System Approach to RFI Mitigation for the SKA Rob Millenaar – SKA Program Development Office Albert-Jan Boonstra – ASTRON Rodolphe Weber – University.

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
SADC HPC Workshop, 2 Dec 2013, Cape Town
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Schediwy: Advantages and Disadvantages of Sparse Aperture Arrays Fermilab: October 2009.
Baseband Processing and SKA Simulations using Supercomputers: Enhancing Australia‘s radio astronomy facilities and its bid for the SKA Steven Tingay Swinburne.
IUCAF SUMMER SCHOOL 2002 MITIGATION TECHNIQUES MITIGATION FACTORS - what is it? what is it good for? by Klaus Ruf.
Frequency Management Aka why you can detect any astronomical signals at all Dr. Karen O’Neil Green Bank Site Director.
SKA South Africa Overview Thomas Kusel MeerKAT System Engineering Manager April 2011.
Probing the field of Radio Astronomy with the SKA and the Hartebeesthoek Radio Observatory: An Engineer’s perspective Sunelle Otto Hartebeesthoek Radio.
Radio Quiet Zones Carol Wilson, CSIRO 3 rd Summer School in Spectrum Management for Radio Astronomy 31 May – 4 June 2010, Tokyo.
Interference Daniel Mitchell, ATNF and Sydney University.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
What’s Going on in Canada?
Radio Quiet Zones (RQZ) History and Current Activities Tasso Tzioumis ATNF, CSIRO.
Name1 title 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Progress in Active Antenna Design and Developement - FIDA3 Timothy Finn FG-IGN
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Wireless LAN Technology. WIRELESS LAN TECHNOLOGY SPREAD SPECTRUM LAN Configuration Except for quite small offices, a spread spectrum wireless LAN makes.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
Assessment of RFI measurements for LOFAR Mark Bentum, Albert-Jan Boonstra, Rob Millenaar ASTRON, The Netherlands Telecommunication Engineering, University.
EMI in an RQZ: the need for buffer zones Carol Wilson, CSIRO Research Consultant RFI2010, Groningen.
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
1 © 2011 Cisco and/or its affiliates. All rights reserved. Ultra High-speed Telecommunication Requirements for the SKA Peter Elford Business Development.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Phased Array Feeds John O’Sullivan SKANZ 2012 CSIRO Astronomy and Space Science,
Road to MeerKAT KAT-7 DBE Alan Langman. meerKAT Overview Objectives of meerKAT Location Location Location MeerKAT Engineering Specification Prototypes.
The $20 Billion Question: Can Satellite and Terrestrial Wireless Co-Exist in C-band? David Hartshorn Secretary General GVF.
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Meteorological Spectrum Issues- Outcome of the 2003 World Radiocommunication Conference Presented By: David Franc National Weather Service December 2,
XNTD/SKAMP/LFD Correlator 4th RadioNet Engineering Forum Workshop Next Generation Correlators for Radio Astronomy and Geodesy June 2006, Groningen,
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
Radio Quiet Zones (RQZ) - working with your national administration Tasso Tzioumis Australia Telescope National Facility (ATNF)
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
System Approach to RFI Mitigation for the SKA Rob Millenaar – SKA Program Development Office (SPDO), Manchester, UK
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Designing for High Density Wireless LANs Last Update Copyright Kenneth M. Chipps Ph.D.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
MeerKAT DBE Past Present Future Alan Langman 28 September 2009.
02/6/ jdr1 Interference in VLBI Observations Jon Romney NRAO, Socorro ===================================== 2002 June 12.
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
Radio Quiet Zones (RQZ) Tasso Tzioumis ATNF, CSIRO RAFCAP.
Adaptive Filters for RFI Mitigation in Radioastronomy
2 nd SKADS Workshop October 2007P. Colom & A.J. Boonstra 1 Outline -progress in RFI mitigation (methods inventory) -system design & RFI mitigation:
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Radio Frequency Interference.
© 2014 IBM Corporation IBM Research - Zurich VCSEL based Radio-over-Fiber Links for Radio Astronomy Jonas Weiss, IBM Zurich Research Lab, Switzerland.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
Presentation to the Portfolio Committee on Science and Technology By Vodacom (Pty) Ltd 1 August 2007.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
A Radio-quiet Zone for the SKA Michelle Storey CSIRO Australia Telescope National Facility.
Atmospheric phase correction at the Plateau de Bure interferometer IRAM interferometry school 2006 Aris Karastergiou.
RADIO FREQUENCY SPECTRUM POLICY NOVEMBER Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development 2 WHAT IS SPECTRUM?
Square Kilometre Array eInfrastructure: Requirements, Planning, Future Directions Duncan Hall SPDO Software and Computing EGEE 2009.
Antenna Arrays and Automotive Applications
Doc.: IEEE a Submission November, 2003 CRL-UWB ConsortiumSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Kate Chow Carol Wilson, Lisa-Harvey Smith, Balt Indermuehle, and MWA The MRO, Australia’s radio-quiet site: enabling world-class radioastronomy CSIRO ASTRONOMY.
Design and implementation of monitoring systems Jan Verduijn Chairman ITU-R WP1C on Spectrum Monitoring ITU-D expert.
RFI Protection Activities in IAA RAS
RFI Protection Activities in IAA RAS
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
Mid Frequency Aperture Arrays
Mobile Broadcast and Spectrum Issues (DVB-T) Workshop April 2003
Phased Array Feeds Wim van Cappellen
Efficient mitigation of RFI at radio astronomy observatories
Monitoring RF Spectrum in MODERN WIRELESS ERA
OECD and Radio Astronomy Spectrum
Radio Astronomy Spectrum Management in practice – Australia (ATNF)
Technical Foundations & Enabling Technologies – DS4
Presentation transcript:

System Approach to RFI Mitigation for the SKA Rob Millenaar – SKA Program Development Office Albert-Jan Boonstra – ASTRON Rodolphe Weber – University of Orleans 30 March, 2010 RFI2010

System wide approach to RFI mitigation Overview Introduction Concepts of the SKA Receptor technology types Array layout System wide approach to RFI mitigation the RFI/EMI Environment EMC Reduction of susceptibility to RFI Mitigation in hardware and software 30 March, 2010 RFI2010

Introduction Setting the scene 30 March, 2010 RFI2010

The Square Kilometre Array In a nutshell: The next generation radio telescope with ~50 times sensitivity and ~10,000 times the survey speed of the best current day radio telescopes. It will operate from 70 MHz to 10 GHz Baselines of 3000+ km Candidate sites: Southern Africa, Karoo Australasia, Boolardy 30 March, 2010 RFI2010

The Square Kilometre Array The SKA will have: up to 3000 dishes, with: wide band single pixel feeds phased array feeds ~1 GHz (300 MHz) to >10 GHz up to 250 dense Aperture Array stations (56m dia), with: ~70,000 dual pol elements, so ~150,000 receiver chains for a total of ~4 107 ~400-~1400 MHz up to 250 sparse Aperture Array stations (180m dia), with: ~10,000 dual pol elements, so ~20,000 receiver chains, for a total of ~5 106 ~70-~450 MHz 30 March, 2010 RFI2010

Configuration 30 March, 2010 RFI2010

Configuration 30 March, 2010 RFI2010

The challenge Requires a rigorous system-wide mitigation approach. The conclusion should be that: There will be various types of technology, much of which is concentrated in high densities  risk of strong electromagnetic coupling With differing frequency ranges what is out-of-band RFI for one is in-band for the other technology type, so all designs must be done for entire SKA frequency range! With extreme required operational sensitivity RQZ and handpicked remote sites, plus further regulation Systems and parts should be cheap to produce, to maintain challenges expensive shielding methods Requires manageable data rates must limit number of bits to be transported and processed This results in a nightmare for EMI and RFI control, the scale of which was never seen before. Requires a rigorous system-wide mitigation approach. 30 March, 2010 RFI2010

System Wide Mitigation of RFI 30 March, 2010 RFI2010

Provide best RFI/EMI environment EMC policy System Wide Approach What should be done Provide best RFI/EMI environment EMC policy Reduction of susceptibility to RFI Mitigation in hardware and software 30 March, 2010 RFI2010

Provide best RFI/EMI environment EMC policy System Wide Approach What should be done Provide best RFI/EMI environment EMC policy Reduction of susceptibility to RFI Mitigation in hardware and software 30 March, 2010 RFI2010

Provide best RFI/EMI environment Investigate and select sites EMI/RFI Environment Provide best RFI/EMI environment Investigate and select sites Establish RQZ Spectrum regulation/law making on local + national levels + active support of local community Once the perfect site is found, place antennas sensibly (Configuration design) 30 March, 2010 RFI2010

Further site characterisation is underway Site Selection The two shortlisted sites are the best in the preferred region on the globe. Further site characterisation is underway RFI has been measured and will be done again with higher sensitivity. 30 March, 2010 RFI2010

RFI environment at the core Site characterisation results of the campaign of 2005 are available. Next slide shows ‘mode 1’ results: inventory of strong RFI, potentially detrimental because of receiver linearity. Includes high speed sampling results (2μs) from 960 to 1400 MHz. Was done for 4 to 6 antenna pointings, two polarisations. Next slide shows results of two sites combined: Take maximum level of pointings/polarisations per site; Plot minima and maxima of the two datasets. 30 March, 2010 RFI2010

RFI environment at the core Mode 1 overall spectrum, 70MHz to 22 GHz 30 March, 2010 RFI2010

Unavoidable RFI It is evident that, regardless of all measures that we take, receiver systems will have to deal with unavoidable types of RFI: Airborne Comms Narrow pulse & high power: nav/ATC (DME, SSR, …) Satellites NOAA series Iridium, GPS, Galileo Geostationary (broadcasting, FLTSATCOM) … 30 March, 2010 RFI2010

New RFI Campaign Purpose: High sensitivity measurements (close to RA769 levels) at the core, and some remote sites at slightly less sensitivity. In addition high time resolution measurements to capture strong short events. The campaign: Deployment at AUS and SA core sites, start measurements for ~2 months Target start June 2010 To coordinate with precursor site activities Measure with identical equipment (tested and verified at same facility), same period. Measure selection (~4 per country) of remote sites Write site reports, by April 2011. 30 March, 2010 RFI2010

SKA SA RF, trailer infrastructure, integration New RFI Campaign Partners: ASTRON data processing software, binary data format, reporting software SKA SA RF, trailer infrastructure, integration CSIRO Digital spectrometer, data acquisition 30 March, 2010 RFI2010

New RFI Campaign 30 March, 2010 RFI2010

Campaign Sensitivity 30 March, 2010 RFI2010

Specific attention by ITU WP-7D and Correspondence Group Radio Quiet Zones Both sites are establishing Radio Quiet Zones at the location of the core. ~150 km radius Specific attention by ITU WP-7D and Correspondence Group Activities are being monitored by a dedicated Task Force under the SCWG. Note: Presentations on RQZ’s yesterday 30 March, 2010 RFI2010

Radio Quiet Zone Targets 30 March, 2010 RFI2010

Further spectrum regulation Spectrum regulation/law making on local + national levels. Enforcement required. Support of local community Alternative means of communication (cf. Adrian Tiplady’s talk) Fibre to the farm Fix noisy cars Fix noisy electronics (cf. Pravin Raybole’s talk) Work with industry on low noise power distribution, etc. 30 March, 2010 RFI2010

Array Planning and Design Place antennas sensibly: Zones of avoidance defined in ‘masks’ buffer zones around EMI sources Roads, rail, farms, towns buffer zones around RFI sources Mobile comms, broadcasting See presentation by Carol Wilson 30 March, 2010 RFI2010

Provide best RFI/EMI environment EMC policy System Wide Approach What should be done Provide best RFI/EMI environment EMC policy Reduction of susceptibility to RFI Mitigation in hardware and software 30 March, 2010 RFI2010

Appoint EMC Manager, responsible for: EMC Policy Appoint EMC Manager, responsible for: Definition of standards, best practice descriptions from industry and radio astronomy community EMC requirements for all parts of project Application of these to all designs and equipment Assessment of COTS hardware risks and modification Development of test systems, methods Development of EMC plan including specifications Ongoing RFI monitoring ‘EMC police’ 30 March, 2010 RFI2010

EMC rules apply in all directions: EMC Policy EMC rules apply in all directions: 30 March, 2010 RFI2010

What are items to worry about? EMC Policy What are items to worry about? Radiating receivers or parts Digitisation at the receiver Telescope drive systems … But also: Wireless XX, remote YY, mobile ZZ in use by staff, contractors, visitors, tourists… This is a worry at any radio telescope, but for the SKA the scale is humongous. 30 March, 2010 RFI2010

Provide best RFI/EMI environment EMC policy System Wide Approach What should be done Provide best RFI/EMI environment EMC policy Reduction of susceptibility to RFI Mitigation in hardware and software 30 March, 2010 RFI2010

Receiver robustness: a balancing act Susceptibility Receiver robustness: a balancing act Design for Wide band High gain Low noise Low cost Manufacturability in large quantities Design for Sufficient Rx headroom Linear operation, IP Keep power requirements low 30 March, 2010 RFI2010

Digitisation: a balancing act Susceptibility Digitisation: a balancing act Design for High performance SFDR Required dynamic range: sky noise vs interference level that one aims to mitigate down the line  many bits Design for Low cost Low power Few bits, because of Cost for hardware Signal transport Signal processing in station and correlator 30 March, 2010 RFI2010

Provide best RFI/EMI environment EMC policy System Wide Approach What should be done Provide best RFI/EMI environment EMC policy Reduction of susceptibility to RFI Mitigation in hardware and software 30 March, 2010 RFI2010

Mitigation Mike K: on-line RFI mitigation is possible and required, but must be robust Hardware architecture/techniques: Narrow channelisation in frequency and time allows old fashioned RFI excision to be efficient Cancellation trough: ANC Parametric Estimation Spatial Filtering Subspace Filtering … Automated flagging/excision as part of the processing pipeline 30 March, 2010 RFI2010

Conclusions 30 March, 2010 RFI2010

Conclusions We have a serious problem on our hands… But we can succeed if A system wide approach is followed, to Select the best possible environment Protect that pristine environment By preventing self-generated RFI By setting and enforcing appropriate design practices Prevent unavoidable levels of RFI from hurting us Robust receivers Robust digitisation and processing RFI consequences that still remain, dealt with by Effective automatic detection and mitigation in hardware, pre- and postcorrelation, and in (pipeline) software 30 March, 2010 RFI2010