1 M. Catelani, Valeria L. Scarano University of Florence, Italy Department of Electronics and Telecommunications -

Slides:



Advertisements
Similar presentations
18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
Advertisements

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Acoustic design by simulated annealing algorithm
DEVELOPMENT OF A METHOD FOR RELIABLE AND LOW COST PREDICTIVE MAINTENANCE Jacopo Cassina.
SMJ 4812 Project Mgmt and Maintenance Eng.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
SCADA and Telemetry Presented By:.
Division of Operation and Maintenance Engineering Division of Operation and Maintenance Engineering 1 Reliability Analysis of Switches and Crossings –
SADARS An introduction to RF Spectrum Analysers With acknowledgements to Wikipedia.
Relex Reliability Software “the intuitive solution
Quality Control Project Management Unit Credit Value : 4 Essential
MAGNETO OPTICAL CURRENT TRANSFORMER Presented By: Shivankit Bansal Final Year Electrical Deptt.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Evaluating a Research Report
Thomas Berenz, MPIfR Bonn1 RF fiber optics 4 th SKADS Workshop, Lisbon, 2-3 October 2008 RF fiber optics Analog RF transmission with mechanically stressed.
Simulations of Beamforming Algorithms Stelio Montebugnoli, IRA-INAF, Medicina (BO), Italy, Giovanni Naldi, IRA-INAF, Medicina.
Presented By : LAHSAINI Achraf & MAKARA Felipe.  Introduction  Difficult Challenges : > Difficult Challenges between 2013 – 2020 > Difficult Challenges.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Digital Micromirror Device
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Electromagnetic Design of Broadband Antenna Feed Systems for the Northern Cross Radio Telescope (Bologna, Italy) Designed Broad Band Antenna Feed Systems.
Hazard Identification
SOFTWARE METRICS. Software Process Revisited The Software Process has a common process framework containing: u framework activities - for all software.
Safety-Critical Systems 7 Summary T V - Lifecycle model System Acceptance System Integration & Test Module Integration & Test Requirements Analysis.
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
Software Safety Case Why, what and how… Jon Arvid Børretzen.
J. Monari 2 nd SKADS Workshop October 2007 BEST-2 test bed: Radio over Fiber experiences Presented by Monari Jader IRA-INAF Radiotelescopio Croce.
Signamax™ Cabling System Review Revision E. INTRODUCTION.
Toulouse, September 2003 Page 1 JOURNEE ALTARICA Airbus ESACS  ISAAC.
Network design Topic 6 Testing and documentation.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
Advanced Science and Technology Letters Vol.47 (Architecture and Civil Engineering 2014), pp Electromagnetic.
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
Network Media. Copper, Optical, Fibre (Physical Layer Technologies) Introduction to Computer Networking.
Student’s Name with USN No.
Lectures 2 & 3: Software Process Models Neelam Gupta.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
DEPENDABILITY ANALYSIS (towards Networked Information Systems) Ester Ciancamerla, Michele Minichino ENEA {ciancamerlae, In.
Failure Modes and Effects Analysis (FMEA)
Rick Walker Evaluation of Out-of-Tolerance Risk 1 Evaluation of Out-of-Tolerance Risk in Measuring and Test Equipment Rick Walker Fluke - Hart Scientific.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Control Considerations for the KM3NeT Very Large Volume neutrino Telescope” The.
Toward a New ATM Software Safety Assessment Methodology dott. Francesca Matarese.
Fault Tree Analysis for the BLEDP Student meeting Vegard Joa Moseng.
Acknowledgements: This Research was sponsored by ONR Funds: N Study on the Electrical Performance and Aging of Polymer Insulation S. Grzybowski.
A fault tree – Based Bayesian network construction for the failure rate assessment of a complex system 46th ESReDA Seminar May 29-30, 2014, Politecnico.
Failure Modes, Effects and Criticality Analysis
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
SKA Interface Workshop: Dishes External Interfaces Thomas Kusel & Mark Bowen For Dishes consortium Manchester June 2013.
Root Cause Analysis Roger Brauninger
Guide for the application of CSM design targets (CSM DT)
Digital Receivers for Radio Astronomy
Martin Shaw – Reliability Solutions
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
OVERVIEW Impact of Modelling and simulation in Mechatronics system
Mild Environment Qualification and Maintenance
Sandis Spolitis, Inna Kurbatska, Vjaceslavs Bobrovs
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
Pareto Optimization to enable set-based Designs of ship systems
نگهداری پیش بینانه Predictive Maintenance
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Technical Foundations & Enabling Technologies – DS4
Managing and Improving Reliability across the Entire Life Cycle
YuankaiGao,XiaogangLi
Radiation tolerant fibres for LHC controls and communications
Chapter 5 – Distributed Elements
Luca Simoncini PDCC, Pisa and University of Pisa, Pisa, Italy
Presentation transcript:

1 M. Catelani, Valeria L. Scarano University of Florence, Italy Department of Electronics and Telecommunications - Tel/Fax: , Via S. Marta, Florence, Italy S. Montebugnoli, G. Bianchi, F. Perini I.N.A.F. - I.R.A., Italy National Institute for AstroPhysics - Institute of RadioAstronomy Tel: , via Fiorentina 3508/B Medicina (Bo), Italy Test and measurements of reliability performance on radioreceiver chains for the Northern Cross Radio Telescope (Bologna, Italy) Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium

2 Our research activities are focused on: Electrical and Electronic Measurements Reliability, Availability and Maintainability Automatic Diagnosis and Measurement Systems Fault Analysis and Diagnosis Device Stress Testing and Qualification Risk and Safety Analysis (FTA, FMEA, FMECA) Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium LabME: MEASUREMENTS, RELIABILITY AND QUALITY LAB LabME belongs to the Electronics and Telecommunications Department of the University of Florence

3 BEST: NORTHERN CROSS UPGRADING Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium Basic Element for SKADS Training (BEST): this is a project by IRA -INAF which gradually will upgrade part of the m² area of the Croce del Nord (Northern Cross). TARGET: to test and try new technologies and instrumentation systems to use on the SKA radiotelescope. Antennas (focal lines) Front-end Optical fibre links Receivers Beamforming algorithms Post-processing algorithms Calibration techniques Prototypes and algorithms developed in the BEST project: Northern Cross N

4 SKA radiotelescope, as the final system will be: expensive (about 1,5 billions of dollars) complex (about thousands/millions of antennas/receivers). A Reliability Analysis, both at device and system level, should be performed in order to evaluate design options and reduce the Frequency of Failures and, consequently, the Maintenance Costs. In the BEST project a reliability experimental analysis was performed in order to choose between two different kinds of receiver chain (Digital or Analogue optical link solutions); identify the most reliability critical items in the receiver chain. RELIABILITY EVALUATION Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium

5 Base band and A/D conversion Digital sampling clock and local oscillator signals Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium SIGNAL RECEIVER CHAINS: COAXIAL CABLE (1/2) Digital optical link solution

6 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium SIGNAL RECEIVER CHAINS: COAXIAL CABLE (2/2) Digital optical link solution block diagram

7 Base band and A/D conversion Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium SIGNAL RECEIVER CHAINS: OPTICAL FIBRE (1/2) Analogue optical link solution

8 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium SIGNAL RECEIVER CHAINS: OPTICAL FIBRE (2/2) Analogue optical link solution block diagram

9 Receiver chain performances based on Analogue optical link are better: potential wider bandwidth for further upgrading (up to 2.5 GHz) electrical insulation immunity to electromagnetic interferences Even concerning reliability and maintainability matters, the Analogue optical link solution seems to be better because: more devices in an easily reachable area  easier maintenance more devices in a sheltered environment  lower environmental stress levels RECEIVER CHAIN PERFORMANCES COMPARISON Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium

10 RELIABILITY PREDICTION Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium MIL-HDBK-217-FN2 data base Series reliability functional configuration 100% duty cycle Operating temperature: 30°C Environments: GM (Ground Mobile) for antenna equipment GF (Ground Fixed Uncontrolled) for cabin equipment GB (Ground Benign Controlled) for processing room equipment This analysis has been performed according to the following tools and hypothesis :

11 Above 80°C of operating temperature the MTBF values of the different solutions are quite the same. Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium RELIABILITY PREDICTION Optical fibre solution: Analogue optical link solution MTBF: h  4.2 years MTBF: h  1.2 years Coaxial cable solution: Digital optical link solution Analogue optical link solution Digital optical link solution

12 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium RELIABILITY PREDICTION and COSTS Sub-system Reliability prediction report Digital links optionAnalogue links option Total costs € ,72Total costs € ,90 Total costs do not consider the cost of the analogue optical transmitter and receiver, which can be obtained: COSTS of the complete Northern Cross antenna re-instrumentation (352 receivers) optical link configuration with analogue optical link coaxial cable configuration with digital optical link

13 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium RELIABILITY CRITICAL DEVICES The most reliability critical devices, in the case of the Analogue Optical Link solution, are those which are installed on the focal line of the antenna, i.e. the three stages front-end and the optical analogue transmitter In the whole Croce del Nord 352 devices of each type are needed. A failure of one of these devices calls for the removal and change of the failed device with a new one, with a cost of at least 500€ (about 420$), the most of which due to labour, and with a system down time of more than 4 hours. On the critical devices some reliability tests could be planned and implemented.

14 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium ENVIRONMENTAL TESTS ON CRITICAL DEVICES The Compliance Tests allow: To stress components or devices, in semifinal or final configuration, with environmental and electrical severities level comparable with the nominal ones. To compare, by a quantitative point of view, devices implemented in different technologies or carried out from different production processes. Example: Planned and Implemented Tests on INAF MEDICINA Front-End: Random Vibrations Test Cycling Humidity and Temperature Test The parameters chosen in order to verify the devices fault are the S-parameters. Possible Quality Tests: Pre-compliance/ Compliance Test Reliability Test: Life test, Accelerated/High Accelerated Life Test Environmental Stess Screening

15 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium THE FAILURE RATE FUNCTION (t) The failure rate function for electronic components and systems  latent defect: defect that it exists but that has not been still recognized  failure: the attitude of an entity (component, device, etc.) cease to execute the demanded function  failure mechanism: the chemical, physical process or of other nature that generates the breakdown

16 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium STRESS FACTORSCHEMICAL AND PHYSICAL MODELS TEMPERATUREARRHENIUS TEMPERATURE+BIASEYRING TEMPERATURE CYCLESCOFFIN –MENSON POWER CYVLESCOFFIN – MENSON TEMPERATURE AND HUMIDITYREICH HAKIM EYRING PECK VOLTAGE AND CURRENTEYRING POSSIBLE FUTURE RESEARCH ACTIVITIES: RELIABILITY TESTS Life Tests have the aim to verify or evaluate the component or device life in specific environmental conditions, which simulate the operating conditions. Accelerated Reliability Tests are Life Tests in which the environmental severities levels are higher than the operating conditions in order to decrease the test time. In order to extend the validity of the results test to real operating life the application of some chemical and physical models are necessary.

17 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium POSSIBLE FUTURE RESEARCH ACTIVITIES: ENVIRONMENTAL STRESS SCREENING Why the ESS? Variability of the characteristics of the production processes, also in electronics Necessity to evidence the intrinsically weak population in short times and with low costs The necessity to satisfy the lack of reference data that concur to correlate the effectiveness of solicitation types and levels with occurring of the failures What is necessary for the definition of the test plan? To choose in opportune way the type (environmental, electrical, etc); and the severities (profile test) of stress, the application of the solicitation does not have to induce undesired failure mechanisms in the device under test. Application of environmental and/or electrical stresses to electronic components/devices (DUT) with the scope to transform the latent defects in premature failures. [MIL-HDBK 344 A] Applied stress Vs strength for intrinsically weak and good devices

18 Valeria L. Scarano Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium CONCLUSIONS Optical fibre receiving chain was chosen because of better performances and higher reliability  lower maintenance costs; The devices installed on top of the focal lines are identified as the most reliability critical  a test plan was planned and implemented with good results.  M.Catelani, M IEEE, V. L. Scarano, SM IEEE, R. Singuaroli, S. Montebugnoli, G. Bianchi, F. Perini, I. Trotta, “Northern Cross Radiotelescope: test and measurements of reliability performance on radioreceiver chains”, “IEEE Transactions on Instrumentation and Measurement (TIM)”, Volume 58, Issue 10, Oct Page(s):3769 – 3777, ISSN:  M.Catelani, V.L.Scarano, R.Singuaroli, S.Montebugnoli, G.Bianchi, F.Perini, “Environmental Testing: Behaviour of a Radioreceiver Chain Front-end”, “Metrology And Measurement Systems”, Volume XVI - Number 1/2009, ISSN FUTURE RESEARCH ACTIVITIES FOR THE RADIORECEIVER CHAINS Pre-compliance/ Compliance Test Environmental Stess Screening Reliability Test: Life test, Accelerated/High Accelerated Life Test The dimension and the cost of the SKA radiotelescope suggested to deep the reliability of the instruments and devices that will be implemented. Reliability analysis should be performed in terms both of Reliability Prediction and Environmental Tests as:

19 M. Catelani, Valeria L. Scarano University of Florence, Italy - Tel/Fax: , Via S. Marta, Florence, Italy S. Montebugnoli, G. Bianchi, F. Perini INAF, Italy Tel: , via Fiorentina 3508/B Medicina (Bo), Italy Test and measurements of reliability performance on radioreceiver chains for the Northern Cross Radio Telescope (Bologna, Italy) Final Meeting of the EC FP6 Programme SKADS 4-6 November 2009, Château de Limelette, Belgium Thank you for your attention!