University Steve Bischof Resource Assessment &
1 WORI Microfinance Loan Training December Introduction Today we will teach you all about the loan process. By the end of the day we want you.
Wayne Lewis Australian Synchrotron Beamline Controls Design and Implementation.
SuperDARN Workshop May 30 – June PI Report Mark Lester On behalf of the SuperDARN PIs.
Virtual Workbenches Richard Anthony The University of Greenwich
Connecting AreaDetector to GDA John Hammonds Software Services Group Advanced Photon Source The submitted manuscript has been created by UChicago Argonne,
Investigating the Use of Control System Studio at APS Beamlines An Eclipse Plug-in Perspective John Hammonds, Ken Evans, Brian Tieman Advanced Photon Source.
Career Research Project
EPICS Meeting, APS, June 14 th 2006 MCS-8 The 8 axes motion control system Rok Šabjan
August before Senior Year Register for the September ACT if appropriate (check ACT dates). Come up with a preliminary list of colleges that includes reach,
1 Towards an Upgrade TDR: LHCb Computing workshop May 2015 Introduction to Upgrade Computing Session Peter Clarke Many peoples ideas Vava, Conor,
Chapter 6 Effective Strategies to Get the Job You Want: Interviewing Strategies Copyright Raymond Gerson.
What is the Big Society ? Katherine Runswick-Cole Jodie Bradley
Bowland Maths Bowland Mathematics provides pupils and their teachers with interesting, exciting problems designed to develop the thinking, reasoning and.
ELearning for SITS training at Surrey SITS training meeting, Oxford University 29 th February 2012 Aditya Vadali SITS Knowledge Transfer & Projects Officer.
Love Life Personal Trainers One To One Fitness Training... Offers you effective workout plans, improved body shape & balanced posture, higher energy levels.
Eggbuckland Dreamscheme Our Story “Eggbuckland Youth
Copyright (c) 2003 CPTTM 1 Common fears of a software development manager Common fears of a software development manager: –Deadline.
SSRF Beamline Control System
Considerations when Seeking Faculty Teaching Positions in Economics AAEA Annual Meetings August 3, 2004 Eric E. Houk California State University-Stanislaus,
Workforce Development by John Goldsworthy. Workforce development is about making sure that we have the right people with the right skills to support people.
Diamond synApps workshops Nick Rees. Motivation synApps workshops came about for a number of reasons –Need to bring Diamond beamlines team up to speed.
Outline Customers Constraints Reviews Improvements Response to Focus Group Feedback How can we work together? Flexible Work Schedules.
Engaging Quality Assurance: OERS and Teaching Quality Tita Beaven and Anna Comas-Quinn, The Open University Open Educational Resources in Languages HEA/University.
Introduction to EPICS (Ned Arnold, John Maclean).
University of Virginia Software Development Processes (CS340 John Knight 2005) 1 Software Development Processes.
NAIA College Volleyball Coach (Rules, Recruitment and Interview)
What to Expect During Your Support Needs Interview Orientation Session for Individuals with Disabilities and Families.
Status of Visual DCT EPICS Workshop, Berlin, May 2002 R. Sabjan on behalf of M. Sekoranja J. Stefan Institute and Cosylab Ltd. in collaboration with SLS.
Jeffrey Murray Test Manager PowerPoint Microsoft Silicon Valley.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan Contracting Turn Key Systems with EPICS Mark Pleško
Every Employee Every Community Best Corporate Citizen "What distinguishes the 100 Best Corporate Citizens from their peers is a commitment to higher.
1 EPICS Linux Based IOC Support EPICS Meeting at BESSY May 2002 Marty Kraimer.
By Yolanda Bleen  Feeling very anxious, scared and overwhelmed. Hoping I can see this through.  New to the whole human service field. Class learning.
Leslie Billy Chief Executive Viewpoint. About Viewpoint Viewpoint is a service user led Charity which supports people with mental health or drug and alcohol.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Optimizing Your Computer To Run Faster Using Msconfig Technical Demonstration by: Chris Kilkenny.
Class of Instruction Page for Application Packet  If you have any interest in attending CVCC during your junior and/or senior years, make sure.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
1 Universities Space Research Association Introduction, Charter and Feedback Eric Becklin SSSC 18 Feb 2010.
Fast Track Training Australia 1 Each unit or topic has a set of tasks you must do before beginning the assessment These tasks are key to your success.
WORK EXPERIENCE. Why is work experience important ? It empowers and enables YOU to take responsibility for developing YOUR own experiences of the world.
Why A Software Review? Now have experience of real data and first major analysis results –What have we learned? –How should that change what we do next.
Sight Words.
Cooking sessions for Nightshelter residents Production of a budget recipe book/nutritional guide for residents (and wider use by charities/agencies) Nightshelter.
BROOKHAVEN SCIENCE ASSOCIATES U.S. Department of Energy Office of Basic Energy Sciences Funded under contract: DE-AC02-98CH10886 EPICS/RTEMS at NSLS S.
Welcome to the Kansas User Group Meeting January 12, 2015 Please remember to place your phone on mute and do NOT place your phone on hold.
E-Rate 103: Completing form 471 Funding Year 2009 July 1, 2009-June 30, school year.
By Langston Bowles-Fulmore.  In the early 1930 The Great Depression Started.  As you all may know The Great Depression was a time period when the stock.
Upgrade Software University and INFN Catania Upgrade Software Alessia Tricomi University and INFN Catania CMS Trigger Workshop CERN, 23 July 2009.
Elke Zimoch, EPICS Workshop 2004 Japan EPICS at the Protein Crystallography Beamlines of the SLS.
Motion Control at the Advanced Photon Source Argonne National Laboratory Mark Rivers University of Chicago 7 GeV synchrotron x-ray light source, the largest.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Consumer Directed Care Would you like fries with that? Angie Robinson September 2014.
Principles and Processes in Chemistry 100
Workshop for ART mentors
Mark Rivers University of Chicago
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Resource Efficiency Workshop
Getting Started with EPICS A lecture Series
FLINDERS INSTITUTE OF PUBLIC POLICY AND MANAGEMENT Peer Support Grant Writing Workshop Why Apply for Funding? Developing your Research Ideas Gerry Redmond.
Going Independent Pre discussion:
Internet Safety With Bill And Dave
EPICS at Diamond Mark Heron Head of Controls Group
Presentation transcript:

Beamline Workshop 14 June 2011EtherCAT Driver for Remote I/O1

We need advice and input from the EPICS user community Thank you 2

Goal of the Workshop To discuss how to best use the EPICS community to as a resource to support beamline development. Whilst I hope this may benefit TPS (since Chin-Yen asked for it!), I think we can all benefit. –Sharing experiences of the collaboration –Identifying organisations who have needs –Identifying organisations who can help –Generate ideas on what else we can do 14 June 2011EtherCAT Driver for Remote I/O3

Basic tenets “Beg, borrow, copy or steal before doing anything yourself” –Richard Farnsworth on building the Australian Synchrotron Remember that “Ego eats brains” –Don’t let self belief get in the way of sensible decisions Don’t underestimate the communities willingness to help –With the possible exception of Bob, we have all learnt from people who have done it before. –Consequently, we all have an obligation to pass it on. Start with synApps. –APS have been doing it for longer than anyone else 14 June 2011EtherCAT Driver for Remote I/O4

Diamond Beamline Experiences... How I didn’t make as much use of the EPIC collaboration as I should have

Where did I start? I arrived at Diamond in December 2004 One other person had started work on beamline controls 6 months before. –He left 8 months later First user scheduled 2 years later – January 2007 A significant number of the major beamline contracts had been placed. Neither of us had any synchrotron experience before Diamond –Both of us were astronomers Only I had EPICS experience. I have never hired anyone with any EPICS or synchrotron experience in my whole time at Diamond 14 June 2011EtherCAT Driver for Remote I/O6

What we did (early 2005) Spent 5 days (29/11–3/12/2004) at APS on my way to Diamond –Had conversations with John MacLean, Tim Mooney and Carlotta Lukowski, Tim Mooney, Mike Borland, Eric Norum, Marty Kraimer, Andrew Johnson, Ned Arnold, Mark Rivers, Hired 2 staff in Jan Hired another in June Took all 5 to SLS in July 2005 –They looked after us really well and we had a whole series of organised talks and discussions for us, plus lots of good food courtesy of SLS. –Presentations and discussions from Detlef Vermelen, Marcel Grunder, Andreas Ludeke, David Maden, Elke Zimoch, Rene Kapeller, Dirk Zimoch, Renata Krepaska, Jurai Krempaski, Christoph Quitmann 14 June 2011EtherCAT Driver for Remote I/O7

What we did (late 2005) Hired 3 more staff, lost 2 staff, hired one contractor. Hired another contractor to work specifically on source code control and release system. Organised 2 synApps workshops: –First in 5-8 December 2005 when Tim Mooney came to Diamond Discussed the synApps package, scanning, caPutCallback Additional attendees from SLS and BESSY –Second in February 2006 when Mark Rivers came to Diamond. Discussed asynDriver, detectors and feedback, interfacing with IDL and Python. Additional attendees from BESSY (2), SLS (4), Cosylab, Observatory Science and Hytec. 14 June 2011EtherCAT Driver for Remote I/O8

Other things we try and do Held regular EPICS training courses for new employees and contractor (ran by Observatory Sciences). Have new staff visit another synchrotron in their first year. Have all staff go to one EPICS or ICALEPCS meeting every 2 years. Encourage all staff to actively collaborate with developers in other sites. Always ask tech-talk before starting a new development. 14 June 2011EtherCAT Driver for Remote I/O9

Manpower rules of thumb 2-4 mature beamlines per EPICS engineers –APS has about 2, but the have no upper level software –Diamond has 3, but benefit from the GDA software group, so overall numbers are higher. –Other, less well funded, sites may have as high as 4. During development my average model is: –0.1 FTE before the Technical Design Review –0.5 FTE between TDR and technical commissioning –1-2 FTE during technical commissioning (~3 months). –0.4 FTE for first year. –0.33 FTE thereafter. However, some beamlines are more demanding than others. 14 June 2011EtherCAT Driver for Remote I/O10

Things that went well The SLS visit was pivotal The synApps workshops were also pivotal – particularly for the 4 new staff at the time. The redevelopment of motor support enable far more flexible use of modern motor controllers, while still preserving the motor record interface. areaDetector is making similar improvements for detector support. We were relatively flexible: –Originally EPICS was only going up to the exit window –Then we took over all control in the experimental area –Now we are taking over detectors. 14 June 2011EtherCAT Driver for Remote I/O11

Things that didn’t go so well Failed to set up many beamline specific standards: –Motor controller – including cabling, connectors, motor types etc. –Current amplifiers –Counter/scalars –Gateable ADC’s Didn’t get any motion specialists until we had started Phase 1 commissioning. 14 June 2011EtherCAT Driver for Remote I/O12