Doc.: IEEE 802.0-04/XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author:

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Advertisements

Doc.: ec EC Submission 2 nd VC Slides for EC Workshop Discussion Topics Date: November 12 th, 2011 Author: Matthew Sherman Vice Chair, IEEE.
July 2010 Notes on IEEE 802 Rules Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE /0623r1 Submission May 2009 Jon Rosdahl, CSRSlide 1 Proposal for P&P Change - # Date: Authors:
March 2010 Plenary Session Slides for Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date Submitted:
Doc.: IEEE /2079r0 Submission July 2007 Terry Cole, AMDSlide 1 WG Technical Editors Opening Report (July) Date: Authors:
Draft 03 Feb 26, PM EST1 Potential CAG/Sponsor Conflicts: an 802 perspective The IEEE SA endorses many projects –imperative principles of the SA:
Doc.: IEEE /854R3 SubmissionSlide 1 July 2004 Sheung Li, Atheros Section 21 Procedure (formerly Procedure 10) Request for P802.11j Conditional.
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission EC Update on LMSC Governance Date: November 16 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2007 Slide 1 EC LMSC Policy and Procedures Update Date: July 16 th, 2007 Author: Matthew.
Doc.: VC1_ _r2_EC_Closing_Motions.ppt Submission 1 st Vice Chair Closing Motions Date: November 20 th, 2009 Author: Matthew Sherman 1 st Vice Chair,
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs & Stuart J. Kerry, Philips Slide 1 SEC Motion For the Chair of IEEE 802 LMSC.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 Keep 802 Together Proposal Date: March 15, 2003 Point of Contact:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs Slide 1 Issues with P&P Review Requirments Date: March 18 th, 2003 Authors:
Nov. 14, 2005 C /81Chair, IEEE Opening November 2005 Plenary Session #17 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE 802 EC Submission July 2014 Adrian Stephens, Intel CorporationSlide 1 Formalizing the Wireless Chair’s Meeting Date: xx Authors:
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE 802.RR-02/040r3 Submission March 2002 Carl Stevenson, Agere SystemsSlide 1 Request to pass a motion to request SEC to establish a Radio Regulatory.
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
Doc.: IEEE /0564r0 Submission May 2014 Marc Emmelmann, SelfSlide 1 Results of LB 201 on TGai D2.0 Date: Authors:
Doc.: IEEE /0054r00 Submission March 2013 Apurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March Plenary EC Meeting IEEE P
March 2010 Plenary Session Notes on IEEE 802 Governance Review IEEE 802 Presentation Submission Template (Rev. 9) Document Number: ec EC Date.
Doc.: IEEE /0976r0 Submission September 2015 D. Stanley HP-Aruba Networks 2 nd Vice Chair Report September 2015 Date: Authors: Slide.
Doc.: IEEE /0746r1 Submission July 2015 D. Stanley HP-Aruba Networks 2 nd Vice Chair Report July 2015 Date: Authors:
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 LMSC Policy and Procedures Update Date: March 18 th, 2005 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: November 14 th, 2005 Author:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0318r0 Submission March 2014 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report Jan 2014 Date: Authors:
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE /0032r02 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 Motions Internal for LMSC 1 st Vice Chair (And supporting slides)
Doc.: IEEE /0804r0 Submission May 2007 Al Petrick, WiDeFiSlide 1 TGmb – Closing Report Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Doc.: VC1_ _EC_P&P_Update-opening_r0.ppt Submission November, 2007 Slide 1 EC Update on LMSC Policy and Procedures Date: November 12 th, 2007 Author:
Doc.: VC1_ _LMSC_P&P_Update-opening_r0.ppt Submission July, 2005 Slide 1 EC LMSC Policy and Procedures Update Date: July 18 th, 2005 Author: Matthew.
Doc.: IEEE /0377r2 Submission March 2005 Adrian Stephens, Intel CorporationSlide 1 Ballotting Process Improvements Notice: This document has been.
LMSC Policies and Procedures Subcommittee Inputs
Proposal for P&P Change - #2009-1
IEEE P Motions at the July Plenary EC Meeting
LMSC P&P Issues for Closing Plenary
Working Group March Plenary EC Closing Motions Package
EC LMSC Policy and Procedures Update
IEEE Motions at the November Plenary EC Meeting
Avoiding unnecessary delays in the WG Letter Ballot process
RTA TIG Agenda Date: Authors: March 2019
IEEE Motion at the February EC Telecon
IEEE Motion at the February EC Telecon
LMSC Policy and Procedures Update
EC Update on LMSC Policy and Procedures
LMSC Policy and Procedures Update
RTA TIG Agenda Date: Authors: March 2019
Policies and Procedures Status and Plans
EC LMSC Policy and Procedures Update
IEEE P Motions at the July Plenary EC Meeting
Motions Internal for LMSC 1st Vice Chair (And supporting slides)
Avoiding unnecessary delays in the WG Letter Ballot process
1st Vice Chair Closing Motions
IEEE P Motions at the July Plenary EC Meeting
EC Closing Report on Rules
EC Update on LMSC Policy and Procedures
Month 2000 doc.: IEEE /xxx November, 2005 Open season on the P&P
EHT SG Agenda Date: Authors: March 2019 January 2019
doc.: IEEE <doc#>
Presentation transcript:

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 1 LMSC Policy and Procedures Update Date: March 14 th, 2005 Author: Matthew Sherman 1 st Vice Chair, IEEE 802 BAE Systems - CINR

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 2 Status on P&P Restructuring

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 3 Rationale for Restructuring P&P Current P&P has been patched for 20 years –Inconsistencies have crept in P&P viewed as Broken by many EC members –Identified as single most critical issue during 802 restructuring discussions Unable to keep up with number of revisions required –Was doing 3+ revisions per plenary cycle Did not keep up with revisions required SA Rules have changed over time –Need through review to check compliance CS SAB recently completed complete rewrite of their rules –Requirements impact our rules AUDCOM has model Sponsor P&P and now reviews our P&P –Complying with AUDCOM model should ease approval our our P&P Restructuring of Rules required to accommodate these issues

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 4 Restructuring Process Reformat to match Sponsor Model (1 Cycle) –Editorial in Nature Modify for conformance (1 Cycle) –Identify where requirements of SA and CS SAB not met –Introduce changes to bring into conformance Streamline (12 Cycles) –Implement Less is More –Fix any deficiencies specific to 802 –Reduce backlog of P&P revisions Entire process to take roughly 16 months –Extend 4 months for streamlining YOU ARE HERE IN 2 ND CYCLE

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 5 LMSC P&P Maintenance Activities In process streamlining ballots (Vote for approval Friday) –P&P Revision Process (Matthew Sherman) –EC Membership & Meetings (Matthew Sherman) –EC Voting (Matthew Sherman) –WG Voting (Matthew Sherman) Pending streamlining ballots (Vote for balloting Friday) –WG Membership & Meetings (Matthew Sherman) –LMSC Procedures & Process (Matthew Sherman) –LMSC Organization (Matthew Sherman) –Miscellaneous (Matthew Sherman) Other Ballots –Bob Grow?

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 6 Current P&P Issues list Double click here to see current list of P&P Issues:

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 7 The LMSC P&P Revision Process

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 8 The P&P Revision Process Process currently being updated Formal and INFORMAL parts of process Current P&P Revision ballot will capture modifications to formal part of process Informal part of process on following slides

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 9 The Informal Part of the P&P Revision Process (How to avoid future backlogs) Any EC Member or WG can bring forward a Rev –If it matters to you, do something about it! –If not, then it wasnt that important anyway Particularly WG Chairs have manpower at their disposal –Delegate to others the crafting and writing –WG Chair introduces revision at EC 1 st Vice Chair will assist in balloting, but not editing and resolution! –To large a burden for one person –1 st Vice Chair may run actual ballots and collect comments May request assistance from motioner here depending on work load –1 st Vice Chair will provide formats and advice –Motioner must provide all documentation and conduct resolution 1 st Vice Chair will focus on more strategic P&P issues (and whim of Chair) –Entity Balloting –Task Group Membership

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 10 Informal Process for Ballot Resolution No more Sunday Rules meeting –Ad Hoc telecons as needed to conduct resolution prior to Plenary Session –Straw Polls at EC Monday meeting –If required further ballot resolution during session –Vote for approval at EC Friday meeting Testing process this session –Will straw poll Friday if new process is improvement –Otherwise will fall back to old format with Sunday rules meeting Will not formalize process in P&P –We have enough stuff in our bylaws as it is –Informal process preferred

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 11 Status on SA P&P Support Current Invoice for $9,487 –Familiarization with P&P –Recommended enhancements for SA conformance Renegotiating SOW –Directions have changed since original SOW generated –Issues center on definition of streamlining and number of ballots –Will probably need a vote of some sort on Friday Will provide reflector inputs earlier

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 12 P&P Revision Straw Polls

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 13 Why Straw Polls Dont want surprises on Friday –Higher threshold than normal vote –Find out what consensus exist –Do enough votes exist to pass? Work for further resolution if not

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 14 Reminder (A plea for participation) Approval of P&P revision requires 2/3 of all voting EC Members with voting rights –Current Interpretation established 4/9/04 by P. Nikolich Abstains do not count in denominator No formal ruling on voters not present –P&P Revision in process to increase approval level required for P&P Revision Abstains and not present will count in denominator! But for this Friday, must rely on 4/9/04 interpretation Is important that people participate in process –We all have an obligation to voice our opinions and vote –Trying to modify process to make it easier to participate Open to further suggestions –ABSTAIN will count as NO! Not participating is saying no Please say yes unless you mean no

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 15 Straw Poll How will you vote on the P&P Revision Process P&P Revision? For:Against:Abstain: Known Issues: (if eliminated from ballot will change your vote)

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 16 Straw Poll How will you vote on the EC Membership and Meetings P&P Revision? For:Against:Abstain: Known Issues: (if eliminated from ballot will change your vote) Member Emeritus, Telecons

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 17 Straw Poll How will you vote on the EC Voting P&P Revision? For:Against:Abstain: Known Issues: (if eliminated from ballot will change your vote) Extending Electronic Ballots

doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE SystemsSlide 18 Straw Poll How will you vote on the WG Voting P&P Revision? For:Against:Abstain: Known Issues: (if eliminated from ballot will change your vote) 33% Quorum