WSDP Whole School Development Plan

Slides:



Advertisements
Similar presentations
Technology Integration Plan (TIP) Overview Meeting Welcome TIP Teams.
Advertisements

Rajiv Vidya Mission (SSA) HYDERABAD. Web–enabled school mapping helps to  Identify habitations without access to schooling facilities.  Conduct proximity.
Benefits of having Optimal Technical Staffing & Supervision Structure for SSA Civil Works Sarva Shiksha Abhiyan Mission Gujarat.
IMPLEMENTATION OF WHOLE SCHOOL DEVELOPMENT PLAN IN SCHOOLS OF GUJARAT
Environmental Assessment Survey of School Building.
SCHOOL MAPPI NG PRESENTATION BY SATISH GIROTRA Senior Consultant, TSG, EDCIL.
CUMULATIVE PROGRESS (PHYSICAL STATUS) State:DELHI S. No.Activities Targets till date (Units) Cumulative Completed (Units) Cumulative In Progress (Units)
Kabir Vajpeyi, Advisor Infrastructure, SSA
E-content Generation and Delivery Management for Student Centric Learning CONTROL NUMBER : DE Dr DVLN Somayajulu Professor, PI and Institute.
By Satish Girotra Implementation of school infrastructure.
State of Municipal Education in Mumbai December 2014 Supported by FORD FOUNDATION 1.
Discussions in 20th CW review meeting of SSA KEY DEVELOPMENTS SINCE LAST 19 TH CIVIL WORKS REVIEW.
IVCC GOES E-CATALOG: WHAT, WHY... AND HOW GOOD IT'S BEEN! Tracy Morris, Illinois Valley Community College Greg Soare, Leepfrog Technology.
Computers: Tools for an Information Age
UBSUP : Area Assessment and Site Selection Prepared by the UBSUP Team July 2014 WATER SERVICES TRUST FUND (WSTF) 1 ‘’Good area assessment and selection.
NME-ICT Project Implementation of virtual laboratory for online e-learning of control and Instrumentation courses R.Anandanatarajan M.E.,Ph.D. Professor.
General Statistics Office of Vietnam THE 2009 VIETNAM POPULATION AND HOUSING CENSUS.
Green City, Clean Waters: Philadelphia Green Schoolyards
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
Ministry of Works & Human Settlement Royal Government of Bhutan.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
SAG INFOTECH PVT. LTD Help Manual For Online HVAT filing SOFT SOLUTION FOR THOSE WHO CAN”T AFFORD TO MAKE ERROR.
Chapter 6 System Engineering - Computer-based system - System engineering process - “Business process” engineering - Product engineering (Source: Pressman,
1 Software Testing (Part-II) Lecture Software Testing Software Testing is the process of finding the bugs in a software. It helps in Verifying and.
MES Implementation in a Defense Industry Company CON
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
SCHOOL INFRASTRUCTURE SURVEY
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
To share information in four (4) critical areas for districts considering upgrading from the legacy STIOffice & STIDistrict applications to InformationNOW.
MAJOR FINDINGS OF MONITORING INSTITUTES ON IMPLEMENTATION OF THE MDM PROGRAMME IN STATE OF MANIPUR i. Name of the Monitoring Institution: Monitoring Institute,
Environmental Assessment Survey of School Building Sarva Shiksha Abhiyan Mission Gujarat State Annexure-VI.
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
MONITORING REPORT (MDM), MIZORAM Major Field Observations of Monitoring Institution, Mizoram University on Status of Implementation of MDM Scheme in Mizoram.
FOURTEENTH JOINT REVIEW MISSION 18 TH TO 28 TH JULY 2011 (Recommendations)
Individual Assistance (IA) Forms Provided to assist you with reporting damages. Same general type of form that FEMA will use if a federal assessment is.
Status of Municipal Education in Mumbai December 2013 Supported by FORD FOUNDATION 1.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
1 MID DAY MEAL SCHEME MEGHALAYA. State Profile NUMBER OF SCHOOLS 2 Source: O/O Sub-Divisional School Education Officer As on S.NODistricts.
`.  SSA-RTE Objectives  At a glance  Outcome Indicators  RTE Preparedness  School mapping exercise  Physical Achievement  Financial Achievement.
Electronic Exchange of Drinking Water Lab Data Presented by: Mike Matsko NJDEP Exchange Network Users Meeting April 18, 2006.
Mid Day Meal Scheme MDM-PAB Meeting –HARYANA On
District and Subordinate Courts Application Software Standardization.
Click to edit Master subtitle style Presentation on the major findings of Monitoring Institutes on implementation of the MDM-RTE programme in the State.
An Enterprise Approach to Using Oblique Photography Fred S. Baltrusis & David Surina Indianapolis/Marion County Fred S. Baltrusis & David Surina Indianapolis/Marion.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Update on changes made to ICRM software Ronel Steinhobel 15 September 2015 IDEAL CLINIC PROGRAMME Problems identified with capturing of data.
Candidates: Administrators:
Welcomes All the Delegates For a Presentation on School infrastructure facility Survey Project.
Control System Design Process Planning Documentation.
2010 PHC NATIONAL PUBLICITY COMMITTEE SENSITIZATION WORKSHOP SEPTEMBER BASIC CONCEPTS, COVERAGE.
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
Campus Texas STaR Chart Presentation for Los Fresnos HS Technology Leadership EDTC Project 2 Jaime Villarreal.
Building Preservation Environments with Data Grid Technology Reagan W. Moore Presenter: Praveen Namburi.
EDU620: Meeting Individual Student Needs With Technology Dr. Tamara Carter District Educator Community Event (Final Project) 4/25/16.
University of Toronto at Scarborough © Kersti Wain-Bantin CSCC40 testing and installation 1 for testing you need: test data and test cases test plans and.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
Green Building Certification Systems for Existing Buildings John Park, PE, CEM, CSDP Dept of Veterans Affairs June, 2009.
EGI Foundation (Session Chair)
Principles of Information Systems Eighth Edition
Photo-Realistic Visualization
Testing the System.
Intel® Teach to the Future
Addressing Local Priorities in Primary Education – Issues & Perspectives Dipak Ray (OPEPA, D/O S & ME)
Standards for success in city IT and construction projects
Management System of Engineering Structures
Happy School TEACH Program Happy School.
Presentation transcript:

WSDP Whole School Development Plan Gujarat

WSDP A holistic school development plan Combination of educational plan that guides the infrastructure plan and its effective usage in learning processes Reflects the vision of a school & ways to achieve it Master plan and base document for school educational as well as infrastructure works & its development in phases

WSDP: Guiding Principles Child as an important stakeholder in the planning process Address the goals of SSA-RTE and NCF Better use of available existing facilities Verify the available infrastructure as per standards & norms Integration of multiple planning inputs Improve the present and plan for future Simplified documentation Ownership by community

WSDP In Gujarat

WSDP: Planning WSDP for 32749 Govt. schools Development of Infrastructure Survey Form Survey by In house Engineers Measure of school campus Online Software development Analysis of Data as per RTE Data used for WSDP

WSDP: Implementation Process Development of Infrastructure Survey Form Status of built environment Compare the status with standard norms Form developed with help of Block/District/ SPO Engineers Training given to Engineers Pilot Study: 2 Schools per block by each Engineer Finalization of Survey Form

WSDP: Implementation Process Topics covered in Infrastructure Survey Form General information of School Location of School Campus (Out Door Environment) Each Building Design Each Class Room Environment Toilet Block Drinking Water MDM Kitchen Shed Comments/ Remarks Form

WSDP: Implementation Process Survey by In house Engineers 25 District Project Engineers 20 Architecture at District level 387 Block level Engineers 32749 Schools surveyed Survey period: Sep to Dec’2011

WSDP: Implementation Process Measure of school campus Using GPS/DGPS and total station equipment Preparation of plan showing All the structures in the school premises Location of big trees, green fence School Campus Surrounding Level at 5 mtr. Grid Interval of School campus Four photographs of school taken from different angles Three hard copy and Softcopy in AutoCAD format Survey done by Agency Plan

Photographs of school taken from different angles

WSDP: Implementation Process Online Software development Web based application developed DISE data used as source for School Master Different level users created State (1) District (26) Block (224) Status Reports created School level information available at all level users for monitoring Data Entry done by Engineers Screen Shot

WSDP: Implementation Process Analysis of Data Requirement of ACR / HM Room Primary/Upper Primary School Toilet Block (Boys/Girls) Compound Wall (Actual RMT) MDM Kitchen Shed (Area Base) Water Facility Ramp and Railing Electricity Condition of Existing infrastructure Usable Repairable (Major / Minor) Damage Excel File

Thanks