doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date: Authors:
doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 2 Abstract This document is the closing report for the TGac for the September 2013 session.
doc.: IEEE /1226r0 Submission Work Completed Completed the resolution of SB 01 comments received on draft D6.0 –Comment spreadsheet is available at: comments-d6-0.xls comments-d6-0.xls Prepare draft D7.0 and start a second recirculation sponsor ballot. Discussed QoS simplification proposal in doc 11-13/1170r1. Motion to add the proposed changes in draft D7.0 didnt achieve the required 75%. Prepared draft report to Revcom requesting conditional approval by November. –A draft report is available at 11-13/1175r1 Agenda for this meeting is available in document 11-13/0950r3. September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 3
doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 4 November 2013 Goals Complete the comment resolution on draft D7.0 and start a new recirculation sponsor ballot on draft D8.0. Finalize and approve the report to the EC for conditional approval to forward to Revcom.
doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 5 Conference Call Times Oct 17, Oct. 31, Nov 1410:00 -12:00 ET Oct 7, Oct 10, Oct. 24, Nov 7, Nov 2120:00 – 22:00 ET