05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.

Slides:



Advertisements
Similar presentations
Ghislain Roy Safety Unit Accelerators and Beams Department CERN.
Advertisements

Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Metal Suspension and Exemption Planning Sayed Rokni, Jim Allan, James Liu, Olga Ligeti, Amanda Sabourov, Joachim Vollaire ES&H Radiation Protection Department.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
IEFC Workshop February 2010 H. Vincke for DGS/RP 1.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
CERN IT Department CH-1211 Genève 23 Switzerland t Some Hints for “Best Practice” Regarding VO Boxes Running Critical Services and Real Use-cases.
CHEP2000 February 2000 Impact of Software Review and Inspection Doris Burckhart CERN ATLAS DAQ/EF-1 Back-end software.
: adding and removing zones from Federal University of Rio de Janeiro CHEP’09 International Conference on Computing in High Energy and Nuclear Physics.
Workshop on Implementing Audit Quality Practices March 2006 Building Quality into the Financial Audit Process The NAO’s experience Gareth Caller.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Handling Electronics from Radiation Areas N. Conan, D. Forkel-Wirth, T. Otto, S. Roesler, C. Theis, C. Tromel, V. Tromel, Heinz Vincke, L. Ulrici R2E,
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Dismantling LEP and the Experiments Access to the underground areas, project organisation, coordination and safety.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Technical Services.
LEP cavities L. Ulrici, B. Cellerier, DGS-RP-RW EPPCN meeting, CERN, 29 Novembre 2012.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Sale of material salvaged from the LEP experiments 4 large experiments ALEPH DELPHI L3 OPAL The 4 detectors are situated in caverns (100 m under ground.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
June 2007Dirk Wiedner / PH/LBO-DO1 INB Database for LHCb How to ensure the traceability of material from the controlled area.
Procedure for Removal of Material and Waste from LHC P. Bonnal, N. Conan, I. Brunner, D. Forkel-Wirth, H. Menzel, S. Roesler, C. Tromel, L. Ulrici, with.
Report on database work for INB in ATLAS
Forecasts for waste and radioactive material storage
Safety Issues (TF, June 15, 2005)
HSE rules & regulations
Evangelia Dimovasili TS/LEA
Buffer Zones - Status Report
Radioactive waste management - status
Presentation transcript:

05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability

05/05/2006P.Fassnacht - LEAF2 INB: zoning.. Due in May 2006…. ED (Etudes déchets): waste studies, zoning. –Work has started couple of months ago. Good progress. –To help: CERN note SC RP-TN (based on DGSNR document) – Specific to experiments. The aim is to apply the same level of safety to all CERN installations, independent of the classification as INB or not. As first attempt reduce the “zones with nuclear waste” as much as possible. –The declassification of areas is a very complex/impossible procedure –Internal revision after the first years of operation. The zoning will be confirmed by measurements. –Confirmation of the waste zoning can/shall be done after reaching full luminosity (2009/2010) by performing measurements.

05/05/2006P.Fassnacht - LEAF3 INB: zoning…. “Reference zoning”: –Define limits of ZDC, “Zone Déchets conventionnels” from ZDN, “Zone Déchets nucléaires” –No quantitative definition. French legislation says « no activation, no contamination in normal operation! » for ZDC. –CERN proposes to set the limit at 1/10 th of the radionuclide exemption limit (LE) given by EU directive. For most radionuclide this limit is 1 Bq/g –If many: Sum i (A i /(LE i /10)) <1 (A i activation for radionuclide i) (will be proposed to IRSN – will it be accepted as “negligeable”? For LEP it was!)

05/05/2006P.Fassnacht - LEAF4 PROPOSAL for waste zoning definition LHC EXPERIMENTS + CNGS : –2 year cooling time for all components that are “fixed” (cannot be dismantled during a normal shut-down, but can be reached only after major dismantling) –100 d cooling for all “removable” components (in general more restrictive than the “cut” on half-lives <60 d – used for LEP) In addition : those components only partially included in the perimeter of the “nuclear zone” may be considered as conventional if BOTH the following conditions are satisfied: 1) Only 30% in volume is inside the radioactive perimeter 2) The sum of induced radioactivity in this area does not exceed 3 times the reference 1/10 LE limit

05/05/2006P.Fassnacht - LEAF5 Calculation parameters for LHC experiments CALCULATIONS are performed with MONTE-CARLO codes (FLUKA, Geant) ATLAS –10 y, 120 days per year, luminosity of cm -2 s -1 –2 years and 100 days cooling; CMS –1 CMS year at 0.05 x –1 CMS year at x –1 CMS year at x –10 CMS years at 0.5 x –2 years and 100 days cooling; –CMS year is 60 d ON, 10 d OFF, 60 d ON, 10 d OFF, 60 d ON, 165 d OFF. ALICE –Several periods of physic runs with different types of interacting particles (Ar, p, etc.) –10 y interaction at a luminosity of LHC-b –1 st year: 84 d, luminosity10 32, and 50% efficiency –2 nd to 5 th year: 10 7 s, luminosity 2x10 32, and 50% efficiency –5 th to 10 th year: 10 7 s, luminosity 5x10 32, and 50% efficiency

05/05/2006P.Fassnacht - LEAF6 Calculation: results - ATLAS Total: 1692 tons; 362m 3 - Down to 1164 tons; 268m 3

05/05/2006P.Fassnacht - LEAF7 Calculation: results LHCb –Data expected in time. ALICE –So far only partial information, waiting for the drawing and table following our new request CMS –Data available. Full information not yet sent to Luisa. Editing work has started (Luisa + ATR). Will circulate to 4 TCs before sending out.

05/05/2006P.Fassnacht - LEAF8 Proposal for the management of equipment, materials and waste at the INB Brainstorming Buffer zones –Buffer Zones will be necessary at all exit point of the underground experiments. Radiological controls will be performed in these Buffer zones. –In the buffer zone all material coming from the experimental areas (Nuclear or Conventional zone) are measured. Samples of materials from service caverns will be measured to prove that the risk of activation is negligible. –The dimension of the Buffer Zone will be decided by the department/experience (?) that is responsible for the installation with input from RP

05/05/2006P.Fassnacht - LEAF9 Labeling –All underground components shall be identified with a barcode –A database shall assure the connection of all barcodes with the corresponding definition in the zoning the logging of the radiological measurements. This traceability shall include the filiations of barcodes in case of dismantling of a component. The database shall assure the traceability of “ecarts” –At the moment of the radiological control in the buffer zone, all component will receive a sticker or a label: White label if the component is zoned as conventional and confirmed conventional (this label has to be removed if the material is re-installed in a beam area) Yellow sticker (with trefoil) in one of the following cases: radioactive according to the zoning and confirmed as radioactive, conventional according to zoning and confirmed as radioactive. A special label if the material is radioactive according to zoning and confirmed as conventional

05/05/2006P.Fassnacht - LEAF10 Radiological control –Measurement of dose-rate carried out with sensitive hand-held radiation detectors in the buffer zone. By RP? By us? –Gamma spectrometry will be required if material/waste shall leave the Organisation for shipping (to an outside institute or firm) or for final elimination. Centrally by RP. –Gate monitors (portiques) are strongly recommended by RP at all underground exits. –Use of the site Gate monitor (portique) for material/waste leaving the Organisation. –Decision limit: according to CERN current rule (0.1  Sv/h at 10 cm). Material for repair –Recommendation to keep as much as possible the repair at CERN (free circulation of material within CERN) –If the material is radioactive: choose a company that has the required national authorization to store/handle radioactive items –If the material shall be sent and it is conventional: gamma spectrometry check and agreement with international limits for transport

05/05/2006P.Fassnacht - LEAF11 Other issues The LHC experiments will have to train (external) staff on waste issues and on the respect of procedures for zoning (RP can assist if needed) The ISR tunnel will be declared as the waste temporary storage for radioactive waste coming from INB (LHC machine + LHC exp.+ CNGS): collaboration is needed for freeing space (CMS?).

05/05/2006P.Fassnacht - LEAF12 INB: Conclusions –Paper work: almost all done. Waiting now comments from French authorities. –More difficult is to get structured: Organize a team of safety engineers and technicians to follow-up on INB issues. Resources needed. Need to have our own plan (PH), then we bring it to NIMM. NIMM will then fwd to DG. –Some of the open questions: Need for (a) qualified workshops that will fulfill radiation protection requirements. Need for gate monitors at the various sites where to screen equipment leaving INB areas. Resources? Work procedures to be elaborated/verified in collaboration with RP. Political one: get accepted by CERN management that waste produced by the experiments is property of CERN…, ie cost for waste management is on CERN, not on the experiments. Not yet a formal decision by DG. Couple of tenth MCHF!